Bentonville Water & Sewer Connection Fees (2026)

Last reviewed: By Utility Cost Guide editor

The City of Bentonville provides water, sewer and electric service itself: Bentonville Water Utilities runs water and wastewater, and the city’s own Electric Utility Department supplies power. For a new single-family home with a 5/8-inch water service on a lot created after January 22, 2026, the city’s published connection charges come to $8,992: $1,100 for the city to install the 5/8-inch water service, a $7,867 wastewater development fee and a $25 account service fee. The date the lot was platted is the big caveat. A house on a lot that was already platted by January 22, 2026 gets a one-unit credit against the new wastewater fee, so it pays $1,125 instead. Separately, the city collects $3,845 in fire, library, park and police impact fees before it issues the certificate of occupancy.

Bentonville tap and connection charges at a glance

The table lists every Bentonville row in our database with its source. Water service and street-work charges come from the fee schedule on the city’s Water and Sewer Fees – New Construction page, adopted by Ordinance 2018-36 and effective July 1, 2018, so those rows are marked for review. The wastewater development fee is in Chapter 46 of the Municipal Code (Ordinance 2025-218). Rows marked as not typical, such as road bores and street cuts, apply only in some cases.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Electric — Inspection
ElectricInspectionRe-inspection fee after a failed service inspection—$150flat fee2024-09-01Official source2026-09-24
General — Account Setup
GeneralAccount SetupUtility account service fee (non-refundable)—$25flat fee—Official source2026-09-24
General — Impact
GeneralImpactFire/EMS Impact Fee - single-family detached—$532per unit2023-12-01Official source2026-09-24
GeneralImpactLibrary Impact Fee - single-family detached—$442per unit2023-12-01Official source2026-09-24
GeneralImpactPark Impact Fee - single-family detached—$2,521per unit2023-12-01Official source2026-09-24
GeneralImpactPolice Impact Fee - single-family detached—$350per unit2023-12-01Official source2026-09-24
Sewer — Impact
SewerImpactWastewater Development Fee (lot created after Jan 22, 2026)
Lot created after Jan 22, 2026
—$7,867per equivalent residential unit2026-01-22Official source2026-09-24
SewerImpactWastewater Development Fee (lot platted by Jan 22, 2026, after 1-ERU credit)
Lot platted by Jan 22, 2026 (1-ERU credit)
—$0per equivalent residential unit2026-01-22Official source2026-09-24
Sewer — Tap
SewerTapSewer Service (City labor, per hour)—$150varies2018-07-01Official source2026-09-30
SewerTapSewer Tap Fee (City crew taps existing sewer line; owner excavates)—$125flat fee2005-05-24Official source2026-09-24 Confirm with utility
Water — Other
WaterOtherRoad Bore (water service)—$20per linear foot2018-07-01Official source2026-09-30
WaterOtherStreet Cut for Water Service—$100varies2018-07-01Official source2026-09-30
Water — Permit
WaterPermitBackflow Permit - Residential—$25flat fee2018-07-01Official source2026-09-30
Water — Tap
WaterTap1" Water Service
1-inch water service
1"$1,200by meter size2018-07-01Official source2026-09-30
WaterTap5/8" Water Service
5/8-inch water service
5/8"$1,100by meter size2018-07-01Official source2026-09-30
WaterTapDouble 5/8" Water Service5/8"$1,400flat fee2018-07-01Official source2026-09-30

What a new Bentonville house pays: worked example

Assume one detached house, a 5/8-inch water service tapped by the city onto an existing main, and a sewer service line already stubbed to the lot. The water service is $1,100 on the Water Utilities fee schedule (effective July 1, 2018). City Code Section 98-759 says water tap fees cover the city’s labor and materials, and Section 98-760 says only the city may make the tap. Section 46-154 sets the wastewater development fee at $7,867 per equivalent residential unit (ERU) from January 22 through December 31, 2026, and every dwelling unit counts as one ERU. The Utility Billing new-customer page lists a $25 non-refundable service fee on every account.

Published City of Bentonville utility charges for one new single-family home (contractor’s work, deposits and non-utility impact fees not included).

