Water and Sewer Tap Fees by City (2026)
In the cities where our verified fee rows add up to a complete figure, the official water and sewer charges for one new single-family home run from $2,416 in Salt Lake City to $29,322 in Phoenix’s Northwest impact-fee area. Most land between about $5,000 and $15,000. Denver ($17,380 on a 7,000-square-foot lot) and Charlotte ($17,370 when Charlotte Water installs both connections) sit near the top of that range. These are government charges only. The pipe from the property line to the house, trenching, and the plumber’s permit come on top.
The table below builds each total from the published fee schedule and shows the arithmetic, so you can check which charges we counted and swap in your own meter size or lot size. Every figure links to the utility’s own document.
| State | Jurisdictions | Fee rows | Latest verified |
|---|---|---|---|
| AL | 3 | 38 | 2026-09-26 |
| AR | 3 | 50 | 2026-09-30 |
| AZ | 7 | 86 | 2026-09-30 |
| CA | 3 | 41 | 2026-09-25 |
| CO | 9 | 202 | 2026-09-25 |
| CT | 2 | 23 | 2026-09-30 |
| FL | 11 | 198 | 2026-09-30 |
| GA | 3 | 42 | 2026-09-30 |
| IA | 2 | 14 | 2026-09-26 |
| ID | 3 | 33 | 2026-09-30 |
| IN | 2 | 22 | 2026-09-30 |
| KS | 2 | 19 | 2026-09-26 |
| KY | 3 | 37 | 2026-09-30 |
| LA | 2 | 13 | 2026-09-30 |
| MI | 2 | 37 | 2026-09-30 |
| MN | 2 | 10 | 2026-09-26 |
| MO | 2 | 21 | 2026-09-30 |
| NC | 7 | 139 | 2026-09-30 |
| NE | 2 | 38 | 2026-09-26 |
| NJ | 2 | 13 | 2026-09-30 |
| NM | 2 | 23 | 2026-09-30 |
| NV | 2 | 39 | 2026-09-24 |
| OH | 2 | 28 | 2026-09-25 |
| OK | 2 | 22 | 2026-09-24 |
| OR | 2 | 39 | 2026-09-24 |
| PA | 2 | 28 | 2026-09-26 |
| RI | 1 | 11 | 2026-09-26 |
| SC | 4 | 50 | 2026-10-21 |
| TN | 5 | 73 | 2026-09-30 |
| TX | 17 | 203 | 2026-09-30 |
| UT | 5 | 47 | 2026-09-30 |
| VA | 2 | 25 | 2026-09-25 |
| WA | 3 | 34 | 2026-09-25 |
| WI | 2 | 30 | 2026-09-30 |
National comparison: official connection charges for a typical new home
Core charges = capacity, impact or system development fees + utility-installed tap or connection fees + meter charges, for the smallest standard residential meter the schedule lists. Excludes building and plumbing permits, inspections, deposits, private service lines and non-utility impact fees (roads, parks, schools). Checked 2026-09-24.
The city name is not always the utility: some addresses fall in a special district or county system, so confirm the water and sewer provider for your address before relying on a row.
| City | Utility | Meter | Core charges | How we got the number | Effective |
|---|---|---|---|---|---|
| Austin, TX | Austin Water | 5/8″ | $7,700 | $4,800 water + $2,900 wastewater Capital Recovery Fee × 1 service unit, plats recorded on or after 10/1/2023. Meter and tap charges excluded because the FY2027 sheet says they await adoption. Source | Current web page |
| San Antonio, TX | SAWS | 5/8″ | $7,343–$11,528 | Water impact $5,470–$5,987 (by elevation zone) + sewer impact $1,873–$5,541 (by collection area). Private contractors usually install the service, so no SAWS tap fee. Source | Plats from 7/1/2024 |
| Houston, TX | Houston Public Works | 1 SU | $4,383 | $2,553.11 water + $1,830.24 wastewater impact fee per service unit, for applications accepted after 6/30/2026. Indexed each July 1; next adjustment 7/1/2027. Source | 7/1/2026 |
| Fort Worth, TX | Fort Worth Water | 5/8″ | $5,828 | $2,990 water + $2,838 wastewater impact fee for permits issued from 10/1/2026 (FY2027). Permits issued 10/1/2025–9/30/2026 paid $2,824 + $2,680 = $5,504. City-installed taps ($3,000+ water, $2,600+ sewer) are extra. Impact · Taps | FY2027 |
| El Paso, TX | El Paso Water | under 1″ | $5,270–$7,340 | $4,380 water service connection + $890 sewer connection = $5,270. Inside the three impact-fee areas, add $1,880 (Northeast), $2,031 (Westside) or $2,070 (Eastside). Connection · Impact | 7/8/2026; impact 5/7/2024 |
| Frisco, TX | Frisco Public Works | 1″ | $5,299 (confirm with utility) | $835 meter fee (includes $150 deposit) + $2,120 water + $2,344 wastewater impact fee from a 2019 table we could not confirm is current. Taps are quoted separately. Meter · Impact | Meter 3/2/2026 |
| McKinney, TX | City of McKinney | 1″ | $3,645 + impact | $1,450 water tap + $1,630 sewer tap + $565 meter set, no pavement work. Impact fees ($2,929 + $2,744 for 1″) come from a table we marked “Confirm with utility”. Taps · Impact | FY2026 |
| Charlotte, NC | Charlotte Water | 5/8″ | $6,727–$17,370 | Utility-installed: $4,407 water connection + $1,453 water SDF + $5,066 sewer SDF + $6,444 sewer connection = $17,370. Developer-built lot: $1,453 + $5,066 SDFs + $208 meter = $6,727. Source | FY2027 |
| Raleigh, NC | Raleigh Water | 5/8″ | $3,960–$14,871 | $1,447 water + $2,223 sewer capital facility fees + $290 meter = $3,960. If the city makes the taps, add $5,756 (3/4″ water) + $5,155 (4″ sewer). Source | FY2027 |
