OUC, City of Orlando & Orange County Water and Sewer Connection Fees (2026)

Last reviewed: By Utility Cost Guide research team

Orlando splits utility service between agencies. Inside city limits, the Orlando Utilities Commission (OUC) provides water and the City of Orlando’s Water Reclamation Division provides sewer. In unincorporated Orange County, Orange County Utilities (OCU) usually provides both. For a new house inside the city with a 5/8-inch meter, no reclaimed water and OUC installing the complete service, the one-time charges are $2,325 (OUC system development charge) + $4,155 (OUC service connection) + $2,537.50 (city sewer impact fee) + $50 (sewer permit) = $9,067.50, or $12,017.50 if the city also has to build the sewer lateral (OUC tariff, January 2026). In unincorporated Orange County, capital charges alone are $2,790 for water and $5,270 for sewer, or $8,060. An Orlando mailing address does not tell you which agency serves the parcel, so confirm both providers for the exact address first.

Who serves your address

Providers and fee sources by area, as published by each agency.

Area Water Sewer Main one-time charges
City of Orlando OUC City of Orlando Water Reclamation OUC system development charge + connection charge; city sewer impact fee + permit
Unincorporated Orange County Orange County Utilities Orange County Utilities Water and wastewater capital charges per ERC/ERU

The city/county line is only the starting point. Water and sewer can come from different agencies, so call the utility you think serves the parcel before you rely on any number below.

Official fees at a glance

The first table covers the City of Orlando area: OUC’s water charges from its January 2026 tariff, and the city’s residential sewer connection fees. OUC charges a system development charge (SDC) for capacity, priced in ERCs of 275 gallons per day, plus a service connection charge. The connection charge depends on who builds the line. The city sewer page lists three amounts but gives no effective date.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
General — Account Setup
GeneralAccount SetupInitial / Transfer Connection Charge$25flat fee2026-01-01Official source2026-09-24
Sewer — Impact
SewerImpactResidential Sewer Impact Fee$2,537.50flat feeOfficial source2026-09-24
Sewer — Permit
SewerPermitResidential Sewer Permit Fee$50flat feeOfficial source2026-09-24
Sewer — Service Line
SewerService LineResidential Sewer Lateral Construction$2,950flat feeOfficial source2026-09-24
Water — Capacity
WaterCapacityWater System Development Charge (SDC) - single-family, no reclaim1"$4,627per unit2026-01-01Official source2026-09-24
WaterCapacityWater System Development Charge (SDC) - single-family, no reclaim5/8"$2,325per unit2026-01-01Official source2026-09-24
Water — Connection
WaterConnectionStandard Metered Service Connection Charge - OUC installs complete service
OUC installs complete service
1"$4,235by meter size2026-01-01Official source2026-09-24
WaterConnectionStandard Metered Service Connection Charge - OUC installs complete service
OUC installs complete service
5/8"$4,155by meter size2026-01-01Official source2026-09-24
Water — Meter Set
WaterMeter SetStandard Metered Service Connection Charge - customer installs connection, OUC sets meter
Customer installs connection; OUC sets meter
1"$530by meter size2026-01-01Official source2026-09-24
WaterMeter SetStandard Metered Service Connection Charge - customer installs connection, OUC sets meter
Customer installs connection; OUC sets meter
5/8"$460by meter size2026-01-01Official source2026-09-24

The second table covers Orange County Utilities. OCU charges capital charges per equivalent residential connection or unit (ERC/ERU), and one single-family home counts as one. County Code Sec. 37-5 applies these rates to plans submitted on or after April 1, 2025. We have not yet collected OCU’s meter or installation charges, so the table shows capacity only.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
General — Inspection
GeneralInspectionUtilities inspection feeSee formulaPercentOfficial source2026-09-24
Sewer — Capacity
SewerCapacityWastewater Capital Charge$5,270per equivalent residential unitOfficial source2026-09-24
Water — Capacity
WaterCapacityWater Capital Charge$2,790per equivalent residential unitOfficial source2026-09-24

Worked example: a new single-family home

Assumptions: one detached house with a 5/8-inch potable meter, no fire sprinkler, the January 2026 OUC tariff, and the fees shown on the city and county pages as of September 24, 2026. The cases differ by jurisdiction, by who builds the water line and by whether the lot has reclaimed water for irrigation.

