Cary, NC Water & Sewer Tap and Development Fees (2026)

Last reviewed: By Utility Cost Guide editor

The Town of Cary provides both water and sewer to addresses in its utility service area, and it sizes the development fees for a new house by the home’s square footage, not by the meter. For a single-family home with 2,401 to 3,100 square feet under roof on a subdivision lot where the developer’s contractor already built the services, the fiscal 2027 total is $6,766: a $2,548 water development fee, a $3,683 sewer development fee and $535 for Cary to set a 1-inch meter (Town of Cary FY2027 Fee Schedule, fiscal year starting July 1, 2026). If the Town has to make both taps on an infill lot, the meter charge is replaced by a $6,237 full water tap and a $4,569 sewer tap, and the total becomes $17,037 before any street cut. Check the measurement before you budget: Cary bases the fee on total area under roof, and the schedule does not say it is limited to heated space. On our reading, that means a covered porch or garage could put a home in a higher tier than its listed square footage suggests, so confirm the figure with Cary.

Cary connection fees at a glance

The table lists every Town of Cary row we verified from the FY2027 schedule. Utility system development fees are Cary’s capacity charges, in five square-footage tiers that apply in all areas Cary serves. Utility connection fees pay Town crews: a “full tap” connects at the main, runs the service to the property line and includes the meter, box and yoke, while “meter only” sets a meter in an existing box. Street cuts, irrigation split taps, deposits and the new-account charge apply only as their notes describe. The smallest size in Cary’s connection table is 1 inch.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
General — Account Setup
GeneralAccount SetupUtility Service Charge for New Accounts—$18per unit2026-07-01Official source2026-09-24
General — Deposit
GeneralDepositUtility Deposit, 1" meter1"$100by meter size2026-07-01Official source2026-09-24
GeneralDepositUtility Deposit, 5/8" meter5/8"$60by meter size2026-07-01Official source2026-09-24
General — Inspection
GeneralInspectionUtility Inspection Fee: Water and Sewer Taps (per tap)—$100per unit2026-07-01Official source2026-09-24
General — Other
GeneralOtherCurb Cut, Street Cut or Bore (each)—$1,675flat fee2026-07-01Official source2026-09-24
GeneralOtherSidewalk Cut—$1,740flat fee2026-07-01Official source2026-09-24
Sewer — Capacity
SewerCapacityResidential Sewer Development Fee, Single Family 1,701-2,400 sq ft
1,701–2,400 sq ft
—$3,162flat fee2026-07-01Official source2026-09-24
SewerCapacityResidential Sewer Development Fee, Single Family 2,401-3,100 sq ft
2,401–3,100 sq ft
—$3,683flat fee2026-07-01Official source2026-09-24
SewerCapacityResidential Sewer Development Fee, Single Family 3,101-3,800 sq ft
3,101–3,800 sq ft
—$4,108flat fee2026-07-01Official source2026-09-24
SewerCapacityResidential Sewer Development Fee, Single Family over 3,800 sq ft
Over 3,800 sq ft
—$5,225flat fee2026-07-01Official source2026-09-24
SewerCapacityResidential Sewer Development Fee, Single Family under 1,700 sq ft
Under 1,700 sq ft under roof
—$2,258flat fee2026-07-01Official source2026-09-24
Sewer — Tap
SewerTapSewer Tap (4" or 6")—$4,569flat fee2026-07-01Official source2026-09-24
Water — Capacity
WaterCapacityResidential Water Development Fee, Irrigation (potable water), per lot—$1,639per unit2026-07-01Official source2026-09-24
WaterCapacityResidential Water Development Fee, Single Family 1,701-2,400 sq ft
1,701–2,400 sq ft
—$2,077flat fee2026-07-01Official source2026-09-24
WaterCapacityResidential Water Development Fee, Single Family 2,401-3,100 sq ft
2,401–3,100 sq ft
—$2,548flat fee2026-07-01Official source2026-09-24
WaterCapacityResidential Water Development Fee, Single Family 3,101-3,800 sq ft
3,101–3,800 sq ft
—$3,067flat fee2026-07-01Official source2026-09-24
WaterCapacityResidential Water Development Fee, Single Family over 3,800 sq ft
Over 3,800 sq ft
—$3,928flat fee2026-07-01Official source2026-09-24
WaterCapacityResidential Water Development Fee, Single Family under 1,700 sq ft
Under 1,700 sq ft under roof
—$1,670flat fee2026-07-01Official source2026-09-24
Water — Meter
WaterMeterUtility Connection Fee: Meter Only 1.5"1.5"$1,130by meter size2026-07-01Official source2026-09-24
WaterMeterUtility Connection Fee: Meter Only 1" (potable water or irrigation)
Contractor-built service; Town sets 1" meter
1"$535by meter size2026-07-01Official source2026-09-24
WaterMeterUtility Connection Fee: Meter Only 2"2"$2,900by meter size2026-07-01Official source2026-09-24
Water — Other
WaterOtherMeter Box 1" (Potable)1"$708flat fee2026-07-01Official source2026-09-24
Water — Tap
WaterTapUtility Connection Fee: Full Tap 1.5" (potable water or irrigation)1.5"$9,147by meter size2026-07-01Official source2026-09-24
WaterTapUtility Connection Fee: Full Tap 1" (potable water or irrigation)
Town makes full 1" water tap
1"$6,237by meter size2026-07-01Official source2026-09-24
WaterTapUtility Connection Fee: Split Tap 1" (additional 1" meter on a service)1"$2,814by meter size2026-07-01Official source2026-09-24
WaterTapUtility Connection Fee: Full Tap 2" (potable water or irrigation)2"$12,398by meter size2026-07-01Official source2026-09-24