| Nashville, TN | Metro Water Services | 5/8″ | $860 + capacity | $500 water tap + $360 sewer connection. Capacity is $1,375 water + $2,300 sewer per 350-gpd unit of flow; the number of units assigned to a house is set administratively and was not published in the code. Water · Sewer | Metro Code |
| Orlando, FL | OUC + City of Orlando | 5/8″ | $5,323–$9,018 | OUC water SDC $2,325 + city sewer impact $2,537.50, plus either $460 meter set (builder installs line) or $4,155 full OUC service. A $2,950 city sewer lateral applies if needed. OUC · City | OUC 1/2026 |
| Orange County, FL (unincorporated) | Orange County Utilities | 1 ERU | $8,060 | $2,790 water + $5,270 wastewater capital charge per ERU, paid at building permit. Source | County Code 37-5 |
| Tampa, FL | City of Tampa | 3/4″ | $6,415 (confirm with utility) | $2,800 water connection + $1,713 water capacity + $665 meter install (2021 water document) + $1,237 wastewater capacity. CIAC areas use different water charges. Water · Wastewater | Water 2021 |
| Charleston, SC | Charleston Water System | 3/4″ | $11,490 | $4,620 water impact + $6,670 sewer impact + $200 sewer tap. On 1/1/2027 impact fees rise to $5,115 + $8,160. Source | 1/1/2026 |
| Denver, CO | Denver Water + City of Denver | 5/8″ | $17,380 | SDC $3,380 + 7,000 sf × $1.01 = $10,450; + $185 tap + $265 meter + $6,480 sewer permit fee. SDC · Tap and meter · Sewer | 7/1/2026 |
| Colorado Springs, CO | Colorado Springs Utilities | 3/4″ | $14,896 | Lot of 5,000–6,999 sf: $7,243 water development + $5,260 water resource + $1,868 wastewater development + $525 tap. Across all lot sizes the fees alone run $11,012–$20,769. Source | 1/1/2025 (current) |
| Fort Collins, CO | Fort Collins Utilities | 3/4″ | $8,848 + water supply | 7,000 sf lot: $914 + 7,000 × $0.494 = $4,372 water plant investment fee + $4,476 sewer plant investment fee. The water supply requirement ($63,800 per acre-foot cash-in-lieu) is often the largest cost and depends on the lot. Source | Code 8/27/2026 |
| Phoenix, AZ | City of Phoenix | up to 1″ | $7,467–$29,322 | Balance of City, off-project: $4,387 water treatment + $2,009 water resource + $1,071 wastewater treatment. Northwest: $4,387 + $2,009 + $3,753 + $14,046 transmission + $5,127 collection. Add a $95 sewer tap. Impact fees · Sewer tap | 6/23/2025 |
| Tucson, AZ | Tucson Water + Pima County | 5/8″ | $6,423–$7,383 | $1,740 service line and meter (unpaved; $2,700 paved) + $240 CAP water resource fee + $4,443 Pima County sewer connection fee. Service · CAP · Sewer | 7/6/2026; FY2026-27 |
| Las Vegas, NV | LVVWD/SNWA + City of Las Vegas | 5/8″ | $14,946 + frontage | $7,998 SNWA regional connection + $2,371 facilities connection + $1,177 service installation + $165 meter installation + $3,235 city sewer. Frontage charge of $17 per front foot ($1,190 minimum) where it applies. LVVWD · Sewer | 3/1/2026; 1/1/2026 |
| Salt Lake City, UT | SLC Public Utilities | 3/4″ | $2,416 | $1,871 water connection + $545 sewer connection. Meter hardware billed at cost. A proposed increase to $5,577 + $4,300 was pending when we checked. Source | FY2027 |
| Portland, OR | Portland Water Bureau + BES | 5/8″ | $13,947 + sewer SDC | $5,483 water SDC + $8,464 new 1″ service (no paving). Sewer SDC is $623 per drainage fixture unit at 60% for homes; fixture count depends on the plans. New housing permitted 8/15/2025–9/30/2028 may be exempt from SDCs. Water · BES | FY2026-27 |
| Seattle, WA | Seattle Public Utilities | 3/4″ | $14,630–$16,005 | $6,900 water SDC + $2,600 wastewater SDC + $4,800 service installation ($6,175 on an arterial) + $330 meter. SDCs · Installation | 1/1/2026 |
| Sacramento, CA | City of Sacramento DOU | 3/4″ | $13,184–$16,450 | $10,513.13 water development + $2,670.74 sewer development ($5,936.84 in the combined sewer area). City-made taps add $4,507 + $723 meter + $1,781 sewer tap (published for a 1″ service). Source | FY2026-27 |
| Fresno, CA | City of Fresno DPU | 1″ | $10,390.83–$10,542.83 | $5,686.83 water capacity + $2,241 meter and service installation + $2,119 wastewater facilities charge + $344–$496 trunk sewer charge (by sewer area). Frontage, lateral and oversize charges may apply on lots that have not paid for the mains. Source | 7/1/2026 |
| Columbus, OH | Columbus Dept. of Public Utilities | 3/4″ | $5,695 | $1,406 water capacity (inside city) + $397 disc meter + $3,892 sewer capacity. A meter-box setting costs $514 plus a $271 yoke instead of the $397 meter. Front-footage charges ($22 water, $45 sewer per foot) may also apply; ask the city. Water · Sewer | 4/1/2026 |
“Confirm with utility” means the official document is older than FY2024 or conflicts with another official page. We show it so you know the fee exists, but confirm the amount with the utility before budgeting.
