Lehi City Water, Sewer and Power Connection and Impact Fees (2026)
Lehi City provides culinary (drinking) water, pressurized irrigation, sewer collection, storm drainage and electricity, and sewage is treated by the regional Timpanogos district. A new single-family home with a 3/4-inch culinary meter on a lot of a quarter acre or less pays about $10,660 in water, secondary water, sewer and storm drain connection and impact fees, and about $3,020 more for a 200-amp Lehi City Power service. The largest single item is not a city fee: the $5,793 regional sewer treatment impact fee, which the district held a hearing on revising on September 17, 2026.
Lehi connection fees at a glance
The rows come from two city documents. Connection fees (the charge for the meter or lateral) are taken from the Lehi City FY 2027 Fee Schedule. Impact fees come from the city’s Connection and Impact Fees sheet, updated August 26, 2026. The water, sewer, pressurized irrigation and storm drain impact fees are still the amounts the sheet labels FY 2020. Two of them are charged per acre with a quarter-acre minimum, so the table shows the per-acre rate, not what a typical lot pays. The worked example below does that math. Lehi charges no connection fee for sewer or storm drain, only impact fees.
| Service | Category | Fee | Meter | Amount | Basis | Effective | Source | Verified |
|---|---|---|---|---|---|---|---|---|
| Electric — Connection | ||||||||
| Electric | Connection | Residential Single Phase Connection Fee - 201 to 400 amps (self contained) 201–400 A service | — | $544 | flat fee | — | Official source | 2026-09-25 |
| Electric | Connection | Residential Single Phase Connection Fee - up to 200 amps (self contained) Up to 200 A service | — | $465.57 | flat fee | — | Official source | 2026-09-25 |
| Electric — Impact | ||||||||
| Electric | Impact | Power Impact Fee - Residential Single Phase, 200 amp service Up to 200 A service | — | $2,554 | flat fee | — | Official source | 2026-09-25 |
| Electric | Impact | Power Impact Fee - Residential Single Phase, 400 amp service 201–400 A service | — | $4,469 | flat fee | — | Official source | 2026-09-25 |
| Sewer — Impact | ||||||||
| Sewer | Impact | Sewer Impact Fee (Lehi City collection system) - Residential | — | $872.44 | per unit | — | Official source | 2026-09-25 |
| Sewer | Impact | Timpanogos Special Service District (regional sewer treatment plant) Impact Fee - Single Family | — | $5,793 | per unit | — | Official source | 2026-09-25 |
| Stormwater — Impact | ||||||||
| Stormwater | Impact | Storm Drain Impact Fee - All Uses | — | $1,391 | formula | — | Official source | 2026-09-25 |
| Water — Connection | ||||||||
| Water | Connection | Culinary Water Connection Fee - 1" meter | 1" | $568.45 | by meter size | — | Official source | 2026-09-25 |
| Water | Connection | Pressurized Irrigation (Secondary Water) Connection Fee - 1" lateral | 1" | $567.04 | by meter size | — | Official source | 2026-09-25 |
| Water | Connection | Culinary Water Connection Fee - 3/4" meter | 3/4" | $476.73 | by meter size | — | Official source | 2026-09-25 |
| Water — Impact | ||||||||
| Water | Impact | Culinary Water Impact Fee - Residential | — | $1,194.07 | per unit | — | Official source | 2026-09-25 |
| Water | Impact | Pressurized Irrigation (Secondary Water) Impact Fee - Residential | — | $5,638 | formula | — | Official source | 2026-09-25 |
| Water — Other | ||||||||
| Water | Other | Water Rights Conveyance Requirement (Development Code Ch. 27) | — | See formula | formula | — | Official source | 2026-09-25 |
| Water — Permit | ||||||||
| Water | Permit | Pre-construction Water Permit (secondary water) - base | — | $85 | formula | — | Official source | 2026-09-25 |
Worked example: a new home in Lehi
Assumptions: a detached home inside Lehi on city culinary water, pressurized irrigation and sewer, a 3/4-inch culinary meter, a 1-inch irrigation lateral (the smallest size the schedule lists) and a 200-amp single-phase electric service. The lot is a quarter acre or less, so the per-acre fees are charged at the quarter-acre minimum.