Worked example: a new home in Cary

Assumptions: one detached house on Cary water and sewer, no irrigation meter, FY2027 fees, a 1-inch meter, and no street or sidewalk cut unless stated. Columns A to C vary house size on a subdivision lot; D is an infill lot.

Town of Cary one-time water and sewer charges for one house, FY2027 (source: Cary FY2027 Fee Schedule, utility system development fees and utility connection fees).

Charge A. 1,701–2,400 sq ft, contractor-built service B. 2,401–3,100 sq ft, contractor-built service C. 3,101–3,800 sq ft, contractor-built service D. 2,401–3,100 sq ft, Cary makes both taps
Water development fee $2,077 $2,548 $3,067 $2,548
Sewer development fee $3,162 $3,683 $4,108 $3,683
Meter only, 1″ $535 $535 $535 included in tap
Full water tap, 1″ not charged not charged not charged $6,237
Sewer tap (4″ or 6″) not charged not charged not charged $4,569
Total $5,774 $6,766 $7,710 $17,037

The arithmetic: A is $2,077 + $3,162 + $535 = $5,774. B is $2,548 + $3,683 + $535 = $6,766. C is $3,067 + $4,108 + $535 = $7,710. D is $2,548 + $3,683 + $6,237 + $4,569 = $17,037. The smallest tier (under 1,700 square feet) totals $1,670 + $2,258 + $535 = $4,463, and the largest (over 3,800 square feet) totals $3,928 + $5,225 + $535 = $9,688.

On an infill lot, installation is the bigger cost. In case D, $10,806 of the $17,037 is the two taps. Cary adds $1,675 for each curb cut, street cut or bore the work needs, and $1,740 for each 5-by-5-foot sidewalk section it has to replace. One street cut raises D to $18,712. If both the water and sewer taps need a street cut, the total is $20,387. A lawn irrigation meter is a separate choice. It adds a $2,814 split tap plus a $1,639 potable-irrigation development fee per lot, $4,453 in all.

Cary’s schedule also lists a 1-inch potable meter box at $708. A full tap already includes the box. The schedule does not say whether a home on a contractor-built service is billed for the box separately, so the subdivision totals above leave it out. Ask Cary’s Inspections and Permits office before you budget.

How Cary compares with Raleigh and other North Carolina cities

The figures below come from each city’s page on this site. Meter sizes differ and Cary’s fees follow house size, so read this as a budget comparison, not a like-for-like price list.