Why the same house costs 12 times more to connect in one city than another
The spread in the table is mostly about what each fee is buying, not about pipe prices.
- Capacity fees versus taps. A capacity, impact or system development fee buys a share of treatment plants and trunk lines already built. A tap or connection fee pays for the physical work at the main. Salt Lake City’s adopted connection fees are the lowest in the table, and the city has proposed raising them. Why tap fees are going up explains increases like this. Phoenix’s Northwest area adds $14,046 in water transmission and $5,127 in wastewater collection impact fees that are $0 in the Balance of City area. See tap fee vs impact fee for the full vocabulary.
- Who does the digging. Charlotte and Raleigh both sell capacity for a few thousand dollars, but when the city makes the taps, the total roughly triples. In San Antonio a private contractor normally installs the service under a SAWS permit, so that cost shows up in your plumber’s bid instead of the utility invoice.
- Formulas. Denver charges by lot square footage, Colorado Springs by lot-size tier, Houston and Austin per service unit, Nashville per 350-gallon-per-day unit, Portland per drainage fixture unit. A bigger lot or a bigger meter changes the answer.
- Split providers. Orlando homes can get water from OUC and sewer from the city; Tucson homes pay Tucson Water and Pima County; Las Vegas homes pay SNWA, LVVWD and a separate sewer agency. Check every provider on your address.
How meter size moves the total
Same utility, same house, larger meter. Official schedules, effective dates as in the table above.
| Utility | Charge | Smaller meter | 1″ meter | Difference |
|---|---|---|---|---|
| Charlotte Water (FY2027) | Water + sewer SDF + water connection | $10,926 (5/8″) | $23,364 | +$12,438 |
| Fort Worth Water (FY2027) | Water + wastewater impact | $5,828 (5/8″) | $14,570 | +$8,742 |
| Las Vegas (SNWA, 3/1/2026) | Regional connection charge | $7,998 (3/4″) | $15,780 | +$7,782 |
| Portland Water Bureau (FY2026-27) | Water SDC | $5,483 (5/8″) | $13,707 | +$8,224 |
| Seattle Public Utilities (2026) | Water + wastewater SDC | $9,500 (3/4″) | $16,150 | +$6,650 |
Charlotte’s 1-inch figure is $7,068 + $3,632 + $12,664; Seattle’s is $11,730 + $4,420. Fort Collins, for example, lists a separate 1-inch residential fire-sprinkler tap. Ask your designer whether the larger meter is truly required before the permit locks it in. Fire sprinkler meter upsizing costs compares real utilities. The water meter installation cost guide covers the hardware side.
Tap fees and connection charges by state
These live tables list every fee row we hold for each state, including meter sizes and fee types the national table leaves out. Blank amounts mean the source did not publish a verified number; they are not zeros.
Texas
Texas impact fees fall under Local Government Code Chapter 395 and are usually assessed at plat and collected at permit or connection. In Austin and McKinney the plat date picks the fee table; in Fort Worth the building permit date sets the rate. New Braunfels Utilities collects its maximum impact fees, about $26,218 for a 5/8-inch meter on a lot platted after January 2023; see New Braunfels tap fees. Conroe charges no impact fee; its 2025 tap fees are $1,875 each for a 3/4-inch water tap and a 4-inch sewer tap, $3,750 in total; see Conroe tap fees. Pflugerville’s wastewater impact fee depends on the service area: $16,529 in Service Area 1, $30,349 in Service Area 2; see Pflugerville tap fees. Cedar Park’s impact fee is a flat $6,330 per single-family home regardless of meter size, about $6,480 with the tap and inspection; see Cedar Park tap fees. State hub: Texas utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Austin | Austin Water | $5,111.52 | $2,900 |
| Cedar Park | City of Cedar Park Utility Billing | $3,260 | $3,170 |
| Celina | — | — | — |
| Conroe | City of Conroe (Water and Sewer) | $1,875 | $1,875 |
| Dallas | — | — | — |
| El Paso | El Paso Water | $5,888 | $1,262 |
| Fort Worth | Fort Worth Water | $2,824 | $2,680 |
| Frisco | — | — | — |
| Georgetown | Georgetown Utility Systems (City of Georgetown) | $12,698.50 | $10,550 |
| Houston | Houston Public Works (Houston Water) | $2,553.11 | $1,830.24 |
| Kyle | City of Kyle Water & Wastewater Utilities | $10,908 | $8,762 |
| Leander | City of Leander Utilities | $9,102 | $2,301 |
| McKinney | City of McKinney Water Utilities | $2,264 | $3,273 |
| New Braunfels | New Braunfels Utilities (NBU) | $19,849 | $6,244 |
| Pflugerville | — | — | — |
| Round Rock | City of Round Rock Utilities and Environmental Services | $5,232 | $2,921 |
| San Antonio | San Antonio Water System (SAWS) | $5,470 | $5,541 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
North Carolina
Charlotte and Raleigh both split charges into a capacity fee and a physical connection fee. Cary sizes its water and sewer development fees by the home’s area under roof, so a 2,401–3,100 sq ft home pays about $6,766 on a contractor-built service; see Cary tap fees. Durham charges capital facility fees by meter size, about $6,340 with a 5/8-inch meter; see Durham tap fees. Greensboro publishes its own all-in figure: $3,350 for a 5/8-inch meter including the meter; see Greensboro tap fees. Hub: North Carolina utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Cary | Town of Cary Utilities | $2,548 | $3,683 |
| Charlotte | Charlotte Water | $5,860 | $11,510 |
| Concord | City of Concord Water Resources (Concord Utilities) | $1,896 | $4,127 |
| Durham | City of Durham Department of Water Management | $3,312 | $3,028 |
| Greensboro | City of Greensboro Water Resources | $1,895 | $1,455 |
| Raleigh | Raleigh Water (City of Raleigh Public Utilities) | $1,737 | $7,378 |
| Wilmington | Cape Fear Public Utility Authority (CFPUA) | $2,585 | $3,465 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Tennessee
