St. Louis Water & MSD Sewer Tap Fees (2026)

Last reviewed: By Utility Cost Guide editor

Two separate agencies serve a typical St. Louis City address: the City of St. Louis Water Division for water, and the Metropolitan St. Louis Sewer District (MSD) for sewer. For a new single-family home connecting to an already-adjacent public sewer, MSD’s published charges are $1,201.00 (a $1,126 connection fee plus a $75 connection permit), rising to $1,501.00 if MSD has to cut a new tap into the main because no wye already exists there. Add the Water Division’s $50.00 turn-on charge and the published city/district total runs $1,251.00 to $1,551.00. The important catch: the Water Division’s own rules say the price of the water tap itself is fixed but not published anywhere online, so your real total will be higher once that number is added.

St. Louis tap and connection charges at a glance

The table below lists every St. Louis City row in our database, each with its source. Two are current 2026 Water Division service charges; the rest are MSD’s connection, permit and plan-review fees, which MSD’s website still shows as effective February 1, 2018 under MSD Ordinance No. 14854 — we found no newer connection-fee ordinance, so those rows carry a “Confirm with utility” flag rather than being presented as freshly set. Rows marked as not paid by a typical home (the fire-protection charge, the metered-account deposit, MSD’s construction-permit and per-foot sewer-extension fees) are real published charges that only apply in specific situations, not to an ordinary infill connection.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Sewer — Connection
SewerConnectionSewer Connection Fee — Single Family Residence—$1,126flat fee2018-02-01Official source2026-09-30
Sewer — Main Extension
SewerMain ExtensionSewer Construction Inspection Fee — Sanitary & Combined Sewers—See formulaper linear foot2018-02-01Official source2026-09-25 Confirm with utility
Sewer — Other
SewerOtherPump Station Review/Inspection Fee—$4,000per unit2018-02-01Official source2026-09-30
Sewer — Permit
SewerPermitConnection Permit—$75flat fee2018-02-01Official source2026-09-30
SewerPermitConstruction Permit—$195flat fee2018-02-01Official source2026-09-30
Sewer — Plan Review
SewerPlan ReviewPlan Review — Submittal Charge—$450flat fee2018-02-01Official source2026-09-30
SewerPlan ReviewPlan Review Fee — Subdivisions, Commercial Projects, Single Lots, Parking Lots—See formulaformula2018-02-01Official source2026-09-25 Confirm with utility
Sewer — Tap
SewerTapTap Fee (machine tap into existing sewer main)—$300flat fee2018-02-01Official source2026-09-30
Stormwater — Main Extension
StormwaterMain ExtensionSewer Construction Inspection Fee — Storm Sewers—See formulaper linear foot2018-02-01Official source2026-09-25 Confirm with utility
Water — Account Setup
WaterAccount SetupTurn-On Charge (New Flat Rate or Meter Account)—$50flat fee2026-07-01Official source2026-09-25
Water — Connection
WaterConnectionPrivate Fire Protection Connection Service Charge—$297flat fee2026-07-01Official source2026-09-25
Water — Deposit
WaterDepositMinimum Initial Deposit — New Metered Account (1-inch small service connection)1"$50flat fee2010-11-01Official source2026-09-30

Worked example for a single-family home in St. Louis

Assume a new house on a street that already has an MSD sewer main and a City of St. Louis water main in front of it, with a standard domestic water service and a new sewer lateral to the public main. MSD states the residential connection fee and permit fee directly in its FAQ on connecting a house to the public sewer, and the same figures appear in its Connection Fees and Development Review Fees schedules. The Water Division’s turn-on charge is from its 2026 Water Rates page.

Published charges for one new single-family home connecting to existing mains (plumber’s and drain layer’s own work not included).

Case MSD connection fee MSD connection permit MSD tap fee Water turn-on charge Total
Existing wye already on the main (no new tap) $1,126.00 $75.00 $0.00 $50.00 $1,251.00
No existing wye (MSD machine-taps the main) $1,126.00 $75.00 $300.00 $50.00 $1,551.00

MSD’s FAQ is explicit that the $300 figure “may be required if there is no existing wye on the public sewer at the location of the connection” — so which case applies depends on whether an earlier subdivision or builder already stubbed a wye for that lot. Your licensed drain layer or MSD’s Engineering Department (314-768-6272) can tell you which case fits before you apply for the permit.