Case Water service Wastewater development fee Account service fee Total
5/8-inch service, lot created after Jan. 22, 2026 $1,100 $7,867 $25 $8,992
5/8-inch service, lot platted by Jan. 22, 2026 $1,100 $0 (1-ERU credit) $25 $1,125
1-inch service, lot created after Jan. 22, 2026 $1,200 $7,867 $25 $9,092

The credit rule is in the same section. A residential permit gets a credit of one ERU when the home is built on a lot that was platted as of January 22, 2026. The credit also covers a lot from a preliminary plat whose city pre-construction meeting was held before that date. So one house on an older lot pays nothing, while each home in a later lot split or subdivision pays the full fee. On a plat the developer pays it, so a buyer may see it only in the lot price.

The city impact fees come on top of those figures. For a single-family detached home the city’s Schedule of Impact Fees lists fire/EMS at $532, library at $442, parks at $2,521 and police at $350, or $3,845 in total, effective December 1, 2023. They are paid before the certificate of occupancy is issued. Adding them to the first case gives $12,837 in city charges; on an older lot it is $4,970.

What Bentonville’s fees don’t cover

National figures are estimates from our benchmark set. The calculator below loads Bentonville’s official fees; add your contractors’ quotes to it:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

When you pay Bentonville connection fees

The water service fee is paid before the tap (Section 98-760). The wastewater development fee is due before the building permit for a single lot, or before the pre-construction meeting for a preliminary plat or large-scale development (Section 46-154). The four general impact fees are paid before the certificate of occupancy. For new subdivisions, the city’s FAQ says developers who build ahead of the new sewer interceptors will sign an agreement, and no domestic water meters will be set until the lot has an approved way to dispose of wastewater.

To open the account, Utility Billing asks for a signed service agreement and photo ID. The $25 fee rises to $50 for same-day service between 8 a.m. and 2 p.m. Any required deposit must be paid at application and is refunded to the account after 12 months of on-time payments. The page doesn’t state the deposit amount.

Bentonville fee changes to watch

How Bentonville compares

For a home on a lot platted before 2026, Bentonville’s $1,125 is in the same range as other cities in the region: Tulsa comes to $703.64 with a 5/8 x 3/4-inch meter, Kansas City to $858.00 with a 3/4-inch tap on an iron main, and Oklahoma City to $1,283.28 for a two-bath home. On a lot created after January 22, 2026, the $7,867 wastewater development fee pushes Bentonville’s total to $8,992, several times the figure in any of those three cities.

Bentonville tap fee FAQ

How much does Bentonville charge to connect a new house to water and sewer?

For a 5/8-inch water service on a lot created after January 22, 2026, the published city charges are $8,992: $1,100 for the water service, the $7,867 wastewater development fee and a $25 account fee. On a lot that was platted by January 22, 2026, a one-ERU credit cancels the wastewater fee and the total is $1,125.

What is Bentonville’s wastewater development fee?

It is a one-time fee adopted by Ordinance 2025-218 on December 22, 2025 and in effect since January 22, 2026. It is $7,867 per equivalent residential unit in 2026, and each home counts as one unit. The money repays debt for large sewer interceptors (12 inches and larger), and the fee rises each year with a CPI index starting in 2027.

Does the wastewater fee apply if my lot already existed?

Not for a single home. Section 46-154 gives a one-ERU credit for a lot platted as of January 22, 2026, or created by a preliminary plat whose pre-construction meeting happened before that date. The credit can’t exceed the fee, so one house on such a lot owes nothing. An added unit such as a duplex side would still count.

What other impact fees does a new Bentonville home pay?

A single-family detached home pays $532 for fire/EMS, $442 for the library, $2,521 for parks and $350 for police, which is $3,845, before the certificate of occupancy. These rates took effect December 1, 2023.

Who installs the water tap in Bentonville?

The city does. Only the city may tap its water or sewer mains unless the water and sewer superintendent or the mayor gives written permission. The $1,100 fee for a 5/8-inch service covers the city’s labor and materials. Your plumber still builds the private lines on your lot.

Related: water tap fees · sewer tap fees · tap fee vs. impact fee · Tulsa fees · Kansas City fees · Oklahoma City fees · utility connection cost calculator