Official one-time water and sewer charges for a single-family home, FY2027 (Cary: 2,401–3,100 sq ft, 1″ meter; other cities from our Raleigh, Charlotte, Concord and Wilmington pages).

City (utility, meter) Developer-built services Utility makes the taps
Cary (Town of Cary, 1″) $6,766 $17,037
Raleigh (Raleigh Water, 5/8″) $3,960 $14,871
Charlotte (Charlotte Water, 5/8″) $6,727 $17,370
Concord (City of Concord + WSACC, 3/4″) $6,023 $8,157
Wilmington (CFPUA, 5/8″) $6,050 $11,126

Against Raleigh, the subdivision-lot gap is $2,806, almost all capacity charges: Cary’s $6,231 in development fees against Raleigh’s $3,670 for a 5/8-inch meter. On an infill lot it narrows to $2,166, because Cary’s two taps ($10,806, meter included) cost slightly less than Raleigh’s ($10,911). In Raleigh a bigger meter raises the fees; in Cary a bigger house does.

What is not included in Cary fees

Cary’s tap prices stop at the property line, and the development fees buy capacity only. Your builder or plumber still has to connect the house:

A house set 60 feet back would add roughly 60 × $50 = $3,000 for water and 60 × $100 = $6,000 for sewer at typical prices. These ranges come from our national benchmark set, not from Cary. Building permit fees and Cary’s transportation development fees (Land Development Ordinance section 7.11), both charged at permit issuance, are also left out. Build your own total with the calculator:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

When you pay Cary connection fees

For help calculating development fees on a specific lot, the schedule points to 311 inside Cary or (919) 469-4000 outside it.

What could change in Cary

These are Cary’s FY2027 fees, for July 1, 2026 through June 30, 2027. Cary’s fees page says the document was extracted from the proposed FY2027 operating budget. Town Council adopted that budget on June 25, 2026, and its list of changes to the recommended budget touched only fire permit and commercial alteration fees, not the utility fees used here (Town of Cary budget page). The adopted budget also raised monthly base charges, which are not part of these one-time totals. If you pull a permit after June 30, 2027, check the FY2028 schedule. In Council-designated “Special Utility Areas,” Cary collects the water and sewer development fees as one combined fee, which should not change the totals above.

Common questions about Cary fees

How much are water and sewer tap fees for a new house in Cary, NC?

In FY2027, a 2,401 to 3,100 square-foot home on a lot with contractor-built services pays $6,766: $2,548 water development fee, $3,683 sewer development fee and $535 for a 1-inch meter. If the Town must make both taps, the total is $17,037, plus $1,675 for each street cut or bore.

Why does Cary charge more for a bigger house?

Cary’s residential development fees are set by total area under roof per meter, in five tiers, rather than by meter size. The combined water and sewer fee runs from $3,928 for a home under 1,700 square feet to $9,153 for one over 3,800 square feet.

When do I pay Cary’s water and sewer development fees?

At building permit issuance. The schedule says the fees are collected when new demand is created and are in addition to any water and sewer tap charges.

What does Cary’s $6,237 full water tap include?

Town crews make the tap on the main and run a 1-inch service line to the property line, and the fee includes the meter, box and yoke. Street cuts or bores are added at $1,675 each when needed. The sewer tap is a separate $4,569.

Do I need a separate irrigation meter in Cary?

No, but if you want one, a 1-inch split tap costs $2,814, and potable-water irrigation carries a $1,639 development fee per lot. Together that adds $4,453 to the house’s connection costs.

Is there a deposit for new water service in Cary?

Yes. The deposit is set per meter by size: $100 for a 1-inch meter and $60 for a 5/8-inch meter, subject to the waiver and refund rules in Finance Policy 112. A new account also carries an $18 service charge.

Where to go next from Cary

Compare Cary with Raleigh, Charlotte, Concord and Wilmington on the North Carolina utility connection costs hub, or see the national tap fees by city table. Background: tap fee vs. impact fee, sewer tap fees, water service line cost and utility costs for new construction. For a full budget, use the utility connection cost calculator.

Official documents behind the Cary figures