Fort Myers & Lee County Utilities Water and Sewer Fees (2026)

Last reviewed: By Utility Cost Guide editor

Two public utilities connect new houses around Fort Myers. Inside the city, water and sewer usually come from the City of Fort Myers, whose schedule for May 4, 2026 to May 3, 2027 charges a single-family home $3,353.39 (water impact fee with admin fee) + $3,514.01 (sewer impact fee with admin fee) + $150 (5/8-inch meter installation) = $7,017.40. In other parts of Lee County the provider can be Lee County Utilities (LCU), where the same house pays $3,050 (water capacity fee) + $3,325 (wastewater capacity fee) + $435 (meter drop-in) = $6,810, or $8,688 if LCU has to tap the main. The first thing to settle is which utility serves your lot, because a Fort Myers mailing address does not decide it. For how this compares nationally, see our guide to the cost to connect to city water. Lee County Utilities’ $3,325 wastewater and $3,050 water capacity fees are compared with other cities in our sewer allocation fee guide.

Fort Myers connection fees at a glance

The table lists every row we verified for both providers, so read it as two separate price lists, not one bill. The City of Fort Myers rows come from its impact fee schedule for May 4, 2026 to May 3, 2027. The city publishes each impact fee with a small administrative fee on top (2.3% on water and sewer), and we record the published total. The Lee County Utilities rows come from its new construction fees page (capacity fees as of May 5, 2026) and its meter drop-in and tap-in sheet valid through September 30, 2026. Deposits, account charges, larger meters and plan review are real fees that a typical new house either does not pay or gets back, so they are kept out of the totals below.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Electric — Account Setup
ElectricAccount SetupConnection of Initial Service—$12flat fee2026-01-01Official source2026-09-25
General — Plan Review
GeneralPlan ReviewPlan Review Fee (greater of 1% of contributed asset value or minimum)—$835formula2025-02-04Official source2026-09-25
Sewer — Capacity
SewerCapacityWastewater Connection (Capacity) Fee, Single-Family Residential (1.00 ERU)
Lee County Utilities service
—$3,325per equivalent residential unit2026-05-05Official source2026-09-25
Sewer — Deposit
SewerDepositWastewater Customer Deposit, Single-Family—$125flat fee2025-02-04Official source2026-09-25
Sewer — Impact
SewerImpactSanitary Sewer Impact Fee - Sewer Connection, Single Family (impact fee $3,435.00 + admin. fee $79.01)
City of Fort Myers service
5/8"$3,514.01per unit2026-05-04Official source2026-09-25
Sewer — Tap
SewerTapWastewater Main Tap Charge—See formulavaries2025-02-04Official source2026-09-25
Water — Account Setup
WaterAccount SetupNew residential account service charge—$35flat fee—Official source2026-09-25
WaterAccount SetupTurn-On Fee, initiation of service by customer request (regular business hours)—$45flat fee2025-02-04Official source2026-09-25
Water — Capacity
WaterCapacityWater Connection (Capacity) Fee, Single-Family Residential (1.00 ERU)
Lee County Utilities service
—$3,050per equivalent residential unit2026-05-05Official source2026-09-25
Water — Deposit
WaterDepositResidential deposit for water, sewer and trash service—$175flat fee—Official source2026-09-25
WaterDepositWater Customer Deposit, Single-Family—$70flat fee2025-02-04Official source2026-09-25
Water — Impact
WaterImpactWater Impact Fee - Water Connection, Single Family (impact fee $3,278.00 + admin. fee $75.39)
City of Fort Myers service
5/8"$3,353.39per unit2026-05-04Official source2026-09-25
Water — Meter Set
WaterMeter SetMeter installation fee, 1-inch1"$225by meter size2026-05-04Official source2026-09-25
WaterMeter SetWater Meter Installation Fee (Drop-In Charge), 1" meter1"$601by meter size2025-10-01Official source2026-09-25
WaterMeter SetMeter (5/8") installation fee
City of Fort Myers meter
5/8"$150by meter size2026-05-04Official source2026-09-25
WaterMeter SetWater Meter Installation Fee (Drop-In Charge), 5/8" meter
Lee County Utilities, tap already in
5/8"$435by meter size2025-10-01Official source2026-09-25
Water — Other
WaterOtherAdditional Bore Charge, 5/8" meter5/8"$2,282by meter size2025-10-01Official source2026-09-25
Water — Tap
WaterTapWater Meter Tap-in Charge, 1" meter1"$2,511by meter size2025-10-01Official source2026-09-25
WaterTapWater Meter Tap-in Charge, 5/8" meter
Lee County Utilities, main must be tapped
5/8"$2,313by meter size2025-10-01Official source2026-09-25

Which utility serves your lot?

The city’s own rate schedule has separate monthly rates for customers inside and outside the city limit, so the city’s water system reaches past its boundary. Lee County Utilities, a county department, serves other parts of Lee County. Before you budget, ask the City of Fort Myers Utility Billing office (239-321-8100) and Lee County Utilities which of them will serve the parcel, and whether a water service tap already exists at the lot line. At today’s rates the answer moves the bill by $207.40 to $1,670.60, and more if LCU adds a bore charge.

Worked example: a new home in Fort Myers

Assumptions: one detached house, a 5/8-inch meter, one equivalent residential unit (ERU) for LCU, and fees at the rates in force in September 2026. The LCU capacity fee is the one in effect when the Commitment to Serve is requested.

