Chandler Water and Wastewater System Development Fees (2026)

Last reviewed: By Utility Cost Guide editor

The City of Chandler supplies water, wastewater and reclaimed water service across the city, so one utility bills the connection charges for nearly every new Chandler home. A new single-family home pays $9,962 in official connection charges when the developer has already installed the service line: $2,460 for water, $5,989 for wastewater and $1,094 for reclaimed water in system development fees, plus a $419 fee to set a 3/4-inch meter. On a lot where the city has to install the service line and meter box, the meter fee is $1,819 and the total is $11,362. The development fees are charged per home, not by meter size, and they are due when the building permit is issued. For how this compares nationally, see our guide to the cost to connect to city water.

Official Chandler fees in one table

The system development fees come from the city’s System Development Fee Schedule, effective July 1, 2024, adopted under City Code Chapter 38 and A.R.S. 9-463.05; the city’s annual fee report dated September 1, 2026 shows the same amounts. The meter, account and deposit amounts come from Chapter 50 of the Chandler City Code. Rows marked commercial apply to business and landscape meters, not houses.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Electric — Main Extension
ElectricMain ExtensionSRP Line Extension / Service Lateral - Contribution in Aid of Construction—See formulaformula—Official source2026-09-25
General — Account Setup
GeneralAccount SetupUtility account opening fee—$25flat fee—Official source2026-09-25
General — Deposit
GeneralDepositSecurity deposit - single family residential (inside city)—$120flat fee—Official source2026-09-25
General — Other
GeneralOtherCost of solid waste containers (new covered residence)—$150per unit2026-03-02Official source2026-09-30
Reclaimed — Impact
ReclaimedImpactReclaimed Water System Development Fee—$1,094per unit2024-07-01Official source2026-09-25
ReclaimedImpactReclaimed Water System Development Charge - 1" disc meter (commercial)1"$2,735by meter size2024-07-01Official source2026-09-25
Sewer — Impact
SewerImpactWastewater System Development Fee—$5,989per unit2024-07-01Official source2026-09-25
SewerImpactWastewater System Development Charge - 1" disc meter (commercial)1"$14,973by meter size2024-07-01Official source2026-09-25
Water — Impact
WaterImpactWater System Development Fee (does not include meter installation)—$2,460per unit2024-07-01Official source2026-09-25
WaterImpactWater System Development Charge - 1" disc meter (commercial/landscape)1"$6,150by meter size2024-07-01Official source2026-09-25
WaterImpactWater System Development Charge - 3/4" disc meter (landscape only)3/4"$3,690by meter size2024-07-01Official source2026-09-25
Water — Meter Set
WaterMeter SetWater meter installation fee - 1" meter, City installs service line and meter box (Sec. 50-9.1)1"$1,847by meter size—Official source2026-09-25
WaterMeter SetWater meter installation fee - 1" meter, service line and meter box installed by developer (Sec. 50-9.2)1"$447by meter size—Official source2026-09-25
WaterMeter SetWater meter installation fee - 3/4" meter, City installs service line and meter box (Sec. 50-9.1)
City installs service line and meter box
3/4"$1,819by meter size—Official source2026-09-25
WaterMeter SetWater meter installation fee - 3/4" meter, service line and meter box installed by developer (Sec. 50-9.2)
Service line and meter box installed by developer
3/4"$419by meter size—Official source2026-09-25
Water — Other
WaterOtherBackflow prevention device installation fee - service lines up to 1 inch (reclaimed-water residential properties)1"$225flat fee—Official source2026-09-25

How Chandler’s development fees work

Chandler charges a single-family home one “equivalent dwelling unit” per utility, whatever its meter size; businesses and landscape meters pay by meter size. That explains a figure in regional comparisons: Mesa’s August 2025 capacity fee study listed Chandler at $14,315 for a 3/4-inch meter. That is the sum of Chandler’s Table 1 charges for a commercial 3/4-inch meter ($3,690 water, $8,984 wastewater, $1,641 reclaimed), a size the schedule reserves for landscape use, which pays the water fee only. A house pays $9,543.

City of Chandler utility system development fees, effective July 1, 2024 (FY2025-26 annual report confirms)

Fee Single-family home (per unit) Commercial 1″ meter
Water $2,460 $6,150
Wastewater $5,989 $14,973
Reclaimed water $1,094 $2,735
Total $9,543 $23,858

Every house pays the reclaimed water fee: Chandler’s 2024 infrastructure plan treats the reclaimed system as part of both the water and wastewater systems and bases the fee on wastewater demand. The schedule has no separate water resource fee.

The same permit also carries non-utility development fees: $308 fire, $74 police, $110 public buildings, a parks fee of $0 to $5,242 by service area and, in mapped areas, $3,792 for arterial streets. They are left out of the totals here but belong in a permit budget; with everything applied, the schedule’s single-family total runs from $10,035 to $19,069.

