Minneapolis Water & Sewer Connection Fees (2026)

Last reviewed: By Utility Cost Guide editor

In Minneapolis, the City’s Public Works department runs the water system and the local sewers, and the Metropolitan Council treats the wastewater. For a new single-family home with water and sewer services of 75 feet or less in the street, the published charges come to $2,805: a $160 water utility connections permit, a $160 sewer utility connections permit and the Metropolitan Council’s $2,485 Sewer Availability Charge (SAC). The SAC accounts for almost 90% of that total, and the City collects it during the construction permit process, not when the plumber taps the main. The $2,805 does not include the City’s water tap charge or its meter set charge. The City Code says a fee is charged for tapping a water main, and a new home also needs a meter set permit, but the City does not publish either amount online. Both are extra, so ask Utility Connections for them before you budget.

Minneapolis tap and connection charges at a glance

The table lists every Minneapolis row in our database with its source. The two permits come from the Public Works utility connections permit fee schedule. Each costs $160 for up to 75 feet of work, plus $1.40 for each foot beyond that. The water permit and the sewer permit are separate, so a new house needs both. The SAC is a regional charge per SAC unit, and the Metropolitan Council’s 2026 and 2027 rate table sets one unit at $2,485, with a single-family home counted as one unit. The Xcel Energy rows are electric charges that apply only in some cases: extra service footage, or underground work done in winter. They are listed under other published fees.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Electric — Other
ElectricOtherWinter Construction Charge - service or distribution extension—$8.90per linear foot2024-01-01Official source2026-09-24
ElectricOtherWinter Construction Charge - thawing—$640per unit2024-01-01Official source2026-09-24
Electric — Service Line
ElectricService LineResidential service lateral Excess Footage Charge—$7.90per linear foot2012-09-01Official source2026-09-24
Sewer — Capacity
SewerCapacitySewer Availability Charge (SAC)—$2,485per equivalent residential unit2026-01-01Official source2026-09-24
Sewer — Permit
SewerPermitUtility Connections Permit - Sewer infrastructure (sewer tap permit)—$160formula—Official source2026-09-24
Water — Permit
WaterPermitUtility Connections Permit - Water infrastructure (water tap permit)—$160formula—Official source2026-09-24

What a new Minneapolis house pays: worked example

Assume a new house on an existing Minneapolis street with a City water main and sanitary sewer in front, one 3/4-inch or 1-inch water service and one sewer lateral. What changes the total is how many feet of each line the permit covers.

Published City of Minneapolis and Metropolitan Council charges for one new single-family home. The City’s unpublished water tap and meter set charges are extra and not included, and neither is the plumber’s work.

Case Water permit Sewer permit Met Council SAC Total
Both services 75 ft or less $160.00 $160.00 $2,485.00 $2,805.00
Both services 90 ft $181.00 $181.00 $2,485.00 $2,847.00
Replacing both lines at an existing home (75 ft or less) $160.00 $160.00 not charged $320.00

The 90-foot case works out as $160 + (15 × $1.40) = $181 per permit. The replacement case has no SAC because the charge applies when a property first connects to the regional system, and again only when a property’s use changes in a way that puts more demand on the system. According to the City’s SAC page, the Metropolitan Council bills the City and the City passes the charge on to the owner during the permit process.

Once the water is on, the monthly bill includes fixed charges based on meter size. For 2026 they are $11.75 for water and $9.30 for sewer on a 5/8-inch meter, and $17.10 and $13.95 on a 3/4-inch meter, according to the City’s utility rates page. These are ongoing charges and not part of the connection cost.

What Minneapolis’s fees don’t cover

The published City charges cover the permits. The regional charge covers sewer capacity. The larger costs are private work:

National figures are estimates from our benchmark set. Enter your contractor’s quote in the calculator, which loads Minneapolis’s official fees:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

Paying Minneapolis fees: timing and process

A licensed plumber pulls the permits. The City’s utility connections application covers water tap, meter set, sewer tap, utility and excavation permits in one form, which is submitted to Public Works Utility Connections (612-673-2451). A new water tap also requires a customer billing account to be set up. Under City Code Chapter 509, the water division grants the permit to tap a main to a licensed plumber.

The SAC is usually paid during the construction permit process. Businesses can spread SAC payments over several years through a deferral program, but the City’s page describes it for businesses, not homeowners.

The owner pays for the whole connection. Since Ordinance 2025-014 (February 2025), City Code sections 507.20 and 507.40 make the property owner responsible for the cost and maintenance of the connection all the way out to the water or sewer main, wherever the curb stop sits. Get a quote that includes the work in the street.

Starting water service at an address is free unless the water was shut off. In that case the City charges $90 to turn it back on.

Upcoming changes in Minneapolis

Minneapolis connection fee FAQ

How much does it cost to connect a new house to water and sewer in Minneapolis?

The published charges total $2,805 when both services are 75 feet or less: two $160 utility connections permits and the $2,485 Metropolitan Council SAC. The City’s water tap and meter set charges are not published online and are extra. The plumber’s excavation and pipe are separate and usually cost more than the fees.

What is SAC in Minneapolis?

The Sewer Availability Charge is a one-time regional fee from the Metropolitan Council for capacity in the regional wastewater system. One single-family home is one SAC unit, which costs $2,485 in 2026 and 2027. The City collects it during the construction permit process.

Do I pay SAC if I’m replacing my sewer line?

Not for a straight replacement. SAC applies when a property first connects, and again only if its use changes in a way that puts more demand on the system. Replacing the lateral at an existing house needs the $160 sewer permit, plus $1.40 per foot beyond 75 feet.

How is the Minneapolis utility connections permit priced?

Water and sewer permits are each $160 for up to 75 feet, plus $1.40 per foot beyond that. A 100-foot water service would be $160 + (25 × $1.40) = $195.

Who is responsible for the water line between the main and my house?

The property owner. City Code sections 507.20 and 507.40, as amended in February 2025, make the owner responsible for the cost and maintenance of the connection out to the main, whatever the location of the curb stop.

Does Xcel Energy charge to connect electric service to a new house?

Xcel extends up to 100 feet of residential service lateral to a location it designates at no charge. Extra footage, or a location the owner prefers, costs $7.90 per circuit foot. Underground work in winter can add $8.90 per trench foot and $640 per frost burner.

For another Plains utility, see Omaha M.U.D. water tap and impact fees.

Related: sewer tap fees · water tap fees · tap fee vs. impact fee · water meter installation cost · Kansas City fees · Columbus fees · Denver fees · utility connection cost calculator

Sources for Minneapolis figures