Methodology

Last reviewed: By Utility Cost Guide research team

Utility Cost Guide separates published utility charges from user inputs and national planning estimates. Each calculator line item carries a label so you can see where its value came from and which amounts still need confirmation.

Data types and calculator labels

Label Meaning
Official fee A charge from a utility or government primary document that our team has verified. The line links to its source and shows its effective and verification dates. It applies only to the stated provider, customer class, meter size, and basis.
Your input An amount you entered, such as a quote or known fee. We use it in place of a planning value for that item; we do not verify your entry.
National estimate A planning benchmark drawn from cited source material. It is not an official local fee. See benchmarks.
Calculated An amount produced by calculator math, such as distance multiplied by a per-foot estimate. The formula and the underlying estimate are shown.

Collecting official fees

For official fee rows, we use primary documents published by the utility or responsible government body: fee schedules, ordinances, tariffs, rate sheets, and board resolutions. We record the amount or range, charging basis, meter size, customer class, effective date or fiscal year, source URL, and date verified. We retain the fee name as published and identify the provider and jurisdiction. A public summary is not substituted for the underlying document when that document is available.

Verification status

Status Meaning
Verified The row was checked against its cited official source and its recorded details matched.
Needs review A report, source change, missing detail, or import difference needs a fresh check; it is not presented as a confirmed current fee.
Stale The last verification is more than 12 months old. It may still be displayed with a warning, but its current applicability needs confirmation.
Superseded A newer published fee replaced this record. It is retained for provenance, not treated as a current charge.

We check source links weekly. A working link alone does not prove a fee remains current. Records move to stale after 12 months without verification and enter the review queue.

Per-unit and formula charges

Some utilities charge by equivalent dwelling unit (EDU), equivalent residential unit (ERU), service unit (SU), fixture unit, area, or a utility-specific formula. We display the published basis and formula instead of converting it to a flat fee unless the utility publishes the multiplier needed for that conversion. Charges listed as variable or actual cost likewise need a utility quote. You can enter a quoted amount as Your input.

Calculator math

The calculator builds a total from separate fee and construction line items. For distance-based work, it multiplies the entered feet by the relevant per-foot low, typical, and high values. Soil selections adjust trenching with the documented multiplier. Where water, sewer, electric, or gas work can share a trench, the model treats shared excavation as one line item instead of charging a full trench for each service. Road crossings, permits, and other applicable items appear separately.

Estimated line items and totals are rounded to the nearest $50 for planning; official fees are displayed at their published amounts. Low and high describe the source-backed range of scenarios, not guaranteed bounds. Typical is a central planning value, usually a median of published schedules where those exist. Project conditions and utility rules can put an actual quote outside the range.

National benchmarks

The table below lists the estimate components, units, source links, and method notes. Where comparable published schedules exist, typical is generally their median and low and high are the observed minimum and maximum. For some work, a published lump sum was divided by an assumed length to derive a per-foot figure; the assumption is stated in the row’s method note. Older figures were adjusted with a construction-cost index only where documented; the report applies no adjustment beyond 2023. Consumer-site data is generally a secondary cross-check, though the well-drilling per-foot row relies on it because a usable government schedule was not retrieved. Soil multipliers and pad-mount transformer costs also have limited published evidence. Review the row’s source and method note before using it.

