Houston Water & Wastewater Impact Fees (2026)

Last reviewed: By Utility Cost Guide research team

Inside the City of Houston, water and wastewater come from Houston Public Works (Houston Water), and the connection charge that matters is the impact fee, priced per service unit. The city’s fee schedule, dated “as of 07/01/2026,” lists $2,553.11 for water and $1,830.24 for wastewater per service unit, and one service unit is one typical single-family home, so a new house owes $4,383.35 in impact fees and about $4,572 once the published permit and inspection items are added. The caveat is timing: Houston re-indexes these fees every July 1, and a city page suggests the $2,553.11 figure applied to applications before June 30, 2026, so the current rate may be higher. Confirm with Impact Fee Administration before you rely on it.

Official fees at a glance

The table shows every Houston row in our database with its source. The two impact-fee rows are marked for review because of the date conflict described above; the meter inspection and sewer permit rows are verified. Houston’s schedule is a citywide list of every department’s fees, so the connection-related lines are scattered: impact fees sit under Houston Public Works, the meter inspection under City Code Section 47-18(c), and the sewer connection line under the plumbing section of the building code.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Sewer — Impact
SewerImpactWastewater Impact Fee - fee per service unit, collected$1,830.24per equivalent residential unit2026-07-01Official source2026-09-24 Needs review
Sewer — Permit
SewerPermitBuilding Code - Plumbing: Sewer Connection, each$53.71flat fee2026-01-01Official source2026-09-24
SewerPermitSewer Tap Permit Fee$34.50flat fee2026-01-01Official source2026-09-24
Water — Impact
WaterImpactWater Impact Fee - fee per service unit, collected$2,553.11per equivalent residential unit2026-07-01Official source2026-09-24 Needs review
Water — Inspection
WaterInspectionWater meter inspection of a 2-inch or smaller meter$100.71flat fee2026-01-01Official source2026-09-24

Worked example: a new single-family home

Assumptions: one detached house, one service unit, water meter 2 inches or smaller, water and wastewater both from the City of Houston, figures from the City of Houston fee schedule (Houston Public Works).

Published City of Houston charges for one single-family connection. Impact-fee rows need review (see “Changes to watch”).

Line item Basis Amount
Water impact fee $2,553.11 × 1 service unit $2,553.11
Wastewater impact fee $1,830.24 × 1 service unit $1,830.24
Water meter inspection (2″ or smaller) flat $100.71
Sewer tap permit flat $34.50
Plumbing permit line: sewer connection, each flat, on top of the base plumbing permit $53.71
Subtotal $4,572.27
Administrative fee, where applicable flat $33.56
Total with administrative fee $4,605.83

The impact fees are $4,383.35 of the $4,572.27 subtotal, about 96 percent. Because Houston indexes them to the Producer Price Index each July 1 (City Code Sections 47-316(b) and 47-384(b)), the useful sensitivity is simple: every 1 percent change in the combined rate moves the bill by about $43.83. If the July 2026 adjustment raised both fees by 3 percent, for example, the impact fees would be $4,383.35 × 1.03 = $4,514.85. That is an illustration of the arithmetic, not a published rate.

Houston’s figures are low next to other large Texas cities. For comparison, San Antonio’s SAWS charges $7,343 to $11,528 in impact fees for a 5/8-inch meter, and Austin Water charges $7,700 on a post-2023 plat. What Houston’s schedule does not show is the price of the physical tap, which is where the rest of the cost sits.

What these fees don’t include

We did not find a published City of Houston charge for making the water tap or setting the meter on a new single-family service. That is a gap in what the city publishes, not evidence that the work is free. Ask the permitting center who builds the tap for your lot and at what price. Beyond that, the private work is yours:

National figures are estimates from our benchmark set. The calculator lets you add them to Houston’s official fees:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

How and when you pay

Houston ties impact fees to capacity. The wastewater fee is linked to a Wastewater Capacity Reservation letter, which carries its own fees; we did not find those amounts in the schedule we checked. Connection to the public sewer is required when a property is within 300 feet of a City sewer main (City Code Sections 47-11 and 47-12), which is also what triggers the $34.50 sewer tap permit.

The city’s Impact Fee Administration office handles the impact-fee side. Its website at houstonpermittingcenter.org did not load for us when we checked, so the figures here come from the citywide fee schedule. The Houston Public Works impact fee memo gives background on how the fees are set but is not a current rate sheet.

Houston’s water and sewer fees apply only inside the City of Houston’s service area. A Houston mailing address does not guarantee City service; parcels served by a municipal utility district (MUD) or another provider pay that provider’s charges. Confirm your provider before using these numbers.

Changes to watch

Houston impact fee FAQ

What is Houston’s water and wastewater impact fee per service unit?

The city fee schedule dated July 1, 2026 lists $2,553.11 for water and $1,830.24 for wastewater per service unit, $4,383.35 combined. A city page suggests that rate applied before June 30, 2026, so confirm whether the July indexing raised it.

What is a service unit in Houston?

A service unit is the demand of one typical single-family residence. A single-family house is charged one service unit for water and one for wastewater.

Do I have to connect to Houston’s sewer?

If the property is within 300 feet of a City sewer main, connection is required under City Code Sections 47-11 and 47-12. The sewer tap permit is $34.50, plus a $53.71 sewer-connection line on the plumbing permit.

Why do Houston impact fees change every year?

City Code ties them to the Producer Price Index and adjusts them each July 1. Budget for a small increase if your application falls after that date.

I live in a MUD. Do these fees apply?

Not if your water and sewer come from a municipal utility district or another provider. These figures are for City of Houston customers only; a MUD sets its own charges.

Related: Texas utility connection costs by city · San Antonio (SAWS) fees · Austin Water fees · tap fee vs. impact fee · sewer connection cost · water meter installation cost · utility connection cost calculator

Sources