Nashville’s water capacity charge is due before the connection permit, and unpaid tap or capacity fees can become a lien. In Murfreesboro, Murfreesboro Water Resources charges a $1,200 water and $2,500 sewer connection fee per single-family unit, plus a meter fee; see Murfreesboro tap fees. Spring Hill charges about $7,851 for a 5/8-inch home but has been under a state-ordered sewer moratorium since August 2025; see Spring Hill tap fees. Knoxville Utilities Board charges no capacity fee; its minimum water and sewer tap fees total $2,700 (Knoxville tap fees). In Chattanooga, Tennessee American Water installs the service and meter at its own cost and the city charges nothing for a 4-inch sewer lateral, so a new home pays about $155 in fees (Chattanooga tap fees). Hub: Tennessee utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Chattanooga | City of Chattanooga (Wastewater Dept. / Land Development Office) | $0 | $0 |
| Knoxville | Knoxville Utilities Board (KUB) | $1,000 | $1,700 |
| Murfreesboro | Murfreesboro Water Resources Department (MWRD) | $2,140 | $2,500 |
| Nashville (Metro Nashville-Davidson County) | Metro Water Services (Metro Nashville) | $1,875 | $2,660 |
| Spring Hill | Spring Hill Water (City of Spring Hill) | $3,715.65 | $4,135 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Florida
Addresses inside Orlando, in unincorporated Orange County and in Tampa pay different providers. In unincorporated Sarasota County a standard home (1.00 EDU) pays $4,250 water and $4,480 wastewater capacity fees plus a $215.17 meter and a $40 review fee, about $8,985 in total; see Sarasota County tap fees. Hub: Florida utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Cape Coral | City of Cape Coral Utilities | $1,845 | $3,090 |
| Fort Myers | City of Fort Myers Utilities | $3,503.39 | $3,514.01 |
| Jacksonville | JEA | $3,165 | $5,114 |
| Lakeland | City of Lakeland Water Utilities | $4,235.15 | $3,820.85 |
| Ocala | City of Ocala Water Resources (Water & Sewer) | $1,127 | $2,951 |
| Orange County | Orange County Utilities (OCU) | $2,790 | $5,270 |
| Orlando | City of Orlando Public Works - Water Reclamation Division | $6,480 | $2,537.50 |
| Port St. Lucie | Port St. Lucie Utility Systems Department (PSLUSD) | $7,025 | $5,222 |
| Tampa | City of Tampa Wastewater Department | $5,178 | $1,237 |
| Unincorporated Hillsborough County | Hillsborough County Water Resources Department (formerly Public Utilities) | $4,282 | $5,873.75 |
| Unincorporated Sarasota County | Sarasota County Public Utilities | $4,465.17 | $4,480 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
South Carolina
Charleston Water System raises impact fees every January 1; the 2027 amounts are already published. Across the state line from Charlotte, the Town of Fort Mill charges $2,420 for water and $3,000 for sewer capacity on a 3/4-inch tap; see Fort Mill tap fees. In Greenville, Greenville Water’s capacity and connection fees plus ReWa’s sewer new account fee come to $10,543 from Oct 1, 2026; see Greenville tap fees. In the Myrtle Beach area, Grand Strand Water & Sewer Authority raised its impact fees about 80% in 2026; a new home on a subdivision lot pays about $4,710; see Myrtle Beach area (GSWSA) tap fees. Hub: South Carolina utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Charleston | Charleston Water System | $5,120 | $6,870 |
| Fort Mill | Town of Fort Mill Utilities Department | $2,420 | $3,000 |
| Greenville | Renewable Water Resources (ReWa) | $3,680 | $5,863 |
| Horry County (Myrtle Beach area) | Grand Strand Water & Sewer Authority (GSWSA) | $1,855 | $2,735 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Colorado
Several Colorado cities tie at least one fee to lot size, and Fort Collins adds a water-rights requirement. Boulder adds a stormwater fee per square foot of hard surface; see Boulder tap fees. Loveland switched to a per-square-foot impact fee in 2026; a 1,800 sq ft home on a 6,000 sq ft lot pays about $14,548; see Loveland tap fees. Hub: Colorado utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Aurora | Aurora Water | $14,455 | $12,481 |
| Boulder | City of Boulder Utilities | $14,548.37 | $5,596 |
| Castle Rock | Castle Rock Water | $38,387.34 | $5,065.51 |
| Colorado Springs | Colorado Springs Utilities | $525 | $1,868 |
| Denver | City and County of Denver DOTI - Wastewater (SUDP permitting; collects SAFE + Metro Water Recovery fees) | $450 | $6,480 |
| Erie | Town of Erie Public Works (Water, Wastewater and Storm Drainage) | $17,290 | $8,860 |
| Fort Collins | Fort Collins Utilities | — | $4,476 |
| Greeley | Greeley Water and Sewer | — | $9,050 |
| Loveland | Loveland Water and Power | $915 | $455 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Arizona
Phoenix impact fees depend on the planning area; Tucson’s sewer fee is paid to Pima County and rises every July 1. Hub: Arizona utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Buckeye | City of Buckeye Water Resources Department | $9,536 | $7,524 |
| Chandler | City of Chandler Public Works & Utilities (water, wastewater, reclaimed water) | $2,879 | $5,989 |
| Gilbert | Town of Gilbert Public Works (water and wastewater) and Utility Billing | $14,136 | $4,260 |
| Mesa | City of Mesa Water Resources | $8,179 | $1,809 |
| Phoenix | City of Phoenix Water Services Department | $1,753 | $95 |
| Queen Creek | Town of Queen Creek Utilities (Water and Wastewater) | $2,882 | $6,144 |
| Tucson | Pima County Regional Wastewater Reclamation Department | $1,980 | $4,443 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Nevada
The SNWA regional connection charge adjusts every March 1. Many “Las Vegas” addresses are unincorporated Clark County with a different sewer agency. In Reno, Truckee Meadows Water Authority prices water by gallons per minute of demand and water rights are extra; see Reno tap fees. In Las Vegas, the Southern Nevada Water Authority’s regional connection charge is the largest single line item, alongside separate city water and sewer charges; see Las Vegas tap fees. Hub: Nevada utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Las Vegas | City of Las Vegas (Building & Safety - Sewer Connection Charges) | $10,369 | $3,235 |
| Reno | City of Reno (Sewer) | — | $13,115 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Utah