ComponentLowTypicalHighUnitSources
Seal/abandon private well when connecting to public water$300.00$1,000.00$1,500.00flatWell Sealing Financial Assistance / Sealing of Wells and Borings, Abandoned Wells: Locating, Plugging and Reporting (PUB2900), Well Abandonment: Frequently Asked Questions
Complete private well system (drill, casing, pump, pressure tank)$5,000.00$10,000.00$25,000.00flatEIS Attachment: Well Drilling Costs (government-posted reprint of a national consumer cost table, 2020), How Much Does Well Drilling Cost? (2026), Lead Service Line Replacement Costs and Strategies for Reducing Them (Safe Water Engineering for NRDC, Feb 2024; RSMeans 2024 national-average scenarios)
Utility line extension to vacant land (per foot)$6.50$15.00$30.00per_ftLine Extension Cost, Electric Line Extensions, Relocations and Upgrades tariff (effective June 15, 2025), NorthWestern Energy South Dakota tariff, Section 6 service agreement provisions (docket GE24-001, Mar 2024), How Much Does It Cost to Run a New Electrical Service Line? (2026)
Overhead service drop (utility charge)$0.00$900.00$3,500.00flatNorthWestern Energy South Dakota tariff, Section 6 service agreement provisions (docket GE24-001, Mar 2024), Electric Line Extensions, Relocations and Upgrades tariff (effective June 15, 2025), Schedule of Charges for Electric Services (last approved Mar 1, 2022; updated Sep 5, 2023)
200 A service: panel + meter base (new or upgrade)$1,800.00$3,000.00$6,000.00flatAddressing an Electrification Roadblock: Residential Electric Panel Capacity (Aug 2021), Home Energy Rebates Program (HEAR: up to $4,000 for an electric load service center), Cost To Replace Electrical Panel / Upgrade Breaker Box Amps (2026)
Underground electric service lateral (per foot)$6.00$15.00$30.00per_ftService Guide Colorado - Natural Gas and Electric Installation (rev. April 2022), Standard Construction Charges, Schedule of Charges for Electric Services (last approved Mar 1, 2022; updated Sep 5, 2023), Electric Line Extensions, Relocations and Upgrades tariff (effective June 15, 2025), How Much Does It Cost to Run a New Electrical Service Line? (2026)
Gas service connection / meter set charge (short service)$0.00$616.00$900.00flatIll.C.C. No. 16 Terms and Conditions - Extension of Distribution System (service pipe charges per foot, effective Dec 2, 2025), NorthWestern Energy South Dakota tariff, Section 6 service agreement provisions (docket GE24-001, Mar 2024), Service Guide Colorado - Natural Gas and Electric Installation (rev. April 2022), Standard Construction Charges, Tap Fees, effective July 1, 2025 (Board approved 6-24-25)
Gas service line beyond free footage (per foot)$1.40$8.40$15.50per_ftTap Fees, effective July 1, 2025 (Board approved 6-24-25), Service Guide Colorado - Natural Gas and Electric Installation (rev. April 2022), Standard Construction Charges, Ill.C.C. No. 16 Terms and Conditions - Extension of Distribution System (service pipe charges per foot, effective Dec 2, 2025)
Water + sewer impact / capacity / system development fees combined (single-family)$3,500.00$7,500.00$25,000.00flatNational Impact Fee Survey: 2019, Raleigh Water FY25 Fee Schedule (water/sewer only), Rates, Fees & Charges (capital recovery fees), Charlotte Water FY26 Rates and Fees (effective 7/1/2025-6/30/2026), Tap & Impact Fees, System Development Charges (SDCs) for 2026, Lead Service Line Replacement Costs and Strategies for Reducing Them (Safe Water Engineering for NRDC, Feb 2024; RSMeans 2024 national-average scenarios)
Plumbing permit for utility connection work$100.00$300.00$1,300.00flatPlumbing Permit Fee Schedule, effective July 1, 2025, Lead Service Line Replacement Costs and Strategies for Reducing Them (Safe Water Engineering for NRDC, Feb 2024; RSMeans 2024 national-average scenarios)
Road bore or street cut incl. pavement restoration (per crossing)$1,000.00$4,000.00$10,000.00flatLead Service Line Replacement Costs and Strategies for Reducing Them (Safe Water Engineering for NRDC, Feb 2024; RSMeans 2024 national-average scenarios), Raleigh Water FY25 Fee Schedule (water/sewer only), Right-of-Way Permit Fee Schedule (effective Jan 1, 2025), Frequently Asked Questions - Excavation 'E' Permits (Street Damage Restoration Fee)