The water side is where this page has to stop short: the Water Division’s own Policies and Regulations for Small Service Connections (November 2025) says at Section 5.0 that “the installation cost for taps are fixed and are available from the Tap Application Counter” — a real price exists but isn’t published. Call Distribution (314-633-9029) or visit the counter at 4600 McRee Ave. before you budget a final total.

What is not included in St. Louis fees

MSD’s and the Water Division’s charges cover permits, inspection and (for sewer) the physical tap MSD’s crew makes into its own main. Everything else is private work your licensed plumber and drain layer price separately:

National figures are estimates from our benchmark set. Put your plumber’s and drain layer’s quotes into the calculator, which loads St. Louis’s official fees:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

When you pay St. Louis connection fees

On the sewer side, only a licensed master drain layer, certified by the Board of Examiners of Plumbers and Drainlayers of St. Louis City or St. Louis County, can apply for MSD’s construction and connection permits, after posting a cash or corporate performance bond of at least $10,000 with MSD. In-person payments can be check or cash; online card payments carry a 2.5% processing fee.

On the water side, a plumbing contractor applies for the tap at the Tap Application Counter — small taps (1″–3″) through Distribution, large taps (6″ and up, or cast-/ductile-iron) through the Estimator — and pays the fixed, unpublished tap-installation cost before the Water Division schedules the work. The turn-on charge is paid separately to open the account, flat-rate or metered.

Most residential water accounts in the City of St. Louis are billed on a flat rate — by room, water closet, bath/shower and sprinkling-frontage count — rather than by meter. Only commercial buildings, buildings with seven or more dwelling units, and homeowners who specifically opt in are metered. A metered account also carries its own minimum deposit (see the fee table), which most new single-family owners here never pay.

What could change in St. Louis

St. Louis tap fee FAQ

How much does it cost to connect a new home to water and sewer in St. Louis?

MSD’s published sewer charges for a single-family home are $1,201.00 with an existing wye or $1,501.00 if MSD has to cut a new tap, and the Water Division charges $50.00 to turn on the account. That’s $1,251.00–$1,551.00 in published city/district charges — not counting the Water Division’s own tap-installation price, which isn’t published online.

Does St. Louis charge a water impact fee or system development charge?

We found no water impact fee in the Water Division’s published rates or connection regulations. The only water charges we could verify are the $50 turn-on charge, a $297 private fire-protection connection charge, and an old $50 metered-account deposit. The dollar cost of the physical water tap is fixed but not published; it’s available only from the Tap Application Counter.

What is MSD’s sewer connection fee for a single-family home?

$1,126.00, plus a $75.00 connection permit, per MSD’s own FAQ and its Connection Fees schedule. An additional $300.00 tap fee applies only if there’s no existing wye already on the public sewer at the connection point.

Why doesn’t St. Louis publish its water tap fee?

The Water Division’s Policies and Regulations for Small Service Connections (November 2025) states the installation cost for taps is fixed but available only from the Tap Application Counter (314-633-9029), not published on the website or in that document. We record only what we can verify, so no dollar figure appears here for that charge.

Is St. Louis City water billed by meter?

Usually not. Most residential properties are billed a flat quarterly rate based on the number of rooms, water closets, baths/showers and sprinkling frontage, per the Water Division’s current water rates. Metered billing is standard for commercial buildings and buildings with seven or more units; single-family owners can opt into a meter.

Who is responsible for the sewer lateral line in St. Louis?

The homeowner. MSD’s FAQ says homeowners are responsible for maintaining the lateral line from the house to the public sewer, and points customers to city- and county-sponsored Lateral Line Insurance programs to help cover future repairs.

For other Midwest utilities, see Kansas City, MO tap and connection fees and Columbus, OH tap fees.

Related: water tap fees · sewer tap fees · water meter installation cost · tap fee vs. impact fee · Nashville fees · Denver fees · utility connection cost calculator

Sources for St. Louis figures