Kentucky American Water & LFUCG Sewer Tap Fees in Lexington (2026)
In Lexington, water and sewer come from two different providers. Kentucky American Water, a private utility regulated by the Kentucky Public Service Commission, supplies the water. The Lexington-Fayette Urban County Government (LFUCG) owns the sanitary sewers. For a new single-family home with a 5/8-inch water meter on a lot of 1/4 acre or less, the official charges come to $2,922.50: Kentucky American Water’s $1,223 tapping fee (tariff effective Dec. 16, 2025) plus LFUCG’s $1,699.50 sewer tap-on fee (Code Sec. 16-60, effective July 1, 2026). The caveat that matters most is lot size. LFUCG prices its sewer fee by the size of the lot, so the same house on a 1/2-acre lot pays $1,456.40 more for sewer. Lots in the 1996 Expansion Areas skip the tap-on fee and pay development exactions instead.
Lexington tap and connection charges at a glance
Kentucky American Water’s rows come from its PSC tariff (tapping-fee sheet effective December 16, 2025), which prices taps by meter size and lists only 5/8, 1 and 2 inches. LFUCG’s rows come from its Code of Ordinances: one sewer tap-on row per lot-size band, plus Capacity Assurance Program rows that developers usually pay once for a whole plan. Rows marked as not typical apply only in the situations their notes describe.
| Service | Category | Fee | Meter | Amount | Basis | Effective | Source | Verified |
|---|---|---|---|---|---|---|---|---|
| Sewer — Capacity | ||||||||
| Sewer | Capacity | Sewer Capacity Application Administrative Fee (Capacity Assurance Program) | — | $450 | flat fee | 2013-07-03 | Official source | 2026-09-24 Confirm with utility |
| Sewer — Connection | ||||||||
| Sewer | Connection | Sanitary Sewer Tap-On or Connection Fee (single-family, town home, duplex) Lot of 1/4 acre or less | — | $1,699.50 | per unit | 2026-07-01 | Official source | 2026-09-24 |
| Sewer | Connection | Sanitary Sewer Tap-On or Connection Fee (single-family, town home, duplex) Lot 1/4–1/2 acre | — | $3,155.90 | per unit | 2026-07-01 | Official source | 2026-09-24 |
| Sewer | Connection | Sanitary Sewer Tap-On or Connection Fee (single-family, town home, duplex) Lot 1/2–3/4 acre | — | $4,616.32 | per unit | 2026-07-01 | Official source | 2026-09-24 |
| Sewer | Connection | Sanitary Sewer Tap-On or Connection Fee (single-family, town home, duplex) Lot 3/4–1 acre | — | $6,315.81 | per unit | 2026-07-01 | Official source | 2026-09-24 |
| Sewer | Connection | Sanitary Sewer Tap-On or Connection Fee (single-family, town home, duplex) Lot over 1 acre | — | $8,015.29 | per unit | 2026-07-01 | Official source | 2026-09-24 |
| Sewer — Deposit | ||||||||
| Sewer | Deposit | Sewer Capacity Reservation Deposit | — | See formula | Percent | 2013-07-03 | Official source | 2026-09-24 |
| Water — Account Setup | ||||||||
| Water | Account Setup | New Account Set Up - Activation Fee | — | $28 | flat fee | 2025-12-16 | Official source | 2026-09-24 |
| Water — Inspection | ||||||||
| Water | Inspection | Inspection of Service Line | — | $25 | flat fee | 2025-12-16 | Official source | 2026-09-24 |
| Water — Main Extension | ||||||||
| Water | Main Extension | Water Main Extension (Rule 10) | — | See formula | formula | 2025-12-16 | Official source | 2026-09-24 |
| Water — Tap | ||||||||
| Water | Tap | Tapping (Connection) Fee | 1" | $2,174 | by meter size | 2025-12-16 | Official source | 2026-09-24 |
| Water | Tap | Tapping (Connection) Fee | 2" | $4,002 | by meter size | 2025-12-16 | Official source | 2026-09-24 |
| Water | Tap | Tapping (Connection) Fee | 5/8" | $1,223 | by meter size | 2025-12-16 | Official source | 2026-09-24 |
What a new Lexington house pays: worked example
Assumptions: one detached house, a 5/8-inch meter, a water main already in the street in front of the lot, and a lot outside the Expansion Areas. The sewer fee depends on lot size, so the table shows three common cases.