Conventional septic system (tank + gravity drainfield), installed$5,000.00$10,000.00$20,000.00flatTypes of Septic Systems, How Much Does a Septic Tank System Cost? (2026), SepticSmart Week: Funding your septic fix (Sept 2025)
Septic tank abandonment when connecting to sewer$700.00$1,500.00$3,500.00flatSeptic Tank Abandonment Permit, Septic Tank Abandonment Application, Septic Tank Abandonment Guide (2026)
Engineered septic: mound, ATU or nitrogen-reducing system$12,000.00$20,000.00$35,000.00flatSeptic Upgrade Incentive Program FAQs (rev. 07/16/2025), Septic Upgrade Incentive Program, SepticSmart Week: Funding your septic fix (Sept 2025), Types of Septic Systems, How to Care for Your Septic System, How Much Does a Septic Tank System Cost? (2026)
Septic tank pumping (per event; every 3-5 years per EPA)$300.00$450.00$800.00flatHow to Care for Your Septic System, How Much Does Septic Tank Pumping Cost? (2026), How Much Does It Cost to Pump a Septic Tank? (2026), On-site Septic Systems
Sewer lateral 4-6 in. PVC, installed incl. trench (per foot)$50.00$100.00$250.00per_ftRaleigh Water FY25 Fee Schedule (water/sewer only), Sewer lateral program - Frequently Asked Questions, How Much Does Sewer Line Replacement Cost? (2026)
Municipal sewer tap/connection fee (residential, excl. impact fee)$200.00$3,000.00$6,100.00flatTap & Impact Fees, Tap Fees, effective July 1, 2025 (Board approved 6-24-25), Raleigh Water FY25 Fee Schedule (water/sewer only), Charlotte Water FY26 Rates and Fees (effective 7/1/2025-6/30/2026)
Pad-mount transformer (customer-paid share)$2,000.00$5,000.00$15,000.00flatSchedule of Charges for Electric Services (last approved Mar 1, 2022; updated Sep 5, 2023), How Much Does It Cost to Run a New Electrical Service Line? (2026)
Trenching multiplier: solid rock / ledge$2.50$4.00$7.00multiplierRaleigh Water FY25 Fee Schedule (water/sewer only), Lead Service Line Replacement Costs and Strategies for Reducing Them (Safe Water Engineering for NRDC, Feb 2024; RSMeans 2024 national-average scenarios), Electric Line Extensions, Relocations and Upgrades tariff (effective June 15, 2025)
Trenching multiplier: rocky soil / heavy clay$1.20$1.50$2.00multiplierTrenching Cost (2026), How Much Does Trenching Cost Per Foot? (2026), Residential Water Connection Fees
Trenching in normal soil, excavate + backfill (per foot)$4.00$8.00$15.00per_ftLead Service Line Replacement Costs and Strategies for Reducing Them (Safe Water Engineering for NRDC, Feb 2024; RSMeans 2024 national-average scenarios), How Much Does Trenching Cost Per Foot? (2026), Trenching Cost (2026)
Water meter set, 5/8-1 in. (utility meter + install charge)$200.00$300.00$500.00flatCharlotte Water FY26 Rates and Fees (effective 7/1/2025-6/30/2026), Raleigh Water FY25 Fee Schedule (water/sewer only), Tap & Impact Fees
Water service line, contractor installed incl. trench (per foot)$30.00$50.00$150.00per_ftLead Service Line Replacement Costs and Strategies for Reducing Them (Safe Water Engineering for NRDC, Feb 2024; RSMeans 2024 national-average scenarios), Economic Analysis Appendices for the Final Lead and Copper Rule Improvements (Oct 2024)
Municipal water tap/connection fee (residential, excl. impact fee)$500.00$1,600.00$5,500.00flatTap & Impact Fees, Tap Fees, effective July 1, 2025 (Board approved 6-24-25), Residential Water Connection Fees, Charlotte Water FY26 Rates and Fees (effective 7/1/2025-6/30/2026), Raleigh Water FY25 Fee Schedule (water/sewer only)
Private well annual maintenance (inspection + water test)$100.00$350.00$1,000.00flatAnnual Water Well Inspection - Annual Checkup, How Much Does a Well Inspection Cost? (2026)
Private well drilling + casing (per foot)$15.00$35.00$70.00per_ftEIS Attachment: Well Drilling Costs (government-posted reprint of a national consumer cost table, 2020), How Much Does Well Drilling Cost? (2026)

What an estimate leaves out

Unless a specific line item says otherwise, the calculator does not include private plumbing inside the home, landscaping restoration, engineering, easements, HOA charges, or taxes. Site conditions, capacity upgrades, required permits, and utility-specific allowances can change the scope. Get a written utility determination and contractor quote before committing to a project.

See the sources and data policy for source selection and the fee database for downloadable official records.