Oklahoma City Water & Sewer Connection Fees (2026)

Last reviewed: By Utility Cost Guide editor

The City of Oklahoma City’s Utilities Department provides water and sewer at a typical address inside the city, and the development charges are paid to the Oklahoma City Water Utilities Trust. For a new single-family home with a 5/8-inch or 3/4-inch meter and two full bathrooms, the published city charges come to $1,283.28: a $1,000 water system development charge, a $48.28 meter, a $35 inspection, and a sewer system impact charge of $100 plus $50 for each of two equivalent bath units. The one local rule that changes the total is the sewer charge, which is counted by plumbing fixtures, so a house with more bathrooms pays more even with the same meter.

Oklahoma City connection fees at a glance

The table lists every Oklahoma City row in our database with its source. The development charges, inspection fee, calibration fee, service installation charges and account charge come from Chapter 60 of the Oklahoma City Municipal Code (the General Schedule of Fees), Title 55. The meter prices come from the Utilities Department’s Impact Fee Schedule on okc.gov; we did not find them in the Code, and the page gives no effective date. Rows marked as not typical, such as the $425 City-installed service and the $45 calibration fee, apply only in special cases.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Sewer — Impact
SewerImpactSewer system impact charge (per equivalent bath unit)—$50per unit—Official source2026-09-24
SewerImpactSewer system impact charge (sanitary sewer line connection)—$100flat fee—Official source2026-09-24
Water — Account Setup
WaterAccount SetupCustomer account origination charge—$25flat fee—Official source2026-09-24
Water — Connection
WaterConnectionService installation charge (City installs complete service), 1-inch, inside City1"$465by meter size—Official source2026-09-24
WaterConnectionService installation charge (City installs complete service), 3/4-inch, inside City3/4"$425by meter size—Official source2026-09-24
Water — Impact
WaterImpactWater System Development Charge1"$1,670by meter size2016-10-01Official source2026-09-24
WaterImpactWater System Development Charge3/4"$1,000by meter size2016-10-01Official source2026-09-24
WaterImpactWater System Development Charge5/8"$1,000by meter size2016-10-01Official source2026-09-24
Water — Inspection
WaterInspectionService line and meter inspection fee (regular hours)—$35flat fee—Official source2026-09-24
Water — Meter
WaterMeterMeter Fee1"$98.07by meter size—Official source2026-09-24
WaterMeterMeter Fee3/4"$48.28by meter size—Official source2026-09-24
WaterMeterMeter Fee5/8"$48.28by meter size—Official source2026-09-24
Water — Other
WaterOtherMeter calibration fee—$45flat fee—Official source2026-09-24

Worked example for a single-family home in Oklahoma City

The water system development charge is a base rate times a meter multiplier. Municipal Code Section 60-55-30 sets the rate at $1,000 for permits issued from October 1, 2016 on, and Section 60-55-17 (last amended November 18, 2025) gives a multiplier of 1.00 for 5/8-inch and 3/4-inch meters and 1.67 for a 1-inch meter, which is $1,670. The meter prices and the $35 inspection are listed together on the city’s Builders & Contractors impact fee schedule.

The sewer charge under Section 60-55-31 is $100 per sanitary sewer connection plus $50 per equivalent bath unit “or portion thereof.” The Code’s Table I counts a toilet as 1/2 unit, a sink or lavatory as 1/8 and a tub, shower or spa as 1/4. A full bathroom with a toilet, lavatory and tub is 7/8 of a unit. Two full baths plus a kitchen sink add up to 1-7/8 units, which rounds up to 2 units ($100). Add a half bath (toilet and lavatory, 5/8) and the house reaches 2-1/2, which rounds up to 3 units ($150). Your plumber’s fixture count on the permit decides this, so check it before you budget.

Published City of Oklahoma City charges for one new single-family home (contractor’s work not included).

Case Water development charge Meter Inspection Sewer connection Bath units Total
5/8″ or 3/4″ meter, 2 full baths (2 units) $1,000.00 $48.28 $35.00 $100.00 $100.00 $1,283.28
5/8″ or 3/4″ meter, 2-1/2 baths (3 units) $1,000.00 $48.28 $35.00 $100.00 $150.00 $1,333.28
1″ meter, 3-1/2 baths (4 units) $1,670.00 $98.07 $35.00 $100.00 $200.00 $2,103.07

The fourth case counts 3-1/2 baths as three full baths (2-5/8 units) plus a half bath (5/8) plus a kitchen sink (1/8), or 3-3/8 units, rounded up to 4. Opening the water account adds $25 (Section 60-55-37), plus any security deposit the Utilities Director requires by policy. Paying the development or sewer charges by card adds a 2.7% service fee.

