Boise Sewer Connection Fees and Water Hookup Costs (2026)

Last reviewed: By Utility Cost Guide editor

In Boise, two different organizations connect a new house. The City of Boise’s Water Renewal utility handles sewer, and Veolia Water Idaho, a private company regulated by the Idaho Public Utilities Commission, supplies water at most addresses. A 2,100-square-foot single-family home on a low-density lot pays $4,549.20 in city sewer connection fees for fiscal 2026. That is a $2,647.06 treatment fee plus a $1,902.14 trunk fee, and a separate $84.42 tap-in permit brings it to $4,633.62. Veolia’s tariff has no hookup or capacity fee when its main already runs along the front of the lot. The caveat that matters most is timing. Boise is finishing a three-year phase-in, and the FY 2027 Proposed Budget would raise the same home’s sewer fees to $5,133 on October 1, 2026.

Boise connection fees at a glance

Boise’s sewer connection fee has two parts. The treatment fee depends on the home’s size, in five square-footage bands. The trunk fee depends on how densely the lot is developed, in three bands measured in dwelling units per acre. You pay one treatment band and one trunk band, not every row. The table lists each band from the fee-change tables in the city’s FY 2026 Adopted Budget, along with the FY 2027 proposed figures, which are marked for review because they had not been confirmed as adopted when we checked. Two rows apply only to some lots. The equivalent assessment is charged only when a lot has never paid for the sewer main in its street. The public service line fee applies where the city provides the public service line. Veolia’s rows come from its IPUC-approved tariff, effective June 1, 2025.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Sewer — Connection
SewerConnectionWater Renewal (Sewer) Connection Fee - Treatment, Single Family Residential (1,401 to 2,100 sq ft)
Home 1,401–2,100 sq ft
—$2,647.06flat fee2025-10-01Official source2026-09-24
SewerConnectionWater Renewal (Sewer) Connection Fee - Treatment, Single Family Residential (1,401 to 2,100 sq ft) - FY2027 proposed—$3,019flat fee2026-10-01Official source2026-09-24 Confirm with utility
SewerConnectionWater Renewal (Sewer) Connection Fee - Treatment, Single Family Residential (2,101 to 2,800 sq ft)
Home 2,101–2,800 sq ft
—$3,034.77flat fee2025-10-01Official source2026-09-24
SewerConnectionWater Renewal (Sewer) Connection Fee - Treatment, Single Family Residential (2,101 to 2,800 sq ft) - FY2027 proposed—$3,706flat fee2026-10-01Official source2026-09-24 Confirm with utility
SewerConnectionWater Renewal (Sewer) Connection Fee - Treatment, Single Family Residential (701 to 1,400 sq ft)
Home 701–1,400 sq ft
—$2,647.06flat fee2025-10-01Official source2026-09-24
SewerConnectionWater Renewal (Sewer) Connection Fee - Treatment, Single Family Residential (701 to 1,400 sq ft) - FY2027 proposed—$3,019flat fee2026-10-01Official source2026-09-24 Confirm with utility
SewerConnectionWater Renewal (Sewer) Connection Fee - Treatment, Single Family Residential (less than 700 sq ft)
Home under 700 sq ft
—$1,647flat fee2025-10-01Official source2026-09-24
SewerConnectionWater Renewal (Sewer) Connection Fee - Treatment, Single Family Residential (less than 700 sq ft) - FY2027 proposed—$1,647flat fee2026-10-01Official source2026-09-24 Confirm with utility
SewerConnectionWater Renewal (Sewer) Connection Fee - Treatment, Single Family Residential (over 2,800 sq ft)
Home over 2,800 sq ft
—$3,824.50flat fee2025-10-01Official source2026-09-24
SewerConnectionWater Renewal (Sewer) Connection Fee - Treatment, Single Family Residential (over 2,800 sq ft) - FY2027 proposed—$5,243flat fee2026-10-01Official source2026-09-24 Confirm with utility
SewerConnectionWater Renewal (Sewer) Connection Fee - Trunk, Single Family Residential (high density, more than 15 units per acre)
High density, over 15 homes per acre
—$254flat fee2025-10-01Official source2026-09-24
SewerConnectionWater Renewal (Sewer) Connection Fee - Trunk, Single Family Residential (high density, more than 15 units per acre) - FY2027 proposed—$254flat fee2026-10-01Official source2026-09-24 Confirm with utility
SewerConnectionWater Renewal (Sewer) Connection Fee - Trunk, Single Family Residential (low density, fewer than 6 units per acre)
Low density, under 6 homes per acre
—$1,902.14flat fee2025-10-01Official source2026-09-24
SewerConnectionWater Renewal (Sewer) Connection Fee - Trunk, Single Family Residential (low density, fewer than 6 units per acre) - FY2027 proposed—$2,114flat fee2026-10-01Official source2026-09-24 Confirm with utility
SewerConnectionWater Renewal (Sewer) Connection Fee - Trunk, Single Family Residential (medium density, 6 to 15 units per acre)
Medium density, 6–15 homes per acre
—$909flat fee2025-10-01Official source2026-09-24
SewerConnectionWater Renewal (Sewer) Connection Fee - Trunk, Single Family Residential (medium density, 6 to 15 units per acre) - FY2027 proposed—$909flat fee2026-10-01Official source2026-09-24 Confirm with utility
Sewer — Main Extension
SewerMain ExtensionEquivalent Assessment (0 to 6,000 sq ft lot)—$2,362.12formula2025-10-01Official source2026-09-24
SewerMain ExtensionEquivalent Assessment (6,001 to 8,000 sq ft lot)—$2,755.80formula2025-10-01Official source2026-09-24
SewerMain ExtensionEquivalent Assessment (8,001 to 10,000 sq ft lot)—$3,543.18formula2025-10-01Official source2026-09-24
Sewer — Permit
SewerPermitTap-in Permit Fee (per each sewer tap)—$84.42flat fee2025-10-01Official source2026-09-24
Sewer — Service Line
SewerService LinePublic Service Line Fee (4 inch)—$2,198flat fee2025-10-01Official source2026-09-24
Water — Connection
WaterConnectionNew service connection (normal business hours)—$0flat fee2025-06-01Official source2026-09-24
Water — Main Extension
WaterMain ExtensionWater main extension - individual residence (free-footage allowance $500 per service connection)—See formulaformula2025-06-01Official source2026-09-24

