City of Boulder Tap Fees and Plant Investment Fees (2026)

Last reviewed: By Utility Cost Guide editor

Inside Boulder city limits, water, wastewater and stormwater service come from the City of Boulder’s own utilities. Under the city’s 2026 Schedule of Fees, a new single-family home with a 3/4-inch meter and the city’s minimum 2,000 sq ft of irrigable landscape pays about $28,216 in official utility charges. That breaks down as $26,572 in plant investment fees (PIFs): a $13,734 indoor water PIF, a $7,480 outdoor water PIF and a $5,358 wastewater PIF. The other $1,644 covers the meter, the taps and the water and sewer permits and inspections. On top of that comes a stormwater PIF of $2.87 per square foot of new hard surface; at an assumed 2,500 sq ft of roof and paving, that adds $7,175. The biggest local variable is landscaping: Boulder charges the outdoor water PIF by square foot of irrigated area, so a larger lawn raises the bill quickly.

Boulder connection fees at a glance

All figures below come from the City of Boulder’s 2026 Schedule of Fees, published by Planning and Development Services. Boulder calls its capacity charges plant investment fees, and for homes it sets them by customer type, not by meter size (commercial customers pay by meter size and water budget). A single-family home pays a flat indoor water PIF, a tiered outdoor water PIF on irrigable area, a flat wastewater PIF, and a stormwater PIF on new impervious area. The small tap, meter, permit and inspection fees are separate lines. Rows marked as not typical, such as the 1-inch meter or a tap into a concrete sewer main, apply only in those cases.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Sewer — Impact
SewerImpactWastewater Plant Investment Fee (PIF) - New Single-Family Residential—$5,358per unit—Official source2026-09-24
Sewer — Inspection
SewerInspectionWastewater Inspection Fee - Residential (first two inspections)—$169flat fee—Official source2026-09-24
Sewer — Permit
SewerPermitWastewater Permit Fee - Residential—$127flat fee—Official source2026-09-24
Sewer — Tap
SewerTapWastewater Tap Fee (4" into PVC/VCP main)
4-inch tap into PVC/VCP main
—$238flat fee—Official source2026-09-24
SewerTapWastewater Tap Fee (4" into RCP main)
4-inch tap into RCP main
—$430flat fee—Official source2026-09-24
Stormwater — Impact
StormwaterImpactStormwater and Flood Management Utility Plant Investment Fee—$2.87per sq ft—Official source2026-09-24
Stormwater — Permit
StormwaterPermitStormwater Connection Permit Fee—$147flat fee—Official source2026-09-24
Water — Impact
WaterImpactWater Plant Investment Fee (PIF) - Indoor Component, New Single-Family Residential—$13,734per unit—Official source2026-09-24
WaterImpactWater Plant Investment Fee (PIF) - Outdoor Component, New Single-Family Residential—$3.74formula—Official source2026-09-24
Water — Inspection
WaterInspectionWater Inspection Fee - Residential (first two inspections)—$169flat fee—Official source2026-09-24
Water — Meter Set
WaterMeter SetWater Meter Material and Installation Fee (1")
1-inch meter
1"$764.09by meter size—Official source2026-09-24
WaterMeter SetWater Meter Material and Installation Fee (3/4")
3/4-inch meter
3/4"$577.37by meter size—Official source2026-09-24
Water — Permit
WaterPermitWater, Irrigation and Fire Line Permit Fee - Residential—$127flat fee—Official source2026-09-24
WaterPermitRight-of-Way Permit Fee - Meter Pit (3/4" to 1")3/4"$47flat fee—Official source2026-09-24
Water — Tap
WaterTapWater Tap Fee (1")
1-inch tap
1"$289by meter size—Official source2026-09-24
WaterTapWater Tap Fee (3/4")
3/4-inch tap
3/4"$237by meter size—Official source2026-09-24

Worked example: a new home in Boulder

Assumptions: a new detached home inside city limits on a newly subdivided lot, so there is no credit for an earlier house. The home has a 3/4-inch water meter (Boulder’s sizing chart allows a 3/4-inch meter up to 44 water fixture units), a 3/4-inch water tap and a 4-inch sewer tap into a PVC or clay main.

The fixed pieces are the same for every lot:

Fixed City of Boulder charges for a new home, 3/4-inch meter (2026 Schedule of Fees)

Charge Amount
Water PIF, indoor component $13,734.00
Wastewater PIF $5,358.00
Water meter material and installation, 3/4″ (includes $40.37 sales tax) $577.37
Water tap, 3/4″ $237.00
Water permit + first two inspections ($127 + $169) $296.00
Wastewater permit + first two inspections ($127 + $169) $296.00
Wastewater tap, 4″ into PVC/VCP main $238.00
Fixed subtotal $20,736.37

