Tampa Water Connection & Capacity Fees (2026)

Last reviewed: By Utility Cost Guide editor

Inside Tampa city limits, the City of Tampa Water Department provides water and the Wastewater Department provides sewer. A new single-family home counts as one equivalent residential unit (ERU). Using the smallest meter on the city’s schedule (3/4 inch), outside the special CIAC areas, the one-time charges add up to $2,800 (water connection) + $1,713 (water capacity) + $665 (meter installation) + $50 (meter application) + $1,237 (wastewater capacity) = about $6,465, plus a $45 deposit. In Downtown or South Tampa the water side adds a $2,145 contribution-in-aid-of-construction charge, for about $7,917. The main caveat is the water schedule itself: the current PDF on tampa.gov is marked “Updated March 2021,” and the city has proposed capacity-fee changes, so confirm every water figure before you rely on it.

Tampa connection fees at a glance

The table shows every Tampa row we recorded. The wastewater capacity fee ($1,237 per ERU) comes from the city’s current wastewater capacity fee page and is marked verified. The water rows come from the Water Connection and Service Fees PDF. It sits in the site’s 2026 folder but is labeled “Updated March 2021,” so we flag those rows “Confirm with utility”. The water side has three layers: a connection fee by meter size (higher outside city limits), a capacity fee per ERU, and in designated CIAC areas a reduced capacity fee plus a separate CIAC charge. The $1,237 wastewater capacity fee is also listed next to other cities’ sewer allocation fees in our sewer allocation fee guide.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Sewer — Capacity
SewerCapacityWastewater Capacity Fee—$1,237per ERU—Official source2026-09-24
Water — Account Setup
WaterAccount SetupWater Meter Application Fee3/4"$50by meter size—Official source2026-09-30
Water — Capacity
WaterCapacityWater Capacity Fee - Non-CIAC areas—$1,713per ERU (300 gpd)2023-03-01Official source2026-09-30
Water — Connection
WaterConnectionWater Connection Fee - new construction, inside city1"$7,00021-50 gpm—Official source2026-09-30
WaterConnectionWater Connection Fee - new construction, inside city3/4"$2,8000-20 gpm—Official source2026-09-30
Water — Deposit
WaterDepositWater Meter Deposit3/4"$45by meter size—Official source2026-09-30
Water — Meter
WaterMeterWater Meter Installation3/4"$665by meter size—Official source2026-09-30
Water — Other
WaterOtherContribution in Aid of Construction (CIAC) - Downtown and South Tampa—$2,145per ERU (300 gpd)2012-03-15Official source2026-09-30
Tampa’s water connection, capacity, CIAC and meter figures come from a document dated March 2021 (some line items carry earlier effective dates: the non-CIAC capacity fee 2023, the Downtown/South Tampa CIAC 2012). The city has proposed capacity-fee updates. Treat the water totals on this page as a starting estimate and confirm with the Water Department.

Worked example for a single-family home in Tampa

Assumptions: one detached house inside city limits, 3/4-inch meter (the smallest size on the city’s schedule), one ERU for water and one for wastewater, which City Code 26-37(a) ties together. We also assume the connection fee and the meter installation charge both apply to new construction, since the PDF lists them separately. Ask the city whether that is right for your permit.

City of Tampa one-time charges for one house, by water service area (sources: Water Connection and Service Fees, updated March 2021 (confirm with utility); Wastewater Capacity Fees).

Charge A. Non-CIAC area B. Downtown / South Tampa CIAC area C. Northeast CIAC area
Water connection fee, 3/4″, inside city $2,800 $2,800 $2,800
Water capacity fee (1 ERU) $1,713 $1,020 $1,020
CIAC charge (1 ERU) none $2,145 $2,724
Meter installation, 3/4″ $665 $665 $665
Meter application fee $50 $50 $50
Wastewater capacity fee (1 ERU) $1,237 $1,237 $1,237
Total fees $6,465 $7,917 $8,496
Refundable deposit (waiver available) $45 $45 $45

The arithmetic for A is $2,800 + $1,713 + $665 + $50 + $1,237 = $6,465. In B, the capacity fee drops to $1,020 but the $2,145 CIAC charge is added: $2,800 + $1,020 + $2,145 + $665 + $50 + $1,237 = $7,917. C uses the Northeast Area CIAC of $2,724 instead: $8,496.

Two other variables move the total by thousands. Location outside city limits: the same 3/4-inch connection is $3,500 instead of $2,800 where Tampa Water serves beyond the city line, adding $700. Meter size: a 1-inch connection is $7,000 inside the city ($8,750 outside), so case A with a 1-inch connection would come to $10,665 if the capacity, meter and wastewater charges stayed at their one-ERU, 3/4-inch amounts. We could not confirm that from the PDF, so check with the city before you accept a 1-inch connection.

Neighborhood Sewer Improvement fees can also apply to some lots, on top of the wastewater capacity fee. We did not collect those amounts.

What Tampa’s fees don’t cover

Tampa’s charges cover the city’s connection, capacity and meter. The pipe on your lot is separate:

For a house 40 feet from the street, typical private work is about 40 × $50 = $2,000 for water and 40 × $100 = $4,000 for sewer, installed including the trench. These ranges come from our national benchmark set, not from Tampa. Add them with the calculator:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

How and when Tampa fees are paid

Upcoming changes in Tampa

Tampa has proposed updates to its capacity fees, and the water schedule we used is labeled March 2021. Expect the water totals above to change, and check the city’s pages again before you close or pull a permit. Unincorporated Hillsborough County has its own schedule. The county adopted higher water and wastewater impact fees in Resolution R25-111 (December 17, 2025), collected from March 23, 2026 and phased in each March through 2029; in the South/Central area the combined fee reaches $13,270 per home. See why tap fees are going up for the schedule.

Tampa connection fee questions

How much does it cost to connect a new house to Tampa water and sewer?

Inside city limits, outside CIAC areas, the published charges total about $6,465 for a 3/4-inch meter, plus a $45 deposit. Downtown and South Tampa lots pay about $7,917 because of a $2,145 CIAC charge. The water figures come from a 2021-labeled schedule and need confirmation.

What is a CIAC charge in Tampa?

A contribution in aid of construction is an extra per-ERU water charge in designated areas: $2,145 in Downtown and South Tampa and $2,724 in the Northeast Area. In those areas, the regular water capacity fee drops to $1,020 per ERU.

What is Tampa’s wastewater capacity fee?

It is $1,237 per ERU, and a single-family home counts as one ERU. Neighborhood Sewer Improvement fees may apply in some areas.

Is Tampa water more expensive outside city limits?

Yes. The water connection fee for a 3/4-inch meter is $3,500 outside the city versus $2,800 inside, and a 1-inch connection is $8,750 versus $7,000.

Are Hillsborough County impact fees the same as Tampa’s?

No. Unincorporated Hillsborough County has its own fee schedule, which the county raised in December 2025 with increases phased in through 2029. Confirm which of the two serves your parcel before you use any figure.

Related guides for Tampa

Farther south, Fort Myers water and sewer connection fees compare city and Lee County Utilities service.

East along I-4, Lakeland water and wastewater impact fees come from a city that also runs the electric utility, and to the south Cape Coral’s utility capital expansion fees add a separate irrigation charge.

See the Florida utility connection costs hub and Orlando (OUC) connection fees, or the full tap fees by city table. Related guides: tap fee vs. impact fee, water tap fee, sewer tap fee and the utility connection cost calculator.

Official documents behind the Tampa figures