New Braunfels Utilities (NBU) Tap & Impact Fees (2026)

Last reviewed: By Utility Cost Guide editor

In New Braunfels, water and wastewater service comes from New Braunfels Utilities (NBU), the city-owned utility that also sells electricity. A new single-family home with the standard 5/8-inch meter, on a lot whose final plat was recorded after January 31, 2023, pays about $26,218 in official NBU charges. That is a $19,448 water impact fee, a $6,244 wastewater impact fee, a $401 meter install fee and a $125 customer service inspection fee. The biggest caveat is the plat recording date. NBU locks the impact fee on the date the final plat was recorded, so a house in a subdivision platted before February 2023 can owe $14,452 less, and in older subdivisions the gap is larger still. For how this compares nationally, see our guide to the cost to connect to city water.

New Braunfels tap and connection charges at a glance

The table lists every New Braunfels row in our database, each linked to the NBU document it comes from. The impact fees appear once for each plat-date schedule (E, D, C, B and A-2), and a home pays only one of them. Schedule E is the current schedule and covers new plats. NBU quotes impact fees per meter: a 5/8″ x 3/4″ meter is 1.0 living unit equivalent (LUE), and a 1-inch meter is 2.5 LUE, so it pays 2.5 times as much. The meter install and inspection fees come from a separate connection-fee sheet. Refundable deposits are kept out of the typical total. Most rows are flagged for review because NBU’s current schedules date from early 2023, although NBU still posts them as current.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
General — Account Setup
GeneralAccount SetupAdministrative Fee (new home construction)—$45flat fee—Official source2026-09-25
Sewer — Deposit
SewerDepositWastewater Service Deposit, newly constructed residence5/8"$100by meter size2023-10-01Official source2026-09-25
Sewer — Impact
SewerImpactWastewater Impact Fee (Maximum Impact Fees Schedule E), 1" meter1"$15,610by meter size2023-02-01Official source2026-09-30
SewerImpactWastewater Impact Fee (Maximum Impact Fees Schedule A-2), 5/8" x 3/4" meter
Final plat recorded Dec 11, 2000 to Mar 31, 2011
5/8"$1,545.23by meter size2023-02-01Official source2026-09-30
SewerImpactWastewater Impact Fee (Maximum Impact Fees Schedule B), 5/8" x 3/4" meter
Final plat recorded Mar 31, 2011 to May 4, 2016
5/8"$1,570by meter size2023-02-01Official source2026-09-30
SewerImpactWastewater Impact Fee (Maximum Impact Fees Schedule C), 5/8" x 3/4" meter
Final plat recorded May 5, 2016 to Nov 12, 2018
5/8"$3,251by meter size2023-02-01Official source2026-09-30
SewerImpactWastewater Impact Fee (Maximum Impact Fees Schedule D), 5/8" x 3/4" meter
Final plat recorded Nov 13, 2018 to Jan 31, 2023
5/8"$3,251by meter size2023-02-01Official source2026-09-30
SewerImpactWastewater Impact Fee (Maximum Impact Fees Schedule E), 5/8" x 3/4" meter
Final plat recorded after Jan 31, 2023 (or before Jun 20, 1987, or unplatted)
5/8"$6,244by meter size2023-02-01Official source2026-09-30
Water — Deposit
WaterDepositWater Service Deposit, newly constructed residence5/8"$60by meter size2023-10-01Official source2026-09-25
Water — Impact
WaterImpactWater Impact Fee (Maximum Impact Fees Schedule E), 1" meter1"$48,620by meter size2023-02-01Official source2026-09-30
WaterImpactWater Impact Fee (Maximum Impact Fees Schedule A-2), 5/8" x 3/4" meter
Final plat recorded Dec 11, 2000 to Mar 31, 2011
5/8"$935.92by meter size2023-02-01Official source2026-09-30
WaterImpactWater Impact Fee (Maximum Impact Fees Schedule B), 5/8" x 3/4" meter
Final plat recorded Mar 31, 2011 to May 4, 2016
5/8"$2,311.40by meter size2023-02-01Official source2026-09-30
WaterImpactWater Impact Fee (Maximum Impact Fees Schedule C), 5/8" x 3/4" meter
Final plat recorded May 5, 2016 to Nov 12, 2018
5/8"$5,321.64by meter size2023-02-01Official source2026-09-30
WaterImpactWater Impact Fee (Maximum Impact Fees Schedule D), 5/8" x 3/4" meter
Final plat recorded Nov 13, 2018 to Jan 31, 2023
5/8"$7,989by meter size2023-02-01Official source2026-09-30
WaterImpactWater Impact Fee (Maximum Impact Fees Schedule E), 5/8" x 3/4" meter
Final plat recorded after Jan 31, 2023 (or before Jun 20, 1987, or unplatted)
5/8"$19,448by meter size2023-02-01Official source2026-09-30
Water — Inspection
WaterInspectionCustomer Service Inspection Fee—$125flat fee2023-03-01Official source2026-09-30
Water — Meter Set
WaterMeter SetMeter Install Fee, 1" meter1"$545by meter size2023-03-01Official source2026-09-30
WaterMeter SetTee-Off Add-On Charge, 1" meter1"$104by meter size2023-03-01Official source2026-09-30
WaterMeter SetMeter Install Fee, 5/8" meter5/8"$401by meter size2023-03-01Official source2026-09-30
WaterMeter SetTee-Off Add-On Charge, 5/8" meter5/8"$89by meter size2023-03-01Official source2026-09-30
Water — Other
WaterOtherExpedite Fee—$190flat fee2023-03-01Official source2026-09-30