Published Lexington connection charges for one house, by lot size (sources: Kentucky American Water tariff, Sheet No. 32, LFUCG Code Sec. 16-60). Construction of the private lines is not included.
| Charge | A: Lot of 1/4 acre or less | B: 1/4 to 1/2 acre | C: 1/2 to 3/4 acre |
|---|---|---|---|
| Water tapping fee (5/8″) | $1,223.00 | $1,223.00 | $1,223.00 |
| LFUCG sewer tap-on fee | $1,699.50 | $3,155.90 | $4,616.32 |
| Published total | $2,922.50 | $4,378.90 | $5,839.32 |
Larger lots cost more. The ordinance sets $6,315.81 for 3/4 to 1 acre and $8,015.29 above 1 acre, which puts a 1-acre-plus lot at $9,238.29 with the water tap. A 1-inch meter raises the water tap to $2,174, which is $951 more than the 5/8-inch meter in every case. If the house replaces an older building on the same lot, Sec. 16-61 gives a credit for the earlier use against the sewer fee. Kentucky American Water also charges a $28 activation fee on every new account, including the first account at a new house. It is an account charge rather than a connection charge, so it is left out of the totals above.
In the Expansion Areas, Sec. 16-61.1 exempts lots that pay development exactions (under Article 23C of the zoning ordinance) from the sewer tap-on fee. We could not find a current published exaction schedule, so we give no figure here; ask LFUCG for the amount on a specific lot.
What is not included in Lexington fees
Kentucky American Water’s tapping fee covers the company service line from the main to your line. LFUCG’s tap-on fee is only a charge for the right to connect; the ordinance puts the connection itself at the owner’s expense. These costs are extra:
- Water service line from the meter to the house: $30 to $150 per foot, about $50 typical, installed including the trench (national estimate). Under Rule 9.1 the customer installs this line to a point Kentucky American Water approves.
- Sewer lateral (building sewer) from the house to the public sewer: $50 to $250 per foot, about $100 typical, installed including the trench (national estimate).
- A water main extension, if no main runs past the lot. See “How and when you pay” below.
- Plumbing permit and inspection. A complete water service application includes a plumbing inspection; the permit fee is not tracked here.
For example, 60 feet of water line at $50 and 60 feet of sewer lateral at $100 add about $9,000 in private work. These are national benchmark figures, not Lexington quotes. See water service line cost and sewer lateral cost, and model your own lot here:
Estimate utility connection costs
Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.
How and when Lexington fees are paid
- The water tap fee is due when you apply. The tariff requires the tapping fee on application. Services larger than 2 inches pay a cost-adjustable deposit instead and are billed at actual cost.
- Sewer comes first at the permit stage. Under LFUCG’s Capacity Assurance Program, which started July 3, 2013 under a federal consent decree, no tap permit or building permit is issued until the Division of Water Quality confirms there is sewer capacity. Since October 1, 2013, a building permit also needs written evidence that a sewer tap permit has been issued.
- Grandfathered lots skip the capacity application. Lots on a subdivision or development plan approved before July 3, 2013 do not need a Sewer Capacity Application. Other projects file one at the Tap-On Desk (125 Lisle Industrial Ave., Suite 180, 859-425-2400) with a $450 administrative fee. One application can cover every lot on a plan. LFUCG aims to answer within 10 calendar days, and projects without capacity can be waitlisted.
- Main extensions. Outside new subdivisions, Kentucky American Water extends a main free up to about three years of expected revenue from the new customers (never less than 50 feet of main per customer). You deposit any cost above that, and part of it can be refunded over 10 years as new customers connect. Subdivisions use separate extension deposit agreements.