Salt Lake City had a pending increase to water, sewer and stormwater impact fees when we checked; the table shows the adopted schedule. In Lehi, a new home on a quarter-acre lot pays about $10,661 in water, pressurized irrigation, sewer and storm drain fees before power; see Lehi tap and impact fees. Next door, Saratoga Springs adds a pressurized irrigation impact fee of $41,694 per irrigable acre, charged when the plat is recorded. In St. George the Washington County Water Conservancy District’s $17,266 impact fee is the largest single charge; with the city’s 2021 water, sewer and drainage fees a new home pays about $21,782 before power; see St. George tap and impact fees. In Provo, water and sewer impact fees on a standard lot plus a Provo Power connection add up to about $15,577; see Provo tap and impact fees. Hub: Utah utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Lehi | Lehi City Water, Sewer & Pressurized Irrigation | $1,670.80 | $6,665.44 |
| Provo | Provo City Public Works (Water Resources & Wastewater) | $8,137.10 | $4,450.26 |
| Salt Lake City | Salt Lake City Department of Public Utilities | $1,871 | $545 |
| Saratoga Springs | Timpanogos Special Service District (regional sewer treatment) | $2,883 | $7,282.55 |
| St. George | Washington County Water Conservancy District | $17,266 | — |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Idaho
Boise’s sewer connection fee is a treatment fee set by home size plus a trunk fee set by lot density, while water comes from Veolia Water Idaho, which charges no hookup fee when its main already fronts the lot. Next door, Meridian charges flat water and sewer assessments per equivalent residential unit plus a meter fee. City pages: Boise sewer and water connection fees , Meridian water and sewer assessments and Nampa impact and hookup fees. Hub: Idaho utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Boise | City of Boise Public Works - Water Renewal | $0 | $4,549.20 |
| Meridian | City of Meridian Public Works (Water & Sewer) | $2,130.44 | $5,807 |
| Nampa | City of Nampa Public Works (Water, Wastewater & Pressure Irrigation) | $1,458 | $5,598 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Indiana
Fort Wayne City Utilities prices its sewer Area Connection Fee by service area rather than meter size: $1,000 to $2,700 per ERU depending on which of five zones the lot sits in, on top of $960.17 in water-side charges for a 5/8-inch meter and an $85 sewer tap inspection, so a new home runs $2,045.17 to $3,745.17; see Fort Wayne tap fees. In Indianapolis, Citizens Water and its CWA Authority charge $4,585 for a new home with the minimum 3/4-inch water service — a $1,800 System Development Charge and $19 meter fee, plus a flat $2,530 sewer connection fee and $236 lateral permit that don’t change with meter size or location; a 1-inch service raises the total to $5,834; see Indianapolis tap fees. Hub: Indiana utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Fort Wayne | City Utilities (Fort Wayne) | $650 | $1,000 |
| Indianapolis | CWA Authority, Inc. (Citizens Wastewater) | $19 | $2,530 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Oregon
Portland’s sewer SDC is priced per drainage fixture unit, and some new housing permits through 9/30/2028 may be exempt. Bend prices its water and sewer SDCs by house size: a 1,601–2,200 sq ft home pays about $13,757 with the meter, before the transportation SDC; see Bend SDCs and tap fees. Hub: Oregon utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Bend | City of Bend Utilities (Water Services) | $7,600 | $6,157 |
| Portland | Portland Environmental Services (BES) | $5,483 | $623 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Washington
Seattle added wastewater and drainage SDCs on January 1, 2026; before that only water carried an SDC. In Spokane, general facilities charges for a 5/8-inch meter total $8,362 for water and wastewater in 2026, before the city’s tap and meter charge; see Spokane tap fees. In Tacoma, the published 2026 water and wastewater system development charges plus the water tap charge total $9,243 for a 5/8-inch meter, though the wastewater SDC is only published at that size and the sewer connection itself is billed separately as a share of the building permit valuation; see Tacoma tap fees. Hub: Washington utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Seattle | Seattle Public Utilities | $11,700 | $2,600 |
| Spokane | City of Spokane Public Works (Water and Wastewater) | $3,475 | $4,887 |
| Tacoma | City of Tacoma Environmental Services (Wastewater) | $5,904 | $3,339 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
California
Sacramento homes pay only one of the two city sewer development fees, depending on the sewer area. Homes on regional sewer pay a separate agency we have not yet collected. In San Diego, a new home pays the city’s water and sewer capacity charges plus the San Diego County Water Authority’s capacity charges, about $15,274 in total; see San Diego tap fees. Fresno’s Department of Public Utilities charges about $10,466 for a typical new home with the 1-inch minimum residential service; see Fresno tap fees. Hub: California utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Fresno | City of Fresno Department of Public Utilities | — | $2,538 |
| Sacramento | City of Sacramento Department of Utilities | $10,513.13 | $7,717.84 |
| San Diego | City of San Diego Public Utilities Department | $9,730 | $5,154 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Ohio
Columbus charges more for water capacity in contract suburbs than inside the city, and lists per-foot front-footage charges for water and sewer. In Cincinnati, Greater Cincinnati Water Works and the Metropolitan Sewer District bill separately, and a standard 3/4-inch home on an already-paved street pays $10,231 in all — $4,451 more than Columbus’s $5,780, mostly because MSD’s $5,900 sewer tap-in fee runs well above Columbus’s sewer charges; see Cincinnati tap fees. Hub: Ohio utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Cincinnati | Metropolitan Sewer District of Greater Cincinnati | $4,331 | $5,900 |
| Columbus | City of Columbus Department of Public Utilities (Columbus Water & Power) | $1,741 | $3,892 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Georgia
