Newark Water & Sewer Connection Fees, NJ (2026)

Last reviewed: By Utility Cost Guide editor

Newark’s own Department of Water and Sewer Utilities supplies both water and sewer service inside the city — it is a city department, not a private company and not a separate regional authority like nearby Jersey City’s JCMUA. For a new single-family home taking one water connection and one sewer connection (one Equivalent Dwelling Unit, or EDU, on a standard 5/8-inch meter), the department’s published routine fees total $6,850.39: a $500 water application fee, a $500 sewer application fee, a $750 combined water/sewer inspection fee, a $3,016.24 water connection fee, a $1,784.15 sewer connection fee, and a $300 meter purchase. The most important caveat: Newark’s wastewater is treated by the regional Passaic Valley Sewerage Commissioners (PVSC), which can levy its own separate one-time sewer connection charge — a $250 administrative fee plus an unpublished per-gallon “gallonage fee” — and neither agency’s website says plainly whether a single infill single-family connection triggers it, so confirm with PVSC before treating the city total above as final.

Official Newark fees in one table

The table below lists every Newark Department of Water and Sewer Utilities charge we verified from the city’s April 2024 connection-fee ordinances and its “Permits and Prices” page. The application and inspection fees are flat, charged once per project. The water and sewer connection fees are priced per Equivalent Dwelling Unit (EDU) — Newark defines 1 EDU as the estimated daily flow of an average single-family home, so a typical new house is 1 EDU regardless of how big it is — while the water meter itself is priced separately, by the physical meter size you install. PVSC’s separate regional sewer-connection charge is flagged “Confirm with utility” because its per-gallon rate is not published anywhere on its site.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
General — Inspection
GeneralInspectionWater and/or Sewer Inspection Fee—$750per inspection—Official source2026-09-26
Sewer — Connection
SewerConnectionSewer Connection Fee (New Connector, 1 EDU)—$1,784.15per Equivalent Dwelling Unit (EDU)2024-06-01Official source2026-09-26
Sewer — Impact
SewerImpactPVSC Sewer Connection Fee (Administrative + Gallonage)—$250$250 admin fee + gallonage fee per projected gallons/day2026-01-01Official source2026-09-30
Sewer — Permit
SewerPermitSewer Application & Admin Fee—$500per application—Official source2026-09-26
Water — Connection
WaterConnectionWater Connection Fee (New Connector, 1 EDU)—$3,016.24per Equivalent Dwelling Unit (EDU)2024-06-01Official source2026-09-26
Water — Meter
WaterMeterWater Meter Purchase (1" meter)1"$365per meter—Official source2026-09-26
WaterMeterWater Meter Purchase (5/8" meter)5/8"$300per meter—Official source2026-09-26
Water — Other
WaterOtherChange of Contractor Fee—$500per change—Official source2026-09-26
Water — Permit
WaterPermitWater Application & Admin Fee—$500per application—Official source2026-09-26

Worked example for a single-family home in Newark

Assumptions: a single-family home connecting to Newark’s water and sewer mains for the first time, drawing one water service and one sewer service (1 EDU), on the smallest standard meter Newark sells (5/8 inch).

Newark water and sewer connection charges, single-family home, 1 EDU, 5/8″ meter

Charge Amount
Water Application & Admin Fee $500.00
Sewer Application & Admin Fee $500.00
Water and/or Sewer Inspection $750.00
Water Connection Fee (1 EDU) $3,016.24
Sewer Connection Fee (1 EDU) $1,784.15
Water Meter, 5/8″ $300.00
Total $6,850.39

Unlike many cities, Newark’s connection fee itself does not change with meter size — it is set entirely by EDU count. Meter size only changes what you pay for the meter hardware. A homeowner who needs a 1-inch meter instead of 5/8-inch pays $365 instead of $300 for the meter, bringing the same project to $6,915.39 — just $65 more, not a different fee tier. Newark’s ordinances (6PSF-b for water, 6PSF-c for sewer, both adopted April 24, 2024) define 1 EDU as “the estimated average daily flow of water [or sewer] for the connector divided by the average daily flow of water for the average single family residence within the City,” which is why a standard house is priced at exactly 1 EDU; larger multi-family or commercial connections are billed at higher EDU counts on the same published schedule.