The outdoor water PIF is $3.74 per sq ft for the first 5,000 sq ft of irrigable area, $3.12 per sq ft for the next 9,000 sq ft and $2.50 per sq ft above 14,000 sq ft, with a 2,000 sq ft minimum. The city’s PIF estimating guide says the minimum irrigable area is the larger of 2,000 sq ft or the area on a city-approved landscape plan. Three assumed landscape sizes, for illustration only:

Outdoor water PIF and running total by irrigable area

Irrigable area Outdoor PIF arithmetic Outdoor PIF Total before stormwater
2,000 sq ft (minimum) 2,000 × $3.74 $7,480 $28,216
5,000 sq ft 5,000 × $3.74 $18,700 $39,436
8,000 sq ft 5,000 × $3.74 + 3,000 × $3.12 $28,060 $48,796

Then add the stormwater and flood management PIF at $2.87 per sq ft of new impervious area: roof, driveway, patios and walks. We don’t know your footprint, so here are two assumed amounts. They are illustrations, not city figures:

The stormwater PIF is cut in half if you build new detention that meets the city’s current design standards. A home that needs a 1-inch meter pays $764.09 for the meter and $289 for the tap, which adds $238.72 to every case above.

The schedule does not list a separate water rights or raw water charge for single-family homes, and we found none. Properties outside city limits need a separate Land Use Review approval before they can connect, and some lots also owe front-foot assessments for existing utility lines. Those assessments are due at annexation, subdivision, redevelopment, building permit or connection, whichever comes first.

What Boulder’s fees don’t cover

The city’s PIF estimating guide states that meter and tap fees do not include excavation and that any work in the city right-of-way must be done by a right-of-way licensed contractor. The fee schedule adds that the contractor supplies all tap materials. National estimates for the private work (methodology):

Boulder also charges a development excise tax for transportation and capital facility impact fees (parks and recreation, human services, municipal facilities, police, fire and transportation); the impact fees depend on the size of the home. They are not utility connection charges, so they are not in the totals above.

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

When you pay Boulder connection fees

For new construction, the city collects plant investment fees before final inspection. For other work it collects them when the permit is issued. You pay the PIF rate in effect on the date of your application, not the date you pay. Permit, tap and meter fees are due when the permit is issued. If the site isn’t ready when the crew arrives, the city charges a call-back fee: $312 for a water tap, $238 for a sewer tap and $99 for a 3/4-inch or 1-inch meter.

When you replace an existing house, Boulder credits the old unit at current PIF rates, and credits that exceed the new fees stay with the property instead of being refunded. The city sizes the water meter from a plumbing fixture unit worksheet you submit with the permit. To calculate the stormwater PIF, it asks for a worksheet showing the new impervious area.

What could change in Boulder

How Boulder compares

Typical official connection totals on our other Colorado pages (each page states its own assumptions)

City Typical total What it covers
Boulder $28,216 + $2.87/sq ft stormwater Water and wastewater PIFs, 3/4″ tap and meter, permits; 2,000 sq ft landscape
Denver $16,930 Denver Water SDC + sewer permit, 7,000 sq ft lot
Fort Collins $8,354 + water supply Water and sewer PIFs, 6,000 sq ft lot; raw water extra at $63,800/acre-foot
Aurora $44,456 3-bath home, 8,000 sq ft lot, 5/8″ meter
Erie $80,212 Includes $52,200 fee in lieu of water dedication; $28,012 without it

Before stormwater, Boulder’s total falls between Denver’s and Aurora’s in this group, though each page uses different assumptions. Unlike Fort Collins and Erie, though, Boulder’s schedule has no separate water rights charge for a single-family home.

Common questions about Boulder fees

How much is a water tap in Boulder, CO?

The physical 3/4-inch water tap is $237 and a 3/4-inch meter is $577.37 installed. Most of the cost is the water plant investment fee: $13,734 for the indoor component, plus at least $7,480 for the outdoor component on the 2,000 sq ft minimum landscape.

What is the sewer tap fee in Boulder?

A new single-family home pays a $5,358 wastewater plant investment fee, plus a $238 tap into a PVC or clay main ($430 into a concrete main) and $296 for the residential wastewater permit and first two inspections.

Why does my landscaping change Boulder’s water fee?

Boulder ties its water PIF to the water budget used for monthly bills. The outdoor component is $3.74 per sq ft of irrigable area for the first 5,000 sq ft, then lower rates for larger areas. Every home is charged for at least 2,000 sq ft.

How is Boulder’s stormwater plant investment fee calculated?

It is $2.87 per square foot of added impervious area, such as the roof, driveway and patios. The fee is halved if you build new detention that meets current city standards. Interior remodels and second-story additions that add no hard surface don’t pay it.

Do I get credit if I tear down an existing Boulder house?

Yes. Existing residential units approved under an earlier permit are credited at current PIF rates. Credits beyond the new fees stay with the property for future use and are not refunded in cash.

Where to go next from Boulder

Colorado utility connection costs · Denver Water tap fees · Erie tap fees · water meter installation cost · tap fee vs impact fee · utility connection cost calculator

Sources for Boulder figures