Atlanta has had no water or sewer connection impact fee since 1995; a new home pays meter installation, a sewer capacity certification and permit fees, about $2,295 when the city installs a 3/4-inch meter. City page: Atlanta water and sewer tap fees. In Savannah the 2026 Revenue Ordinance sets a $525 meter, $600 water and $400 sewer tap-ins and a $600 reclaimed water fee, about $2,155 with the account fee; see Savannah tap fees. Marietta is the outlier: its water meter/tap fee and flat $6,000 combined sewer charge (a $3,500 Sewer Development Fee plus a $2,500 6-inch tap installation) bring a standard connection to about $7,525; see Marietta tap fees. Hub: Georgia utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Atlanta | City of Atlanta Department of Watershed Management | — | $600 |
| Marietta | City of Marietta Power & Water | $1,500 | $6,000 |
| Savannah | City of Savannah Water Resources | $1,125 | $400 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Missouri
Kansas City charges for the physical tap, meter and sewer connection but, in the documents we read, no water or sewer impact fee, so its official total for a new home is under $1,000. City page: Kansas City water and sewer tap fees. In St. Louis, MSD’s sewer connection fee and permit plus the Water Division’s turn-on charge run $1,251 to $1,551, but that figure is incomplete: the Water Division’s own rules say the water tap installation price is fixed but unpublished, available only in person at the Tap Application Counter; see St. Louis water and MSD sewer tap fees. Hub: Missouri utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Kansas City | KC Water | $303 | — |
| St. Louis | Metropolitan St. Louis Sewer District (MSD) | — | $1,426 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Oklahoma
Oklahoma City charges a $1,000 water system development charge for a standard meter and a sewer impact charge of $100 plus $50 per bath unit, so a typical new home pays about $1,283 in official fees. City page: Oklahoma City tap fees. In Tulsa, a new home pays about $704 in city permit, meter and account fees, and a licensed contractor builds the tap; see Tulsa tap fees. Hub: Oklahoma utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Oklahoma City | Oklahoma City Utilities (Oklahoma City Water Utilities Trust) | $1,048.28 | $150 |
| Tulsa | City of Tulsa Water and Sewer (Tulsa Metropolitan Utility Authority) | $254.92 | — |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
New Mexico
The Albuquerque Bernalillo County Water Utility Authority charges utility expansion charges by meter size, phasing up each July; a standard new home pays about $9,356 including the meter set and permits. City page: Albuquerque tap fees. In Las Cruces, Las Cruces Utilities splits its water and wastewater Development Impact Fees in half between builder and homeowner, so only about $5,504 of the $8,241 standard-meter total is due at the building permit, with the rest billed later and financeable over 60 months; see Las Cruces tap fees. Hub: New Mexico utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Albuquerque | Albuquerque Bernalillo County Water Utility Authority | $5,687 | $3,569 |
| Las Cruces | Las Cruces Utilities | $3,955 | $4,286 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Minnesota
In Minneapolis the largest published charge is the Metropolitan Council’s Sewer Availability Charge, $2,485 per home in 2026, plus city water and sewer connection permits; the city’s water tap and meter charges are not published. City page: Minneapolis tap fees and SAC. In St. Paul, the same $2,485 SAC applies on top of SPRWS’s $1,050 water service connection and an $85 city sewer permit, for a published total of $3,620; see St. Paul tap fees and SAC. Hub: Minnesota utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Minneapolis | Metropolitan Council Environmental Services | — | $2,485 |
| Saint Paul | Metropolitan Council Environmental Services | $1,050 | $2,485 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Kentucky
Louisville Water charges a $350 system development charge and a $1,475 service installation fee for a 3/4-inch service, so a new home in a developer-built subdivision pays about $1,825; MSD sewer charges depend on how the lateral is built. City page: Louisville tap fees. In Lexington, Kentucky American Water charges a $1,223 tap for a 5/8-inch meter and the city sewer tap-on fee starts at $1,699.50 for a lot of a quarter acre or less, about $2,923 in total; see Lexington tap fees. In Bowling Green, BGMU charges a $400 water main line tap fee, a $1,600 fee for a 5/8-inch meter and a $2,000 sewer attachment deposit (not a fixed price), about $4,000 in total; see Bowling Green tap fees. Hub: Kentucky utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Bowling Green | Bowling Green Municipal Utilities (BGMU) | $2,000 | — |
| Lexington | Lexington-Fayette Urban County Government, Division of Water Quality | $1,223 | $1,699.50 |
| Louisville | Louisville Water Company | $350 | — |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Nebraska
In Omaha, the Metropolitan Utilities District’s water impact fee is $2,112 for a 3/4-inch meter, and a typical new home pays about $3,155 with the meter, tap and city permits. City page: Omaha tap fees. In Lincoln, Lincoln Water System’s tap fees plus three citywide impact fees bring a 3/4-inch meter to $3,388; see Lincoln tap fees. Hub: Nebraska utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Lincoln | Lincoln Transportation and Utilities – Wastewater Division | $2,403 | $985 |
| Omaha | Metropolitan Utilities District (M.U.D.) | $3,102 | — |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Virginia
Richmond’s Department of Public Utilities raised its connection charges on July 1, 2026; a new home with a 5/8-inch meter now pays $9,370 for water and wastewater installation and capacity. City page: Richmond tap fees. In Virginia Beach, the Capital Recovery Fee for the same meter size runs $3,531 to $6,077 depending on the sewer scenario, with a $5,421 base case; sewer customers there also owe a separate, unquantified charge from HRSD, the regional wastewater treatment agency. See Virginia Beach tap fees. Hub: Virginia utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Richmond | City of Richmond Department of Public Utilities | $6,310 | $1,560 |