One-time official charges for one house (sources: OUC Water Tariff Book, Jan 2026; City of Orlando residential sewer connection; Orange County Utilities permitting fees).

Charge A. City, OUC installs service, no reclaim B. City, builder installs line, reclaimed water C. Unincorporated Orange County
Water capacity $2,325 (OUC SDC, 1 ERC) $1,395 (OUC SDC with reclaim, 0.60 ERC) $2,790 (OCU water capital charge)
Water connection / meter $4,155 (OUC installs complete service) $460 (OUC sets meter and box only) not collected
Sewer capacity $2,537.50 (city impact fee) $2,537.50 $5,270 (OCU wastewater capital charge)
Sewer permit $50 $50 not collected
Total $9,067.50 $4,442.50 $8,060 + meter/install

The arithmetic: A is $2,325 + $4,155 + $2,537.50 + $50 = $9,067.50. B is $1,395 + $460 + $2,537.50 + $50 = $4,442.50. C is $2,790 + $5,270 = $8,060 before any OCU meter or tap charge. Three adjustments can apply:

Meter size matters at OUC too. A 1-inch meter without reclaim carries a $4,627 SDC (with reclaim, $1,511), and the full-service connection rises to $4,235.

What these fees don’t include

OUC’s full-service charge covers the connection, service line, curb stop, meter and box. It does not cover piping from the meter to the house. On the sewer side, the city’s lateral charge applies only when the city builds it. Private work to plan for:

These ranges come from our national benchmark set. If the lot is on septic today, see septic vs. sewer cost. To add private work to the official fees:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

How and when you pay

The City of Orlando sewer page shows no effective date for its $2,537.50 impact fee, $50 permit fee or $2,950 lateral charge. Ask the Water Reclamation Division to confirm the amounts current on your permit date.

Changes to watch

OUC’s figures come from its tariff dated January 2026. OUC has published its tariff as dated editions, so check for a newer one before paying. Orange County’s capital charges apply to plans submitted on or after April 1, 2025, which means your plan submittal date, not your permit date, sets the rate. We have no dated schedule for the city sewer fees.

Frequently asked questions

Who provides water and sewer in Orlando?

Inside city limits, OUC provides water and the City of Orlando’s Water Reclamation Division provides sewer. In unincorporated Orange County, Orange County Utilities typically provides both. Verify by parcel, since a mailing address can say Orlando outside city limits.

How much is the OUC water connection fee for a new house?

Under the January 2026 tariff, OUC charges $4,155 to install a complete 5/8-inch service, or $460 to set the meter when your contractor builds the line. The $2,325 system development charge is separate, or $1,395 if the lot has reclaimed water.

What is the City of Orlando sewer impact fee?

The city lists a residential sewer impact fee of $2,537.50 and a $50 permit fee. If the city must build the lateral, it charges $2,950. The page gives no effective date.

What are Orange County Utilities capital charges?

OCU charges $2,790 per ERC for water and $5,270 per ERU for wastewater, and a single-family home counts as one of each. They are due before the building permit and apply to plans submitted on or after April 1, 2025.

Does reclaimed water lower connection fees?

At OUC it does. A single-family home with reclaimed water at the premises is assessed 0.60 ERC, a $1,395 SDC instead of $2,325. At Orange County Utilities, reclaimed-water connections carry no capital charge.

Related pages

See the Florida utility connection costs hub and Tampa tap fees, or compare with Charleston and Charlotte. Related guides: tap fee vs. impact fee, water meter installation cost, sewer lateral cost and tap fees by city.

Sources