The meter itself is one of the cheapest parts of a new water connection. Published charges to buy and set a residential meter run from about $111 (Austin Water, 5/8-inch, provisional FY2027 sheet) to $835 (Frisco, 1-inch, including a $150 deposit), and our national estimate is $200 to $500 with a $300 midpoint. The meter’s size is what costs money. Most utilities multiply their capacity fees by meter size, so moving from a 5/8-inch to a 1-inch meter adds $4,840 in Charlotte, $8,256 in Fort Worth and $11,338 at the Las Vegas Valley Water District.

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

What “meter installation” means on a new home

On new construction the meter is the last piece the utility installs. Your plumber or the utility has already tapped the main and run the service to a meter box at the property line. Then the utility sets the meter, sometimes with a yoke or setter, an automated reading device, and an inspection. Depending on the utility, you may see these as one line or as four:

Some utilities fold the meter into the tap fee instead. Tucson Water’s $1,740 5/8-inch price covers a new service line and the meter, and OUC’s $4,155 standard connection does too. Check before you add a separate meter charge to a quote that already includes one.

Meter charges by size

Published charges for the meter and its setting on a single-family service. A dash means the utility’s table does not list that size. Capacity fees are in the next table. Checked 2026-09-24.

Utility Charge 5/8″ 3/4″ 1″ Effective / source
Austin Water Meter cost (domestic)* $111.30 $138.86 $215.18 FY2027 sheet, pending
Charlotte Water Meter charge (developer-installed service) $208 $327 FY2027
Denver Water New meter fee $265 $275 $310 Other Fees (current)
Raleigh Water Water meter charge $290 $420 FY2027
Columbus Meter charge, disc meter (a meter-box setting costs $451 / $514 / $626 plus a $241 / $271 / $341 yoke) $335 $397 $515 April 1, 2026
OUC (Orlando) Meter and box only (customer builds line) $460 $530 Jan. 1, 2026
McKinney Meter set, inside city $510 $565 Oct. 1, 2025
Tucson Water Meter on an existing service line $560 $550 $630 July 6, 2026
Sacramento Meter (city removes idler, installs meter) $723 July 2026
Frisco Residential meter fee (incl. $150 deposit) $835 March 2, 2026

*Austin Water marks its FY2026-27 fee sheet as based on a workbook pending final adoption. Treat those three amounts as provisional. McKinney charges double outside city limits ($1,020 for 3/4-inch, $1,130 for 1-inch). LVVWD and Salt Lake City bill the meter hardware at cost, so they have no fixed price to list.

How meter size multiplies capacity fees

Capacity, impact and system development fees are usually priced per “equivalent” unit: an EDU, ERC, service unit or customer equivalent. The smallest residential meter counts as one unit and bigger meters count as more. The multipliers below come straight from the utilities’ own schedules.

Water capacity-type fees for one single-family connection by meter size. Amounts marked “derived” are our multiplication of the published per-unit fee by the published multiplier. Checked 2026-09-24.

Utility and fee Multiplier 5/8″ : 3/4″ : 1″ 5/8″ 3/4″ 1″ Effective / source
Austin Water capital recovery fee (plats on/after 10/1/2023) 1 : 1.5 : 2.5 service units $4,800 $7,200 (derived) $12,000 (derived) Austin Water
SAWS water impact fees, low elevation zone 1 : 1.5 EDU $5,470 $8,205 (derived) plats from July 1, 2024
Fort Worth water impact fee (permits to 9/30/2026) 1 : 1.5 : 2.5 $2,824 $4,236 $7,060 Ord. 27745-06-2025
Raleigh Water capital facility fee published by size $1,447 $2,171 $3,618 FY2027
Charlotte Water system development fee published by size $1,453 $3,632 FY2027
OUC system development charge (no reclaimed water) 1.00 : – : 1.99 ERC $2,325 $4,627 Jan. 1, 2026
Portland Water Bureau SDC published by size $5,483 $8,224 $13,707 FY2026-27
Seattle Public Utilities water SDC – : 1.0 : 1.7 $6,900 $11,730 Jan. 1, 2026
Charleston Water System impact fee published by size $4,620 $7,370 2026
SNWA regional connection charge (LVVWD) published by size $7,998 $7,998 $15,780 March 1, 2026
LVVWD facilities connection charge published by size $2,371 $3,556 $5,927 same
Columbus water capacity charge (inside city) published by size $1,406 $1,406 $2,210 April 1, 2026
Tucson Water CAP water resource fee published by size $240 $360 $600 current

The pattern is steady. Where a utility publishes all three sizes, the 1-inch figure is roughly 2.5 times the 5/8-inch figure: Fort Worth ($2,824 × 2.5 = $7,060), Raleigh, Charlotte and Portland all follow it. Seattle uses 1.7 and OUC uses 1.99. Some utilities charge the same up to 1 inch. Phoenix’s water treatment impact fee is $4,387 for any single-family meter up to 1 inch, and Columbus and SNWA treat 5/8-inch and 3/4-inch alike.