| Virginia Beach | City of Virginia Beach Department of Public Utilities | $2,900 | $2,521 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Alabama
Huntsville Utilities charges a $1,635 water tap and a $1,646 water system development charge for a standard meter, and the city adds a $1,000 sewer access fee; see Huntsville tap fees. In Birmingham, Central Alabama Water charges $1,768 for a new tap and Jefferson County adds a sewer impact fee of $401.17 per plumbing fixture unit, and an $89.18 sewer connection permit, about $5,869 for a 10-fixture example home; see Birmingham tap fees. In Mobile, MAWSS is a single combined water-and-sewer utility that charges $1,705 in water capacity, tap and connection fees plus a flat $3,920 in sewer capacity and tap fees for a 5/8-inch meter, $5,625 in total; see Mobile tap fees. Hub: Alabama utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Birmingham | Jefferson County Environmental Services Department | $1,768 | $401.17 |
| Huntsville | City of Huntsville Water Pollution Control | $3,281 | $1,000 |
| Mobile | Mobile Area Water and Sewer System (MAWSS) | $1,705 | $3,920 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Kansas
Wichita prices new service from a 1-inch connection: $1,812 for the tap, service line and meter setting, a $1,520 water plant equity fee, a $1,350 sewer equity fee, a $60 sewer permit and a $53 account fee, about $4,795 in total. Lots whose mains were never assessed can owe front-foot and area charges on top. City page: Wichita tap fees. In Overland Park, WaterOne and Johnson County Wastewater charge separately and scale steeply with meter size: $11,955 on the smallest 5/8-inch meter up to $17,295 on a 3/4-inch meter, more than double Wichita’s flat total. City page: Overland Park tap fees. Hub: Kansas utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Overland Park | Johnson County Wastewater (JCW) | — | $4,850 |
| Wichita | — | — | — |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Louisiana
In Baton Rouge, the privately owned Baton Rouge Water Company charges a $300 residential initial service charge and the City-Parish sewer impact fee is $2,150 for a 5/8-inch meter, about $2,450 in total; the sewer schedule is dated 2003, so confirm it. City page: Baton Rouge tap fees. New Orleans has no flat tap fee at all: SWBNO charges an administrative fee equal to 20% of a licensed contractor’s own construction estimate, plus a $100–$125 refundable meter deposit, so an illustrative total runs from about $3,940 to $19,300 depending on the job; see New Orleans tap fees. Hub: Louisiana utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Baton Rouge | City of Baton Rouge / Parish of East Baton Rouge | $300 | $2,150 |
| New Orleans | — | — | — |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Arkansas
Bentonville adopted a $7,867 wastewater development fee per home in January 2026; a house on a lot created after January 22, 2026 pays about $8,992 with the water service and account fee, while one ERU of credit covers a single house on an older platted lot. City page: Bentonville tap fees. In Little Rock the published charges are small, about $435, but Central Arkansas Water’s service line and meter connection charge is quoted per job and not published; see Little Rock tap fees. In Fayetteville a 5/8-inch meter costs $7,335 inside city limits ($810 water tap + $855 sewer tap + $2,672 water impact fee + $2,998 wastewater impact fee) or $7,676 outside, current under Ordinance No. 6994 effective July 1, 2026; see Fayetteville tap fees. Hub: Arkansas utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Bentonville | Bentonville Water Utilities (City of Bentonville) | $1,100 | $7,867 |
| Fayetteville | City of Fayetteville Water and Sewer Division (Water and Wastewater Department) | $3,482 | $3,853 |
| Little Rock | Little Rock Water Reclamation Authority (LRWRA) | $150 | $105 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Iowa
Des Moines Water Works charges a $1,500 system development fee and a $460 tap for the minimum 1-inch service inside the city, and installs the meter at no charge; with the city’s $77.25 service permit a new home pays about $2,037. City page: Des Moines tap fees. Cedar Rapids charges a flat $1,000 water connection fee and $2,000 sewer connection charge on lots where the mains were already built, plus a $350.33 tap fee, $100 in right-of-way permits and a $30 house-sewer plumbing inspection fee — about $3,480 total — but both connection fees are waived on a new subdivision lot where the developer already extended the mains, dropping the total to about $480; see Cedar Rapids tap fees. Hub: Iowa utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Cedar Rapids | City of Cedar Rapids Public Works (Engineering Division / Water Pollution Control) | $1,350.33 | $2,000 |
| Des Moines | — | — | — |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Wisconsin
Madison has no water impact or capacity fee: a new home pays about $414 in water service, meter, sewer use and permit charges, but the owner also pays the actual cost of the lateral, and some districts add sewer impact fees. City page: Madison tap fees. Milwaukee has no impact fee either — a new home pays about $615.22 (water tap, meter extension and DNS sewer inspection and permit charges), and Milwaukee’s MMSD, unlike Madison’s same-named agency, bills member municipalities wholesale rather than charging homeowners directly; see Milwaukee tap fees. Hub: Wisconsin utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Madison | City of Madison Engineering (Sewer Utility) | $84 | $120 |
| Milwaukee | Milwaukee Water Works | $495.22 | — |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Pennsylvania
Pittsburgh Water (PWSA) charges a flat $570 for a typical new single-family home: a $40 tap-in permit, a $340 connection fee for the standard 1-inch water tap and a $190 meter; see Pittsburgh tap fees. Philadelphia Water (PWD) charges about $1,345 for a standard 3/4-inch ferrule tap with a 5/8-inch meter, a 5- or 6-inch sewer lateral connection, and the city’s Utility Plan Review fee; see Philadelphia tap fees. Hub: Pennsylvania utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Philadelphia | Philadelphia Water Department (PWD) | $360 | $375 |