Section 60-55-29 charges $35 per inspection “of each service line and each meter installation.” The city’s schedule lists one $35 inspection per meter, which we used. If the city inspects the service line and the meter separately, expect a second $35 ($1,318.28 in the first case); ask the New Meter Sales Desk when you buy the meter.

What Oklahoma City’s fees don’t cover

For new meter installations, the city’s Builders & Contractors page sends owners to a list of approved contractors, pre-qualified at Class D (Water Pipeline) or higher, and says each contractor sets its own installation price. That price, and everything else below, is on top of the city’s charges:

National figures are estimates from our benchmark set. The calculator below loads Oklahoma City’s official fees; add your contractor’s quote to it:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

Paying Oklahoma City fees: timing and process

Section 55-69 of the Code requires anyone connecting to the water or sewer system to apply, get the permits and pay the system development charges before connecting. The water charge is due when the plumbing permit is applied for or before the water connection is made, whichever comes first. Both charges are paid to the Oklahoma City Water Utilities Trust, and the Code limits their use to new construction and improvements to the water and sewer systems.

To start, the owner or contractor fills out the city’s New Meter and Water Service Installation Form and emails it to buildingpermitapplication@okc.gov. Meter sales go through the New Meter Sales Desk at (405) 297-2953, and meter scheduling and inspections through newserviceinspections@okc.gov. Meters of 1-1/2 inches and larger are bought from a plumbing wholesale house instead of the City and carry a calibration fee.

When a licensed plumbing contractor installs the service, Section 55-75(b) says the City’s charge is the meter, the inspection and the meter setting charge, plus any work the City does.

The water development charge follows meter size, not house size. A 1-inch meter raises the charge to $1,670 and the meter to $98.07, so confirm the size with your plumber before you apply.

Oklahoma City fee changes to watch

How Oklahoma City compares

Oklahoma City’s published connection charges are low next to the two cities below, because its main fee, the water development charge, has stayed at $1,000 for a standard meter. In Kansas City, Missouri, KC Water charges $858.00 for a 3/4-inch tap on an iron main with meter, permit and sewer inspection, and we found no development charge there. In Fort Worth, water and wastewater impact fees alone are $5,504 for a 5/8 x 3/4-inch meter permitted through September 30, 2026 and $5,828 from October 1, 2026, more than four times Oklahoma City’s $1,283.28 total.

Oklahoma City tap fee FAQ

How much does Oklahoma City charge to connect a new house to water and sewer?

For a 5/8-inch or 3/4-inch meter and two full baths, the published charges total $1,283.28: $1,000 water system development charge, $48.28 meter, $35 inspection and a $200 sewer system impact charge ($100 plus two bath units at $50). A third bath unit adds $50.

Does Oklahoma City have a water impact fee?

Yes. The city calls it the water system development charge and lists it on its web page as an impact fee. It is $1,000 for a 5/8-inch or 3/4-inch meter and $1,670 for a 1-inch meter, under Municipal Code Sections 60-55-17 and 60-55-30.

How is the sewer connection charge calculated?

It is $100 per connection plus $50 per equivalent bath unit, with partial units rounded up. A toilet counts 1/2 unit, a sink or lavatory 1/8 and a tub, shower or spa 1/4, so a full bathroom is 7/8 of a unit.

Who installs the water meter in Oklahoma City?

The city directs new meter installations to its list of approved contractors, pre-qualified at Class D (Water Pipeline) or higher, and each contractor sets its own price. The Code also lists a $425 charge when the City installs a complete 3/4-inch service itself inside city limits ($565 outside).

When are the Oklahoma City development charges paid?

Before connecting. The water charge is due when the plumbing permit is applied for or before the water connection, whichever comes first, and both charges are paid to the Oklahoma City Water Utilities Trust.

The other large Oklahoma city we track is covered in Tulsa’s water and sewer connection fees.

Related: water tap fees · sewer tap fees · tap fee vs. impact fee · water meter installation cost · Kansas City fees · Fort Worth fees · utility connection cost calculator

Sources for Oklahoma City figures