Worked example: a new home in Boise

Assumptions: a detached home inside Boise, served by city sewer and Veolia water, on a lot whose sewer main was already paid for (no equivalent assessment), with a Veolia main along the front of the lot. “Low density” means fewer than 6 dwelling units per acre. Since an acre is 43,560 square feet, that works out to lots larger than about 7,260 square feet (43,560 ÷ 6).

Boise sewer connection fees for four typical homes: FY2026 adopted vs FY2027 proposed

Home Treatment FY2026 Trunk FY2026 Total FY2026 Total FY2027 proposed
2,100 sq ft, low-density lot $2,647.06 $1,902.14 $4,549.20 $5,133.00
2,400 sq ft, low-density lot $3,034.77 $1,902.14 $4,936.91 $5,820.00
1,800 sq ft, medium density (6–15 units/acre) $2,647.06 $909.00 $3,556.06 $3,928.00
3,000 sq ft, low-density lot $3,824.50 $1,902.14 $5,726.64 $7,357.00

How the rows add up. For the 2,100-square-foot home: $2,647.06 + $1,902.14 = $4,549.20. Add the $84.42 tap-in permit and the city total is $4,633.62. Under the proposed FY2027 schedule the same home pays $3,019 + $2,114 = $5,133, which is $583.80 more. The largest band moves the most. A home over 2,800 square feet would go from $3,824.50 to $5,243 in treatment fees alone, and its low-density total would rise by $7,357 − $5,726.64 = $1,630.36.

Water adds nothing in connection fees in the base case. Veolia’s tariff says it makes the connection to a main that fronts the property and installs the service line from the main through the meter box, including the meter. It also says new service connections carry no charge during business hours; a connection requested outside business hours costs $25.