| Pittsburgh | — | — | — |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Michigan
Grand Rapids charges about $1,275 for a new single-family home with a standard 3/4-inch meter: a $400 Plan Review and Connection fee, a $225 Meter Capacity Charge and a $375 tapping permit, plus a meter; see Grand Rapids tap fees. Detroit’s DWSD charges no tap or meter fee at all — the homeowner’s own licensed plumber does the physical tap under DWSD inspection — so the only charges are $1,450 in plan-review and inspection fees; see Detroit tap fees. Hub: Michigan utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Detroit | — | — | — |
| Grand Rapids | City of Grand Rapids Water System / Environmental Services | $450 | — |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
New Jersey
Jersey City’s JCMUA prices new connections per Equivalent Dwelling Unit rather than by meter size, currently $4,100/EDU ($2,255 water + $1,845 sewer, since June 1, 2026); see Jersey City tap fees. Newark’s own Department of Water and Sewer Utilities charges about $6,850.39 for one EDU on a 5/8-inch meter (application, inspection and connection fees), plus an unpublished per-gallon fee from the regional Passaic Valley Sewerage Commissioners that isn’t included in that total; see Newark tap fees. Hub: New Jersey utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Jersey City | Jersey City Municipal Utilities Authority (JCMUA) | $2,255 | $1,845 |
| Newark | City of Newark Department of Water and Sewer Utilities | $3,316.24 | $1,784.15 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Connecticut
Hartford’s regional MDC prices new connections by front-foot assessment rather than a flat fee, so a 40-foot lot example runs to $9,170; see Hartford tap fees. New Haven splits water and sewer between two separate authorities: the Regional Water Authority charges about $1,210 and the Greater New Haven Water Pollution Control Authority charges $3,850 for a 5/8-inch meter, $5,060 combined; see New Haven tap fees. Hub: Connecticut utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Hartford | The Metropolitan District (MDC) | $360 | — |
| New Haven | Greater New Haven Water Pollution Control Authority (GNHWPCA) | $895 | $3,850 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Rhode Island
Providence Water and the Narragansett Bay Commission together charge about $4,175.88 for a new single-family home with the smallest standard 5/8-inch meter: $2,955.88 to Providence Water (tap plus meter) and $1,220 to NBC for the sewer connection; see Providence tap fees.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Providence | Narragansett Bay Commission (NBC) | $196.88 | $350 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Method and downloads
We read each utility’s current fee schedule, ordinance or tariff and record the fee name, amount, basis, meter size, effective date and source link exactly as published. Rows older than FY2024, or contradicted by another official page, are marked “Confirm with utility”. The national table adds only charges a typical new single-family home would pay and states every assumption in the “How we got the number” column. National planning figures used elsewhere on the site are labeled estimates and explained on the methodology page; see also our source and data policy and the full fee database.
Download the fee rows as CSV or JSON. Each row carries its source URL, effective date, verification date and status.
Related tools and guides
Price the rest of the job with the utility connection cost calculator. Guides: water tap fee · sewer tap fee · tap fee vs impact fee · water meter installation cost · new construction utility costs · cost to bring utilities to land.
Frequently asked questions
What is the average water and sewer tap fee for a new house?
There is no official national average. Among the cities in our table with complete verified figures, core water and sewer charges run from $2,416 (Salt Lake City) to $29,322 (Phoenix Northwest), with most between about $5,000 and $15,000. For a place we don’t cover, our national estimate for combined water and sewer impact fees is $3,500–$25,000, with $7,500 as a planning figure.
Is a tap fee the same as an impact fee?
Usually not. A tap or connection fee pays for the physical connection to the main; an impact, capacity or system development fee buys a share of plant and pipe capacity. Denver Water calls its system development charge a “tap fee” and charges a separate $185 for the physical tap, so read the fee definitions rather than the label.
Who pays the tap fee, the buyer or the builder?
The utility bills whoever applies for the permit or meter, often the builder or an owner-builder. On a custom build, the contract should say whether fees are in the base price or billed as an allowance.
Why does meter size change the fee so much?
Many utilities multiply the base fee by a meter-size factor. Austin and Fort Worth count a 1-inch meter as 2.5 service units, so Fort Worth’s FY2027 impact fees go from $5,828 for a 5/8-inch meter to $14,570 for a 1-inch meter.
Do I pay the tap fee again if I tear down and rebuild?
Often not in full. Seattle and Sacramento give credit for existing service, and Nashville does not charge a new tap fee when you reuse an existing tap of the same or smaller size. Ask for the credit in writing before the old meter is removed.
Why did tap fees go up in my city?
Many schedules now rise on a set date: Charleston every January 1, the SNWA charge every March 1, Pima County every July 1, and Denver Water in two 2026 steps (its first system development charge change since 2013). Check the effective date column above against your permit date.
Does the plat date matter?
In some Texas cities, yes. Austin’s Capital Recovery Fee for a plat recorded on or after 10/1/2023 is $7,700 per service unit, versus $7,200 for plats from 10/1/2018 to 9/30/2023. San Antonio’s current impact fees apply to plats recorded on or after 7/1/2024.