Worked examples: the cost of going from 5/8 to 1 inch

In most of these cities, the meter hardware adds about $50 to $200 when you upsize. The capacity fee adds thousands.

Irrigation: the second meter

A separate irrigation meter is usually priced as a new connection, not as an add-on. Published examples:

People usually add the meter so lawn water can be tracked separately. Many utilities bill sewer from metered water use, so ask whether water through an irrigation meter is billed for sewer before you count on savings. Also ask whether it needs its own backflow assembly. OUC, for example, adds $445 to a 5/8-inch connection when a backflow device is included ($4,600 vs $4,155).

Fire sprinklers and meter upsizing

Residential fire sprinklers can push the water meter up a size, because the system has to deliver its design flow through the service. When that happens, the upsizing multipliers above apply to capacity fees even though the house uses no more water day to day. We have not found a utility in our data set that publishes a separate sprinkler-driven meter price, so we don’t quote one. Before the design is finalized, ask the utility and your sprinkler designer:

Timing, deposits and “not ready” charges

The meter is set after the service line passes inspection, and a failed visit can cost you. Raleigh charges a $50 “not ready” fee if the stub is missing or substandard. Frisco charges $100 when the meter site is not ready. Waits vary: Frisco usually sets meters under 2 inches the next business day, Dallas says appointments can take eight weeks or more, and Atlanta’s Department of Watershed Management takes about 15 weeks after full payment. Starting service also brings account charges. Examples are El Paso’s $75 refundable deposit, SAWS’s $100 residential deposit, OUC’s $25 initial connection charge and Charleston’s $35 water origination fee.

Changing a meter later has its own price. LVVWD charges the new meter’s cost plus $45 for a size change, and the capacity-fee difference for the larger size usually applies too.

Meter prices are small and change often. Capacity fees are large and change on fixed dates: Fort Worth on October 1, Charleston on January 1, SNWA on March 1, Raleigh and Charlotte with the July 1 fiscal year. Price the meter size on the schedule that will be in effect when you pay.

Related guides

Water tap fee · Water connection cost · Water service line cost · Tap fee vs impact fee · Tap fees by city · Utility connection cost calculator · Texas utility connection costs · North Carolina utility connection costs

Frequently asked questions

How much does a new water meter cost to install?

Published residential meter charges run from about $111 (Austin Water, 5/8-inch, provisional) to $835 (Frisco, 1-inch, including a $150 deposit). Denver Water charges $265 to $310 and Raleigh $290 to $420. Our national estimate is $200 to $500. Capacity fees, which depend on meter size, are billed separately and cost far more.

Should I get a 5/8, 3/4 or 1-inch water meter?

Choose the smallest size your plumbing design supports, because capacity fees scale with meter size. A 1-inch meter costs $4,840 more than a 5/8-inch in Charlotte, $8,256 more in Fort Worth (water plus wastewater impact) and $11,338 more at LVVWD. Large homes, many fixtures or fire sprinklers can justify the upsize; your plumber’s fixture-count calculation should decide it.

What does 5/8 x 3/4 mean on a water meter?

It describes a 5/8-inch meter with 3/4-inch connections, the common size for single-family homes. Fort Worth lists its smallest impact fee under “5/8 x 3/4” ($2,824 in FY2026). SAWS bases its one-EDU fee on a 5/8-inch meter with a 3/4-inch service line.

How much is a second water meter for irrigation?

It depends on whether the utility treats it as a split off the domestic line or a new connection. Raleigh charges $859 for a 3/4-inch split on a new application, Charlotte $2,868 for a 5/8-inch split irrigation connection, and El Paso $4,800 for a yard meter under 1 inch. Ask whether a system development fee and a backflow device are also required.

Do fire sprinklers require a bigger water meter?

They can, depending on the system’s required flow and the service pressure. If the meter goes up a size, capacity fees usually follow the larger size, which runs to thousands of dollars in the cities above. Ask the utility whether it offers a separate fire line or exempts fire service from impact fees, as El Paso Water does.

Who installs the water meter on a new house?

Almost always the utility, after your contractor or the utility has built the service and meter box. OUC, for example, sets the meter and box for $460 when your contractor installs the line. Utilities inspect before or at meter set, such as Denver Water’s $155 inspection.