Tulsa Water & Sewer Connection Fees (2026)

Last reviewed: By Utility Cost Guide editor

The City of Tulsa provides water and sewer inside the city, with the systems managed through the Tulsa Metropolitan Utility Authority. For a new single-family home with the standard 5/8 x 3/4-inch meter, the city’s published charges come to $703.64: a $528.14 water meter permit including the meter, a $155.50 sanitary sewer new tap permit and a $20 fee to open the utility account. Tulsa charges no water or sewer impact fee that we could find. The catch is that the city does not dig the taps itself. A licensed contractor does the work and charges for it separately, and since May 2025 the city code also requires an escrow deposit for inspection and testing days on each meter installation.

Official Tulsa fees in one table

The table lists every Tulsa row in our database with its source. The permit amounts come from Title 49 of the Tulsa Revised Ordinances, and the city publishes them as two one-page sheets: the Water Meter Fee schedule and the Sanitary Sewer Permit Fees, both effective August 5, 2024. Each permit total on those sheets adds three administrative charges to the base fee: a system development fee of $5.50 plus 8% of the permit fee, a $5 system maintenance fee and a $10 record retention fee. Rows marked as not typical, such as the per-day escrow fees and the off-septic permit, apply only in some cases.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Sewer — Permit
SewerPermitSanitary Sewer Permit, New Tap (with administrative fees)—$155.50flat fee2024-08-05Official source2026-09-24
SewerPermitSanitary Sewer Permit, Off-Septic (with administrative fees)—$155.50flat fee2024-08-05Official source2026-09-24
Water — Account Setup
WaterAccount SetupInitiate, reinstate, or transfer service—$20flat fee2026-10-01Official source2026-09-24
Water — Inspection
WaterInspectionField Inspection Fee, water meter installation (escrow)—$235per unit2025-05-21Official source2026-09-24
WaterInspectionTesting and Quality Assurance Fee, water meter installation (escrow)—$200per unit2025-05-21Official source2026-09-24
Water — Meter
WaterMeterMeter Fee, 1" displacement meter1"$317.79by meter size2024-08-05Official source2026-09-24
WaterMeterMeter Fee, 3/4" displacement meter3/4"$288.36by meter size2024-08-05Official source2026-09-24
WaterMeterMeter Fee, 5/8" x 3/4" displacement meter5/8"$254.92by meter size2024-08-05Official source2026-09-24
Water — Permit
WaterPermitWater Meter Permit, meters under 3 inches (with administrative fees)—$273.22flat fee2024-08-05Official source2026-09-24

Worked example for a single-family home in Tulsa

A water meter permit for a meter under 3 inches is $234 under Title 49, Section 1301. The city’s Water Meter Fee schedule (effective August 5, 2024) adds a $24.22 system development fee ($5.50 plus 8% of $234), $5 system maintenance and $10 record retention, for $273.22, and then the price of the City-furnished meter. The sewer side works the same way: the Sanitary Sewer Permit Fees sheet lists a New Tap permit at $125 plus $15.50, $5 and $10, or $155.50. Opening the account costs $20 under the city’s customer service fees (rate book effective October 1, 2026).

Published City of Tulsa charges for one new single-family home, by meter size (contractor’s work and escrow not included).

Meter Water permit with admin fees Meter Sewer new tap permit Account setup Total
5/8″ x 3/4″ displacement $273.22 $254.92 $155.50 $20.00 $703.64
3/4″ displacement $273.22 $288.36 $155.50 $20.00 $737.08
1″ displacement $273.22 $317.79 $155.50 $20.00 $766.51

The meter-plus-permit figures in the second and third columns match the schedule’s own totals: $528.14, $561.58 and $591.01. Which row applies depends on the meter size on the permit.

Then add the escrow. Section 1301 was amended by Ordinance 25572 on May 21, 2025 to require, before the permit is issued, a field inspection deposit of $235 and a testing and quality assurance deposit of $200 for each estimated day of construction on a water meter installation. The city bills or credits the difference when the work is done. If the city estimates one day, that is another $435, and the 5/8 x 3/4-inch case becomes $1,138.64 up front; two days would make it $1,573.64. The ordinance does not say how many days a typical residential meter takes, so ask Development Services for the estimate on your permit. The August 2024 fee sheet predates this change and does not show it.

What Tulsa’s fees don’t cover

In Tulsa the permit fee covers review and inspection only. Everything below is on top of it:

National figures are estimates from our benchmark set. The calculator below loads Tulsa’s official fees; add your contractors’ quotes to it:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

When you pay Tulsa connection fees

Water and sewer connection permits are issued by the Development Services Infrastructure Development division and applied for through the city’s Self Service Portal. The city says all fees must be paid before it processes the permit. The water permit application has to come from a licensed water meter contractor, and it asks whether the use is residential or commercial, the legal description of the property, and who the billing contact will be, owner or builder. Meters of 3 inches and larger need sealed engineering plans, which does not affect a normal house.

The meter itself is City-furnished, and its price is the city’s acquisition cost. The schedule warns that meter fees change whenever that cost changes, so the amount on your permit can differ from the sheet.

A home on septic that is connecting to a new city sewer line pays the same $155.50 Off-Septic permit instead of a New Tap permit. Plugging the old septic line is a separate $116.08 permit on the same sheet.

What could change in Tulsa

How Tulsa compares with Oklahoma City

Tulsa’s published connection charges are lower than those in Oklahoma City, which come to $1,283.28 for a two-bath home with a 5/8- or 3/4-inch meter. The difference is Oklahoma City’s $1,000 water system development charge and its bath-unit sewer charge; we found neither in Tulsa’s schedules, which use flat permit fees. Tulsa’s meter costs more ($254.92 against $48.28), though, and with one day of escrow Tulsa’s up-front payment ($1,138.64) comes close to Oklahoma City’s. In both cities the tap and service line are built by a licensed contractor and priced separately, so the contractor’s quote will usually be the biggest part of the bill.

Tulsa tap fee FAQ

How much does Tulsa charge to connect a new house to water and sewer?

For a 5/8 x 3/4-inch meter, the published city charges total $703.64: $528.14 for the water meter permit and meter, $155.50 for the sewer new tap permit and $20 to open the account. Since May 2025 the city code also requires a $235 inspection deposit and a $200 testing deposit for each estimated day of meter construction, settled after the work.

Does Tulsa have a water or sewer impact fee?

We found none. Tulsa’s “system development fee” is a small administrative add-on of $5.50 plus 8% of the permit fee, which is $24.22 on a water meter permit and $15.50 on a sewer tap permit, not a capacity charge like Oklahoma City’s $1,000 development charge.

Who installs the water tap and meter in Tulsa?

A water meter contractor with an annual IDP contract and a Class D water license, chosen from the city’s approved list. The contractor applies for the permit; its charge for the tap, meter setting and service line is separate from the city fees.

How much is a water meter in Tulsa?

The August 5, 2024 schedule lists $254.92 for a 5/8 x 3/4-inch meter, $288.36 for 3/4-inch and $317.79 for 1-inch, on top of the $273.22 permit with administrative fees. The city changes meter prices when its own cost changes.

What does it cost to switch from septic to city sewer in Tulsa?

The city’s Off-Septic permit is $155.50 and a Plug Septic permit is $116.08, both with administrative fees included. The plumbing contractor’s work on the new lateral and closing the tank is extra.

Related: water tap fees · sewer tap fees · tap fee vs. impact fee · water meter installation cost · Oklahoma City fees · Kansas City fees · utility connection cost calculator

Sources for Tulsa figures