Lehi connection and impact fees for one new home (FY 2027 connection fees; impact fees as listed August 26, 2026)
| Charge | Lot ≤ 1/4 acre | 1/2-acre lot |
|---|---|---|
| Culinary water connection fee, 3/4″ meter | $476.73 | $476.73 |
| Culinary water impact fee, per dwelling | $1,194.07 | $1,194.07 |
| Pressurized irrigation connection fee, 1″ lateral | $567.04 | $567.04 |
| Pressurized irrigation impact fee ($5,638 per acre) | $1,409.50 | $2,819.00 |
| Lehi sewer impact fee, per dwelling | $872.44 | $872.44 |
| Timpanogos regional sewer impact fee, per house | $5,793.00 | $5,793.00 |
| Storm drain impact fee ($1,391 per acre) | $347.75 | $695.50 |
| Water, sewer and storm drain subtotal | $10,660.53 | $12,417.78 |
| Lehi City Power connection fee, up to 200 A | $465.57 | $465.57 |
| Power impact fee, 200 A single phase | $2,554.00 | $2,554.00 |
| Total with electric | $13,680.10 | $15,437.35 |
The quarter-acre figures are 0.25 × $5,638 = $1,409.50 for irrigation and 0.25 × $1,391 = $347.75 for storm drain. On a half-acre lot both double. Ask the city whether it measures gross lot area or irrigable area for your parcel, since the sheet says only “per acre.”
Two choices move the total. A 1-inch culinary meter costs $568.45 instead of $476.73, adding $91.72. A 400-amp electric service costs $544.00 to connect and carries a $4,469 impact fee, so the electric line becomes $5,013.00 instead of $3,019.57, about $1,990 more. Lehi’s power impact fee also steps down for smaller services: $1,596 for 100 amps and $2,234 for 150 amps.
How Lehi compares with Salt Lake City
Lehi’s total is far higher than Salt Lake City’s current connection fees. There, a new home with a 3/4-inch meter on a quarter-acre lot pays about $3,080 for water, sewer, stormwater and inspections under the June 2026 schedule. Lehi’s comparable water, sewer and storm drain charges come to $10,660.53, about $7,580 more. The gap comes mostly from two things Salt Lake City does not charge: the $5,793 regional treatment impact fee and a separate pressurized irrigation system ($1,976.54 for connection and impact on a quarter acre). Salt Lake City has proposed impact fees that would bring its total to about $12,130, about $1,470 more than Lehi’s $10,660.53.
What Lehi’s fees don’t cover
The fees above pay for capacity in the city’s systems and for the meter or lateral connection. They do not cover the pipe on your lot, the trench, the plumbing permit or the building permit. National estimates (methodology), which include trenching:
- Water service line: $30–$150 per foot, typical $50. At 50 feet, about $2,500.
- Sewer lateral: $50–$250 per foot, typical $100. At 50 feet, about $5,000.
- A second line for pressurized irrigation adds to the service-line cost on a Lehi lot; the fee schedule does not price it.
- Street cut or bore: $1,000–$10,000 per crossing, typical $4,000.
The underground electric service from the transformer to your meter base is also not in these figures. Lehi’s building permit checklist asks for the meter base location and service amperage with your plans, and that amperage sets the power fees above.
The calculator below leaves the two per-acre impact fees (pressurized irrigation and storm drain) out of its total and shows them without an amount. Enter your own figure for each: $1,409.50 and $347.75 on a lot of a quarter acre or less.
Estimate utility connection costs
Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.
How and when Lehi fees are paid
Lehi posts its connection and impact fee sheet on the Building and Inspections page, next to the new residential construction checklist; the documents we read do not state exactly when each fee is collected, so ask the building department whether it is at permit issuance or at meter set. The regional sewer impact fee is listed on the same city sheet, but the FY 2027 fee schedule refers it to the district (“See T.S.S.D.”), so ask the building department who collects it.