Lexington vs. Louisville, Knoxville and Columbus
Louisville charges $1,825 in Louisville Water fees for a 3/4-inch service, but MSD has no flat sewer tap fee. It bills the construction cost plus $250, and developers pay its capacity charge. Knoxville‘s KUB publishes minimums of $1,000 for a water tap and $1,700 for a wastewater tap, or $2,700, close to Lexington’s small-lot total of $2,922.50. Columbus is higher at $5,780 for a 3/4-inch tap inside the city, mostly from capacity charges. Lexington’s total rises with lot size, so on a 1/2-to-3/4-acre lot it reaches $5,839.32, about the same as Columbus.
What could change in Lexington
LFUCG’s sewer tap-on fee is adjusted every July 1 by the consumer price index (Ord. No. 22-2015), so the amounts above apply from July 1, 2026, with new amounts expected July 1, 2027. The $450 Capacity Assurance Program fee dates from 2013; the ordinance makes it CPI-adjustable, but we found no adjusted amount published, so confirm it at the Tap-On Desk. Kentucky American Water’s tapping fees were set in PSC Case No. 2025-00122 (order dated December 16, 2025) and change only through a new PSC-approved tariff.
Electric line extensions by utilities regulated by the Kentucky Public Service Commission follow a statewide free-footage rule. See electric line extension free footage.
Lexington tap fee FAQ
How much does a water tap cost in Lexington, KY?
Kentucky American Water’s tariff sets a tapping fee of $1,223 for a 5/8-inch meter, $2,174 for 1 inch and $4,002 for 2 inches. Larger services are billed at actual cost. The fee is due when you apply, and the utility then installs the service line from the main to your line.
What is LFUCG’s sewer tap-on fee?
It is a one-time fee for the right to connect to the sewer system, based on lot size. From July 1, 2026 a single-family home, town home or duplex unit pays $1,699.50 on a lot of 1/4 acre or less, $3,155.90 from 1/4 to 1/2 acre, $4,616.32 from 1/2 to 3/4 acre, $6,315.81 from 3/4 to 1 acre and $8,015.29 above 1 acre.
Do I need a Sewer Capacity Application for a new house?
Only if the lot is not grandfathered. Lots on plans approved by the Planning Commission before July 3, 2013 already have a capacity allocation. Other projects apply at LFUCG’s Tap-On Desk, with a $450 administrative fee (the 2013 amount in the ordinance), and a building permit is not issued until the sewer tap permit is.
Are Expansion Area lots charged the sewer tap-on fee?
No. Sec. 16-61.1 exempts properties in the 1996 Expansion Areas that pay development exactions. Those exactions follow a separate schedule under the zoning ordinance, so the cost differs from the tap-on fee; ask LFUCG for the amount on a specific lot.
Who pays to extend a water main to my lot?
Kentucky American Water extends mains at no charge up to about three years of expected revenue from the new customers, and at least the cost of 50 feet of main per customer. You deposit any cost above that, and part of it is refunded over 10 years as new customers connect.
More on Lexington and nearby cities
Compare Lexington with Louisville, Knoxville, Nashville and Columbus, or see the full tap fees by city table. Related guides: tap fee vs. impact fee, sewer connection cost, water meter installation cost and the utility connection cost calculator.
Official documents behind the Lexington figures
- Rates, Charges, Rules and Regulations for Furnishing Water Service, P.S.C. KY No. 11 (Tapping Fees, Sheet No. 32; New Account Activation Fee, Sheet No. 41; Rules 9 and 10), Kentucky-American Water Company, on file with the Kentucky Public Service Commission. Checked Sep 24, 2026.
- Code of Ordinances, Chapter 16, Article VI, Secs. 16-60 to 16-61.1 (tap-on or connection fees), Lexington-Fayette Urban County Government. Checked Sep 24, 2026.
- Code of Ordinances, Chapter 16, Article XIII, Secs. 16-303 and 16-304 (Capacity Assurance Program), Lexington-Fayette Urban County Government. Checked Sep 24, 2026.
- Capacity Assurance Program, including its FAQ and Sewer Capacity Application (Rev. 11/6/2013), LFUCG Division of Water Quality. Checked Sep 24, 2026.
- National cost estimates: Utility Cost Guide benchmark methodology.