In Des Moines, water comes from Des Moines Water Works (DMWW) and the sanitary sewer belongs to the City of Des Moines, whose Permit and Development Center issues the permit for the new sewer and water service lines. For a new single-family house inside the city, the published 2026 charges come to $2,037.25: DMWW’s $1,500 system development fee and $460 tap charge for a 1-inch tap, plus the city’s $77.25 permit for installing the sewer and water services. DMWW sets the meter at no charge. The caveat that matters most is location. The same 1-inch service costs $3,600 in system development fees in DMWW’s outlying service areas, and a lot inside one of the city’s sewer benefited districts can owe a per-acre sewer connection fee on top.

Official Des Moines fees in one table

DMWW’s figures come from its Schedule of Charges (Rules and Regulations Section 511), effective January 1, 2026. DMWW prices by tap size, not meter size, and its smallest tap is 1 inch, so a house with a 5/8-inch meter still pays the 1-inch rows. Rows marked not typical apply only to larger services, other service areas or particular districts.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
General — Permit
GeneralPermitPlumbing permit for plumbing installations associated with the construction of new dwellings—$206flat fee2026-01-01Official source2026-09-25
Sewer — Connection
SewerConnectionConnection fee, Southeast Ridge Area Trunk Sanitary Sewer System Benefited District (Sec. 118-215)—$3,297.71formula—Official source2026-09-25 Confirm with utility
SewerConnectionSewer connection fee for connections from outside the city (Sec. 118-204(5))—See formulaformula—Official source2026-09-25 Confirm with utility
Sewer — Permit
SewerPermitPlumbing permit for installation of sewer and water services only for new dwellings—$77.25flat fee2026-01-01Official source2026-09-25
Water — Impact
WaterImpactSystem Development Fee, All Other Service Areas (outside City of Des Moines), 1-inch metered connection
Other DMWW service areas (outside city)
1"$3,600by meter size2026-01-01Official source2026-09-25
WaterImpactSystem Development Fee, Des Moines, 1-inch metered connection
Inside City of Des Moines
1"$1,500by meter size2026-01-01Official source2026-09-25
WaterImpactSystem Development Fee, Des Moines, 2-inch metered connection2"$3,750by meter size2026-01-01Official source2026-09-25
Water — Tap
WaterTapUniform Tap Charge, 1-inch tap (2-inch through 16-inch main)
1-inch tap
1"$460by meter size2026-01-01Official source2026-09-25
WaterTapUniform Tap Charge, 2-inch tap (4-inch through 8-inch main)
2-inch tap
2"$1,675by meter size2026-01-01Official source2026-09-25

Worked example: a new home in Des Moines

Assume a new house on a lot inside the Des Moines city limits that fronts a DMWW main between 2 and 16 inches in diameter, a 1-inch service with a 5/8-inch or 3/4-inch meter, and a sewer connection to a city sewer outside any benefited district. The system development fee is Table 511.6 and the tap charge is Table 511.7 of DMWW’s 2026 Schedule of Charges. The permit is from the city’s Permit and Development Center fee schedule, new fees effective 1-1-26.

Published DMWW and City of Des Moines charges for one new home (contractor’s work not included).

Case System development fee Tap charge City sewer/water service permit Total
Inside Des Moines, 1-inch tap $1,500.00 $460.00 $77.25 $2,037.25
Inside Des Moines, 2-inch tap on a 6- or 8-inch main $3,750.00 $1,675.00 $77.25 $5,502.25
DMWW “all other service areas,” 1-inch tap (water only) $3,600.00 $460.00 not a Des Moines permit $4,060.00

The third row, for comparison, covers areas such as unincorporated Polk County.

The city also charges $206 for the whole-house plumbing permit on a new dwelling. That is a building-permit item, so we leave it out. The schedule does not say whether it also covers the service lines. If it does, the $77.25 services-only permit would not be charged on top, and the published utility charges for the first row would be $1,960. Ask the Permit and Development Center which applies.

If your lot is in a new subdivision, the system development fee may already be paid. DMWW charges subdivision fees on the number and size of service stubs installed, so a developer who stubbed each lot has already paid the fee for those stubs. Ask DMWW whether your stub is paid before you budget $1,500.

What is not included in Des Moines fees

The biggest costs are private work by a licensed plumbing contractor:

National figures are estimates from our benchmark set. Put your contractor’s quote into the calculator, which loads Des Moines’ official fees:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

When you pay Des Moines connection fees

The contractor first gets the city permits (right-of-way and plumbing) and gives DMWW the permit numbers. Under Rule 503.1.5, DMWW will not approve a water service application until the system development fee, tap charge and anything else owed have been paid. DMWW makes every tap itself on 48 hours’ notice and bills the plumbing contractor who signs for it; that contractor must hold an Iowa plumbing license and post a $20,000 annual bond with DMWW. DMWW sets the meter free but charges $40 if the meter setting is incomplete when the crew arrives.

Sewer connections need a city permit. Inside a benefited district created under Municipal Code Sec. 118-208, the connection application must be approved, the per-acre district fee paid and any connection structures the city engineer requires built, in addition to the plumbing permit.

What could change in Des Moines

How Des Moines compares with Omaha and Kansas City

A standard new home in Des Moines pays $2,037.25 in published charges, between Kansas City’s $858 with KC Water and Omaha’s $3,155.25 with M.U.D. and the city. Des Moines’ $1,500 system development fee is smaller than M.U.D.’s $2,112 impact fee; Kansas City has no such fee in the documents we read. Des Moines’ $460 tap sits between Omaha’s $597 and KC Water’s $303. The meter is where Des Moines saves most: DMWW sets it free, while M.U.D. charges $393 and KC Water $239.50 plus a $73.50 set fee.

Des Moines tap fee FAQ

How much does it cost to connect a new house to water and sewer in Des Moines?

Inside the city, DMWW charges a $1,500 system development fee and a $460 tap charge for a 1-inch service in 2026, and the city charges $77.25 for the sewer and water services permit. That is $2,037.25 in published charges before the contractor’s digging and pipe, which usually cost more.

What is the DMWW system development fee?

It is a one-time charge on every new water service that helps pay for treatment, pumping, storage and distribution capacity for new customers. It is based on tap size: $1,500 for a 1-inch tap and $3,750 for a 2-inch tap inside Des Moines in 2026. Outlying service areas pay more, for example $3,600 for 1 inch in the “all other service areas” group.

Can I get a smaller tap to lower the fees?

No. DMWW’s minimum tap is 1 inch and new residential service lines must be at least 1 inch inside diameter. The meter can still be 5/8 inch; DMWW sizes meters up to 1-1/2 inches from the expected flow.

Do I pay for the water meter?

Not for a normal installation; DMWW installs meters without charge. The $143 listed for a 5/8-inch meter sits in the Schedule of Charges’ meters section, which covers damaged or lost meters.

Is there a sewer connection fee in Des Moines?

There is no general per-home sewer connection fee in the documents we read, only the $77.25 permit. Lots inside a benefited district pay a per-acre connection fee set by that district’s ordinance. Properties outside the city that are allowed to connect pay a formula fee of $0.015 per square foot of lot plus $7.76 per front foot where no trunk-sewer fee is set.

Does the Wastewater Reclamation Authority charge a connection fee?

We found no WRA connection or capacity charge for a new home in the city and DMWW documents we read or in a search of WRA’s website. WRA treats Des Moines’ wastewater and says it is funded through sewer fees paid by its member communities, which reach homeowners through city sewer bills.