One-time charges for one new house, 5/8-inch meter (sources: Fort Myers impact fee schedule 2026–27; LCU new construction fees; LCU drop-in and tap-in charges).

Charge City of Fort Myers LCU, tap already in (drop-in) LCU, main must be tapped
Water impact / capacity fee $3,353.39 $3,050.00 $3,050.00
Sewer impact / wastewater capacity fee $3,514.01 $3,325.00 $3,325.00
Meter installation, drop-in or tap-in $150.00 $435.00 $2,313.00
Total fees $7,017.40 $6,810.00 $8,688.00
Account charge at move-in $35 service charge $45 turn-on fee $45 turn-on fee
Refundable deposits (LCU’s can be waived) $175 (water, sewer, trash) $70 water + $125 sewer $70 water + $125 sewer

City: $3,353.39 + $3,514.01 + $150 = $7,017.40. The two impact fees break down as $3,278 + $75.39 admin for water and $3,435 + $79.01 admin for sewer. LCU with an existing tap: $3,050 + $3,325 + $435 = $6,810. LCU with a new tap: $3,050 + $3,325 + $2,313 = $8,688. The LCU sheet also lists an additional bore charge of $2,282 for a 5/8-inch meter without saying when it applies; if your lot needs it, the tapped-main total would be $10,970.

A larger meter changes only the meter line in both systems. In the city, a 1-inch meter installation is $225, so the total becomes $7,092.40; the city’s residential fees are per unit, “plus meter installation fee.” At LCU a 1-inch drop-in is $601 ($6,976 total) and a 1-inch tap-in is $2,511 ($8,886 total), since a single-family home is charged as one ERU.

How Fort Myers compares with Cape Coral

Across the river, Cape Coral charges a served lot in sewer District 1 with city irrigation $7,571, and $8,669 in District 2 (fees effective July 27, 2026). A City of Fort Myers house at $7,017.40 costs $553.60 less than the District 1 case, and an LCU house with a drop-in meter at $6,810 costs $761 less. A District 1 Cape Coral home without city irrigation pays $6,442, less than either Fort Myers case. Cape Coral’s third system, irrigation, accounts for $2,636 of its total; neither Fort Myers provider charges a separate irrigation capacity fee in these schedules. The bigger risk in Cape Coral is a land-area assessment of $25,000 or more on lots in extension areas, which has no counterpart in the fees recorded here.

Costs outside the Fort Myers fee schedule

Both utilities stop at the meter. Your plumber runs the pipe from the meter and the sewer connection to the house:

At 40 feet from the lot line that is roughly 40 × $50 = $2,000 for water and 40 × $100 = $4,000 for sewer (national benchmarks, not local figures). The city’s impact fee schedule also lists road, fire, EMS, school and park impact fees; with water, sewer and the meter, the single-family total on that schedule is $16,997.09. Those non-utility fees are outside this page. Electric service in the city is from Florida Power & Light, whose tariff sheet 4.020 charges $12 to connect initial service (effective January 1, 2026); temporary construction service is $626.89 overhead or $501.71 underground. Parts of the county are on the Lee County Electric Cooperative, whose fees we did not record. Add your own distances in the calculator:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

Paying Fort Myers fees: timing and process

The city’s schedule does not say at what stage impact fees are collected. For questions about the city’s water and sewer impact fees, the schedule lists (239) 321-7448.

Upcoming changes in Fort Myers

Fort Myers connection fee questions

How much are water and sewer impact fees in Fort Myers?

For a single-family home on city service from May 4, 2026 to May 3, 2027, the City of Fort Myers charges $3,353.39 for water and $3,514.01 for sewer, each including a small admin fee. Add $150 for a 5/8-inch meter and the total is $7,017.40.

What does Lee County Utilities charge to connect a new house?

From May 5, 2026, the capacity fees are $3,050 for water and $3,325 for wastewater per single-family home. The 5/8-inch meter adds $435 where the tap exists or $2,313 where LCU taps the main, for $6,810 or $8,688.

Will Lee County Utilities capacity fees go up?

Yes. They rise each May 5 through 2028: to $3,355 and $3,657.50 in 2027, then $3,660 and $3,990 in 2028. The rate is locked by when the Commitment to Serve is requested.

Is a Fort Myers address served by the city or by Lee County Utilities?

It depends on the parcel, not the mailing address. The city has separate rates for customers outside its limits, and LCU serves other parts of Lee County. Ask both utilities about your parcel before you buy or price a build.

Are Fort Myers impact fees cheaper than Cape Coral’s?

Against a served Cape Coral lot with city irrigation, yes: Cape Coral’s District 1 total is $7,571, against $7,017.40 on Fort Myers city service and $6,810 on LCU with an existing tap. Without city irrigation, a District 1 Cape Coral home pays $6,442, which is less. Cape Coral lots in extension areas can owe $25,000 or more on top.

Can the utility deposit be waived?

LCU waives its $70 water and $125 sewer deposits for customers with a good recent LCU payment record, a utility reference letter, or autopay plus paperless billing within 20 days. The city’s new-service page lists a $175 deposit and does not mention a waiver.

Where to go next from Fort Myers

Florida utility connection costs · Cape Coral connection fees · Port St. Lucie tap fees · Hillsborough County impact fees · Tap fee vs. impact fee · Water meter installation cost · Utility connection cost calculator

Official documents behind the Fort Myers figures