A lot that has never been served changes the math. If the lot was split, never developed or never connected, Boise adds an equivalent assessment based on lot area: $2,362.12 for lots up to 6,000 square feet, $2,755.80 for 6,001–8,000 and $3,543.18 for 8,001–10,000 in FY2026. With a $2,755.80 assessment, the 2,100-square-foot example rises to $4,633.62 + $2,755.80 = $7,389.42.

The article that first estimated Boise’s fees used a May 2024 staff memo, which called the FY2025 figures proposed. The city’s FY 2025 Adopted Budget confirms they were adopted: $2,321 treatment plus $1,712 trunk, or $4,033, for the 2,100-square-foot example. The FY2026 figures on this page are the ones in effect through September 30, 2026.

What is not included in Boise fees

The city says its connection fee does not cover the physical connection from the building to the edge of the right-of-way. That sewer lateral is built by your plumber or contractor. On the water side, Veolia installs the line only as far as the meter box, so the pipe from the meter to the house is yours. You still need a plumbing permit, trenching and possibly street work. National estimates (methodology):

Electric service from Idaho Power is covered by its line-extension tariff (Rule H). We were not able to retrieve the current version for this review, so this page lists no electric figures. For national ranges, see cost to run power to a property. We also have no published Intermountain Gas hookup figure on file.

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

How and when Boise fees are paid

Under Boise City Code 10-2-6-2, sewer connection fees are due before sewer service begins. They buy capacity at the city’s water renewal facilities (the treatment fee) and in the pipes that carry wastewater there (the trunk fee). The tap-in permit, $84.42 per sewer tap in FY2026, covers the physical tap. For questions about connection fees, the city lists its sewer rating staff at 208-608-7150.

On the water side, if no Veolia main fronts the lot, the tariff requires an individual-residence main extension agreement. Veolia pays for the extension when it costs $500 or less per service connection. Above that, the owner deposits the estimated cost of the extension, priced as an 8-inch main, minus the $500 allowance. When several owners ask for the same extension, the cost is normally divided by front footage.

Boise fee changes to watch

Boise tap fee FAQ

How much is the sewer connection fee in Boise?

For fiscal 2026 it is a treatment fee based on the home’s size plus a trunk fee based on lot density. A 2,100-square-foot home on a low-density lot pays $2,647.06 + $1,902.14 = $4,549.20, plus an $84.42 tap-in permit.

Why does a bigger house pay more to connect to sewer in Boise?

Boise sets treatment fees by square footage because larger homes can send more wastewater to its treatment plants. In FY2026, homes of 701 to 2,100 sq ft pay $2,647.06, homes of 2,101 to 2,800 sq ft pay $3,034.77, and homes over 2,800 sq ft pay $3,824.50.

Does Veolia charge a water tap fee in Boise?

Its tariff lists no hookup or capacity fee. When a main fronts the lot, Veolia installs the service line to the meter box and the meter, and the connection is free during business hours ($25 after hours). If no main fronts the lot, you pay for a main extension beyond a $500 allowance.

Are Boise’s sewer connection fees going up?

The FY 2027 Proposed Budget would raise the 2,100-square-foot, low-density example from $4,549.20 to $5,133 on October 1, 2026. Homes over 2,800 sq ft would see the largest jump, from $3,824.50 to $5,243 in treatment fees.

What is Boise’s equivalent assessment fee?

It is a one-time charge for lots that never paid for the sewer main in their street, such as a newly split lot. It is based on lot area. In FY2026 it is $2,362.12 for lots up to 6,000 sq ft and $2,755.80 for lots of 6,001 to 8,000 sq ft.

When do I pay Boise’s sewer connection fee?

City code requires payment before sewer service starts. For questions about connection fees, call the city’s sewer rating staff at 208-608-7150.

Related guides for Boise

Nampa, west of Meridian, also runs its own water and sewer systems; see Nampa water and sewer hookup fees.

West of Boise, the City of Meridian runs its own water and sewer utilities; see Meridian water and sewer connection fees for its assessment schedule.

sewer tap fee · water tap fee · cost to run power to a property · Salt Lake City tap fees · tap fees by city · utility connection cost calculator

Official documents behind the Boise figures