Worked example for a single-family home in Chandler

Assumptions: one detached home inside city limits, a building permit issued under the current schedule, a standard 3/4-inch meter and no pavement repair.

Estimated official Chandler water and sewer charges for one new home (checked Sep 25, 2026)

Charge A: subdivision lot, developer-installed line B: lot where the city installs the line C: case A with a 1″ meter
Water system development fee $2,460 $2,460 $2,460
Wastewater system development fee $5,989 $5,989 $5,989
Reclaimed water system development fee $1,094 $1,094 $1,094
Water meter installation (Sec. 50-9) $419 $1,819 $447
Connection subtotal $9,962 $11,362 $9,990
Account opening fee $25 $25 $25
Total $9,987 $11,387 $10,015

Only the meter fee moves. Section 50-9.2 charges $419 where the developer already built the service line from the main to the property line and the meter box; Section 50-9.1 charges $1,819 when the city installs them, plus its cost for any concrete or asphalt repair. Because development fees are flat per home, a 1-inch meter adds just $28 (or is $1,847 in case B).

Chandler-served lots outside city limits pay 1.4 times the meter fee ($587 or $2,547 for 3/4-inch), and the minimum deposit for customers without established credit is $168.

What is not included in Chandler fees

The city’s fees stop at the meter. The builder or owner still pays for the water line from the meter to the house, the sewer lateral, the plumbing permit, and any street cut. National estimates (methodology), which already include trenching:

Where SRP supplies electricity, its Rules and Regulations (revised November 3, 2025) publish no per-foot price; SRP can require the customer to provide trenching and conduit for underground service or pay a Contribution in Aid of Construction. The national estimate for an underground electric service lateral is $6 to $30 per foot, typical $15. Chandler’s Citywide Fee Schedule (effective March 2, 2026) also charges $150 for refuse and recycling containers with each new home’s building permit (its table of contents says $148).

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

Paying Chandler fees: timing and process

Under City Code Section 38-11, system development fees are paid when the building permit is issued. The city will not issue the permit, a water or sewer connection, or a certificate of occupancy until they are paid; if no permit is needed, they are due when the water connection is purchased. Builders of a single-family development can ask to lock the schedule in force at their first building permit for 24 months, and a fee cut during that period still applies.

Opening the utility account costs $25, with 24 hours’ notice for turn-on and $35 extra outside weekday business hours. Customers without established credit post a $120 deposit, refunded after 12 months of on-time payment. A home that also irrigates with reclaimed water pays $225 for a city-installed backflow device on a line up to 1 inch.

Compared with Mesa and Phoenix

Chandler’s water and sewer growth charge is almost the same as Mesa’s and falls between the two ends of the Phoenix range.

Water and wastewater growth charges and meter charge for one new home, 3/4″ meter

City Growth charges Meter or tap charge Varies by area?
Chandler $9,543 (system development fees, July 2024) $419 meter only, or $1,819 with city-installed line No for utilities (parks and streets fees vary)
Mesa $9,528 (capacity fees, 2026) $460 meter installation No, citywide
Phoenix, Balance of City $7,467 (impact fees, June 2025) $1,779 full water service (2008 fee page) Yes, by service area
Phoenix, Northwest $29,322 (impact fees, June 2025) $1,779 Yes

Chandler’s $9,543 is $15 more than Mesa’s full 3/4-inch capacity fee under Mesa Ordinance No. 5970. It is $2,076 more than an infill Phoenix home and $19,779 less than a home in Phoenix’s Northwest area, using the Phoenix schedule effective June 23, 2025.

Upcoming changes in Chandler

Chandler tap fee FAQ

How much are water and sewer connection fees for a new house in Chandler?

A single-family home pays $9,543 in system development fees ($2,460 water, $5,989 wastewater, $1,094 reclaimed water) plus a meter fee. If the developer built the service line, a 3/4-inch meter costs $419, for $9,962. If the city installs the line and meter box, the meter fee is $1,819 and the total is $11,362.

Does meter size change Chandler’s impact fee for a house?

No. Single-family homes pay per dwelling unit. Meter size changes only the installation fee, for example $419 for 3/4-inch and $447 for 1-inch when the developer built the service line. Meter-based development charges apply to commercial and landscape meters.

Is the Chandler impact fee really $14,315?

Not for a house. $14,315 is the total Chandler lists for a commercial 3/4-inch meter, and that size is sold only for landscape use. A single-family home pays $9,543 in water, wastewater and reclaimed water fees under the schedule effective July 1, 2024.

When do I pay Chandler’s system development fees?

At building permit issuance. The city will not issue the permit, the water or sewer connection, or the certificate of occupancy until the fees are paid. Builders of a single-family development can ask to lock the schedule in force at their first permit for 24 months.

Related guides for Chandler

Arizona utility connection costs · Mesa water and sewer capacity fees · Phoenix water and sewer tap fees · Queen Creek tap fees · tap fee vs impact fee · water meter installation cost · sewer lateral cost · utility connection cost calculator

Sources for Chandler figures