South Carolina’s water and sewer connection fees vary more by utility than by city. For a new single-family home, published one-time charges run from about $4,710 in the Myrtle Beach area (Grand Strand Water & Sewer Authority, a subdivision lot where the service stubs already reach the property) to $12,060 at Charleston Water System in 2026, rising to $14,045 on January 1, 2027, for a 3/4-inch meter with the utility providing both water and sewer. In between, the Town of Fort Mill’s capacity and activation fees for a 3/4-inch tap total $5,470, before the meter itself is billed separately at cost plus 10%, and Greenville’s in-city total for a 5/8-inch meter is $9,153 through September 30, 2026, stepping up to $10,543 once ReWa’s sewer new account fee rises on October 1, 2026. Our database covers Charleston, Fort Mill, Greenville and the Myrtle Beach/Horry County area (GSWSA) so far. Other South Carolina utilities are not yet collected, and we say so rather than guess.

Official fees in South Carolina

The table below lists every verified South Carolina fee row in our database, with utility, meter or tap size, effective date and a link to the source document. Terminology differs by utility more than in most states we cover. Charleston Water System and GSWSA both call their capacity charge an impact fee. The Town of Fort Mill and Greenville Water call theirs a capacity fee. ReWa, which treats Greenville’s wastewater, calls its capacity charge a new account fee, set by the size of the water meter Greenville Water installs. Layered on top are smaller flat charges for the physical work: Charleston’s and Fort Mill’s tap fees, GSWSA’s meter base and sewer connection inspection fees, and Greenville’s connection and contribution fees. Several of these schedules step up on a fixed date each year, so check the effective date column before you budget.

CityProviderWater typical new home*Sewer typical new home*
CharlestonCharleston Water System$5,120$200
Fort MillTown of Fort Mill Utilities Department$2,420$3,000
GreenvilleRenewable Water Resources (ReWa)$3,680$5,863
Horry County (Myrtle Beach area)Grand Strand Water & Sewer Authority (GSWSA)$1,855$2,735

* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.

City comparison

One-time water + sewer charges for one new single-family home under each utility’s own worked example (sources: Charleston Water System Tap & Impact Fees; Town of Fort Mill Fee Schedule FY 2025-26; Greenville Water 2026 Development Fees and ReWa New Account Fees; GSWSA Rates).

Utility Meter or tap Situation Total
Charleston Water System 3/4″ meter Utility installs water + sewer, 2026 fees $12,060
Charleston Water System 3/4″ meter Same, from Jan 1, 2027 $14,045
Town of Fort Mill 3/4″ tap Capacity + activation fees (meter billed separately) $5,470
Greenville Water + City + ReWa 5/8″ meter, 3/4″ tap In city, through Sep 30, 2026 $9,153
Greenville Water + City + ReWa 5/8″ meter, 3/4″ tap In city, Oct 1, 2026 to Sep 30, 2027 $10,543
GSWSA (Myrtle Beach area) 1 REU Subdivision lot, service stubs already in $4,710
GSWSA (Myrtle Beach area) 1 REU GSWSA makes the water and sewer taps $5,810

How the rows are built. Charleston: $4,620 water impact fee + $6,670 sewer impact fee (1 ERU) + $500 water tap fee + $200 sewer tap fee + $70 water and sewer account origination = $12,060 in 2026; swap in the January 1, 2027 impact fees ($5,115 and $8,160) for $14,045. Fort Mill: $2,420 water capacity/connection fee + $3,000 sewer capacity/connection fee + $50 account activation fee = $5,470; the meter set and meter purchase are each billed on top at cost plus 10%. Greenville: a $2,780 Greenville Water capacity fee (Type E) + $900 connection fee + $1,000 contribution fee = $4,680 for water, plus the City’s $363 residential sewer tap fee and ReWa’s new account fee, $4,110 through September 30, 2026 or $5,500 from October 1, 2026, for $9,153 or $10,543. GSWSA: $1,225 water impact fee + $2,735 sewer impact fee + $630 meter base fee + $80 sewer connection inspection fee + $40 new service installation fee = $4,710 on a subdivision lot where the developer already ran the service lines to the property line; if GSWSA has to make the taps itself, a $790 water tap and $1,020 sewer tap fee replace the meter base and inspection lines, for $5,810.

Timing, not just location, drives a lot of this. Three of the four schedules were mid-increase when we checked: Charleston’s impact fees step up every January 1, ReWa’s new account fee is scheduled to rise again on October 1, 2027 (to $6,947), and GSWSA raised its impact fees about 80% in 2026 without publishing an effective date. Fort Mill’s schedule was not mid-change, but its fiscal year ended September 30, 2026 and no FY2026-27 schedule was posted when we checked on September 25, 2026.

City pages with the full fee rows, payment timing and local caveats: Charleston Water System tap and impact fees, Fort Mill water and sewer capacity fees, Greenville Water and ReWa tap and capacity fees and GSWSA tap and impact fees, Myrtle Beach area.

What decides your number

South Carolina’s Development Impact Fee Act excludes tap and connection charges, meter installation and other physical-work costs from the legal definition of a “development impact fee” (S.C. Code § 6-1-920). That is why every utility on this page splits its bill into a capacity or impact charge plus separate tap, connection or meter fees.

Costs beyond the utility’s fees

For a full budget, add the private work between the utility’s connection and the house. These are national estimates, not South Carolina figures (methodology):

Worked example: a Myrtle Beach-area subdivision lot with 50 feet of water line and 50 feet of sewer lateral. GSWSA’s published fees are $4,710. Typical private work adds 50 × $50 = $2,500 (water line) + 50 × $100 = $5,000 (lateral), for a planning total near $12,210 before the plumbing permit and trenching. Run your own lot through the calculator:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

Frequently asked questions

How much are water and sewer tap fees in South Carolina?

It depends entirely on the utility. Published one-time charges for a new home run from about $4,710 in the Myrtle Beach area (GSWSA, subdivision lot with stubs already in) to $5,470 in Fort Mill, $9,153 to $10,543 in Greenville and $12,060 to $14,045 at Charleston Water System, depending on meter size and timing.

Why do Charleston’s tap fees keep changing?

Charleston Water System raises its water and sewer impact fees every January 1. The 3/4-inch water fee goes from $4,620 to $5,115 and the sewer fee from $6,670 to $8,160 per ERU on January 1, 2027, adding $1,985 to the same house.

Is a new home cheaper in the Myrtle Beach area than in Charleston?

Yes, by a wide margin on published figures. GSWSA’s $4,710 for a subdivision lot with the service stubs already in is well under half of Charleston Water System’s $12,060 for a 3/4-inch meter in 2026, even after GSWSA raised its impact fees about 80% in 2026.

Does the developer ever prepay these fees on a new subdivision lot?

Sometimes. In the GSWSA service area, prepaid impact fees stay assigned to the parcel, so a buyer on a lot where the developer already paid the $1,225 water and $2,735 sewer impact fees owes only about $750 in remaining meter, inspection and service fees.

Related pages

Other state hubs: North Carolina, Florida, Texas, Colorado and Arizona. Nearby cities: Charlotte, NC and Nashville, TN. Guides: tap fee vs. impact fee, cost to bring utilities to land, utility costs for new construction and tap fees by city.

Sources