Water rights are a separate requirement that usually falls on the developer, not the home buyer. Under Section 27.070 of the Lehi Development Code, anyone who annexes, rezones or subdivides land in a way that needs more city water must convey water rights to the city. Most single-family zones require 3.69 acre-feet per acre; in the R-1-8 zone that is 1.80 acre-feet for culinary water and 1.89 for irrigation. The code does not publish a dollar fee-in-lieu. Culinary water can be obtained from the city for a fee set by the City Engineer. If you are buying a single lot outside a finished subdivision, ask the Planning Department whether water rights were already conveyed for it.
The FY 2027 schedule also lists a pre-construction water permit ($85 plus $1 per 1,000 square feet of lot, or $25 per lot, whichever is less) under pressurized irrigation. It is not clear that every home builder pays it, so it is not in the example.
Upcoming changes in Lehi
- The Timpanogos district, reorganized on June 22, 2026 as the Timpanogos Sanitary Sewer District, held a public hearing on September 17, 2026 on an amended 2026 sewer impact fee analysis and a resolution revising its 2025 impact fee enactment. The $5,793 fee may change; the notice we read does not state a new amount.
- Lehi’s water, sewer, irrigation and storm drain impact fees still carry FY 2020 labels. If the city updates its impact fee studies, these could rise.
- Connection fees reset each fiscal year. The FY 2027 schedule raised the 3/4-inch culinary meter from $464.30 to $476.73 and the 200-amp power connection from $374.02 to $465.57.
Lehi tap fee FAQ
How much are impact fees for a new house in Lehi?
For a quarter-acre lot, the water, irrigation, sewer and storm drain impact fees total $9,616.76: $1,194.07 culinary water, $1,409.50 pressurized irrigation, $872.44 city sewer, $5,793 regional sewer and $347.75 storm drain. A 200-amp power impact fee adds $2,554. Connection fees are on top of that. The same city sheet also lists transportation, parks, fire and police impact fees per dwelling, which this page does not cover.
What is the Timpanogos sewer impact fee?
It is $5,793 per single-family house, listed on Lehi’s connection and impact fee sheet updated August 26, 2026. It pays for the regional treatment plant, and the district held a hearing on September 17, 2026 on revising it.
Does Lehi charge for pressurized irrigation separately?
Yes. A 1-inch irrigation lateral costs $567.04 under the FY 2027 schedule, and the residential irrigation impact fee is $5,638 per acre with a quarter-acre minimum, or $1,409.50 for a small lot.
How much is a water meter connection in Lehi?
The FY 2027 culinary water connection fee is $476.73 for a 3/4-inch meter and $568.45 for 1 inch. The culinary water impact fee of $1,194.07 per dwelling is charged separately.
Do I have to buy water shares to build in Lehi?
Water rights are conveyed when land is annexed, rezoned or subdivided, usually by the developer. Most single-family zones require 3.69 acre-feet per acre. If your lot is in an approved subdivision, the rights were normally handled at platting; check with the Planning Department for a stand-alone parcel.
What does Lehi City Power charge to connect a new home?
A residential single-phase service up to 200 amps costs $465.57 to connect in FY 2027, plus a $2,554 power impact fee. A 201–400 amp service costs $544 to connect, and the impact fee for 400 amps is $4,469.
Related guides for Lehi
Southwest of Lehi, Saratoga Springs water, sewer and irrigation fees add a water rights charge at plat.
Salt Lake City tap fees · Boise connection fees · tap fees by city · tap fee vs impact fee · sewer tap fee · cost to run power to a property · utility connection cost calculator
Lehi fee sources
- Lehi City FY 2027 Fee Schedule (Approved), Lehi City. Checked Sep 25, 2026.
- Lehi City Connection and Impact Fees (updated August 26, 2026), Lehi City Building and Inspections. Checked Sep 25, 2026.
- Development Code Chapter 27, Annexation Procedures and Water Rights Conveyance Requirements, Lehi City. Checked Sep 25, 2026.
- Finance Department (fiscal year and fee schedule archive), Lehi City. Checked Sep 25, 2026.
- Notice of Public Hearing, September 17, 2026, Timpanogos Sanitary Sewer District (Utah Public Notice Website). Checked Sep 25, 2026.