If your project also needs a separate PVSC Connections Unit approval — PVSC’s FAQ says this applies to “every new, changed, or increased discharge” into its regional sewer system — add a $250 administrative fee plus a per-gallon “gallonage fee” on your home’s projected flow. PVSC’s own site does not publish the dollar-per-gallon rate (only that it rose $0.09/gallon over the 2025 rate on January 1, 2026), so PVSC issues a project-specific invoice after you apply. Call the Connections Unit at (973) 817-5706 to find out whether your single-family connection needs this step and what it will cost before you budget.

What Newark’s fees don’t cover

Newark’s connection fees cover the city’s review of your application, its inspection of the tap, the right to connect to the water and sewer mains, and the water meter itself. They do not cover the physical service line from the main to your house, excavation or street-opening work if the main is in the roadway, the City of Newark’s separate building/plumbing permit fees, or PVSC’s gallonage fee described above. National estimates (methodology):

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

How and when Newark fees are paid

Per Newark City Code §33:4-6(d) and §32:2-9(e), the water and sewer connection fees are due “before a building permit is issued for new construction … or a permit is requested for a new or enlarged connection” — in other words, up front, as a condition of getting your permit, not at meter set or at the end of the project. The homeowner or contractor must separately buy the water meter from the Department of Water and Sewer Utilities; the city asks that you call the Permit and Inspections Office at 973-733-3896 first to confirm the meter size you need is in stock. If a project changes licensed contractors partway through, Newark charges a $500 Change of Contractor fee. The Permit and Inspections Office is the starting point for all water and sewer permitting and can provide mapping of the existing infrastructure at your address.

Newark fee changes to watch

Common questions about Newark fees

How much does it cost to connect water and sewer to a new home in Newark, NJ?

The City of Newark’s own routine fees for a new single-family home (1 EDU, 5/8-inch meter) total $6,850.39: a $500 water application fee, a $500 sewer application fee, a $750 inspection fee, a $3,016.24 water connection fee, a $1,784.15 sewer connection fee, and a $300 meter purchase. This does not include the private service line, street opening, or a possible separate PVSC sewer-treatment fee.

Who provides water and sewer service in Newark, NJ?

The City of Newark’s own Department of Water and Sewer Utilities — a city department, not a private company. Newark’s wastewater is then treated by the regional Passaic Valley Sewerage Commissioners (PVSC), which can charge its own separate connection fee for some projects.

Does Newark charge its water and sewer connection fee by meter size or by EDU?

By Equivalent Dwelling Unit (EDU), not meter size. A standard single-family home is 1 EDU, priced at $3,016.24 for water and $1,784.15 for sewer under ordinances 6PSF-b and 6PSF-c (adopted April 24, 2024). The meter itself is priced separately, by size — $300 for the smallest, 5/8-inch meter.

Do I have to buy my own water meter in Newark?

Yes. Newark’s Department of Water and Sewer Utilities sells the meter directly — $300 for a 5/8-inch meter, $365 for 1 inch, up to $14,500 for a 10-inch meter — and asks that you call 973-733-3896 to confirm the size you need is in stock before buying.

Is there a separate PVSC sewer connection fee in Newark?

Possibly. PVSC, the regional agency that treats Newark’s wastewater, charges a $250 administrative fee plus a per-gallon “gallonage fee” for new or increased discharges into its system, but it does not publish the per-gallon dollar rate and its FAQ doesn’t specify whether a single new single-family home always triggers this review. Call PVSC’s Connections Unit at (973) 817-5706 to check before budgeting.

When do I actually pay Newark’s water and sewer connection fees?

Before your building permit is issued, or before a permit for a new or enlarged main connection is granted — the fees are a condition of getting the permit, per Newark City Code §33:4-6(d) and §32:2-9(e), not something paid later at meter installation.

What is Newark’s Change of Contractor fee?

A $500 charge if a water or sewer project switches licensed contractors partway through. It does not apply to a typical project that keeps the same contractor from application to completion.

Related guides for Newark

For another New Jersey city with a public utility authority pricing connections per EDU, see Jersey City water and sewer tap fees. For another older Northeastern city with an authority-based, per-unit connection charge, see Pittsburgh water and sewer tap fees.

tap fees by city · water tap fee · sewer tap fee · utility extension cost · water meter installation cost · utility connection cost calculator

Newark fee sources