What a new New Braunfels house pays: worked example

Assumptions: a detached house served by NBU for both water and wastewater, the standard 5/8″ x 3/4″ domestic meter (the size NBU’s residential new-home packet quotes), no irrigation meter, and the owner paying impact fees when the meter is purchased. The impact fees come from NBU’s Maximum Impact Fees schedules, effective February 1, 2023. The meter and inspection fees come from the Water and Wastewater Connection Fees, effective March 1, 2023.

NBU charges for one home with a 5/8-inch meter, by the date the lot’s final plat was recorded.

Final plat recorded Water impact Wastewater impact Meter install + inspection Total
After Jan 31, 2023 (Schedule E) $19,448.00 $6,244.00 $526.00 $26,218.00
Nov 13, 2018 – Jan 31, 2023 (Schedule D) $7,989.00 $3,251.00 $526.00 $11,766.00
May 5, 2016 – Nov 12, 2018 (Schedule C) $5,321.64 $3,251.00 $526.00 $9,098.64
Apr 1, 2011 – May 4, 2016 (Schedule B) $2,311.40 $1,570.00 $526.00 $4,407.40
Dec 12, 2000 – Mar 31, 2011 (Schedule A-2) $935.92 $1,545.23 $526.00 $3,007.15

The $526 is the $401 meter install fee plus the $125 customer service inspection. The inspection is a state-required check (by the Texas Commission on Environmental Quality) of every new domestic water meter. The date boundaries follow NBU’s Impact Fee Policy (the individual schedule sheets word a few of them slightly differently), and there is one exception. Plats approved before May 5, 2016 and recorded before November 1, 2016 pay Schedule B rates. Schedule E also covers plats recorded before June 20, 1987 and land developed without a plat.

Adjustments:

What New Braunfels’s fees don’t cover

NBU sets the meter, but the customer supplies and installs the meter box, and everything on the private side is a contractor’s price:

National figures are estimates from our benchmark set, not New Braunfels quotes. To combine NBU’s official fees with your own line lengths:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

How and when New Braunfels fees are paid

Upcoming changes in New Braunfels

How New Braunfels compares

For a lot platted after January 2023, New Braunfels costs more to connect than any of the four nearby cities we cover. The figures below come from our other city pages:

NBU’s Schedule E total of $26,218 is above all four, and the water impact fee alone ($19,448) is larger than San Antonio’s highest combined figure. Older plats reverse the picture: a Schedule B lot in New Braunfels pays $4,407.40, less than any of the four current schedules above.

New Braunfels tap fee FAQ

How much are NBU impact fees for a new house?

For a lot whose final plat was recorded after January 31, 2023, NBU charges $19,448 for water and $6,244 for wastewater on a 5/8-inch meter, or $25,692 combined. Add the $401 meter install fee and $125 inspection fee for $26,218.

Why does my builder quote a much lower impact fee?

NBU fixes the rate on the date the subdivision’s final plat was recorded. A lot platted between November 13, 2018 and January 31, 2023 pays $7,989 plus $3,251, or $11,240, instead of $25,692.

Does a bigger meter cost more?

Yes, a lot more. NBU’s impact fees scale with meter size. A 1-inch meter counts as 2.5 LUE, so on a new plat the impact fees are $64,230 instead of $25,692.

When are New Braunfels impact fees paid?

When you apply to buy the water meter or wastewater connection, or at building permit if the owner elects. NBU will not make the connection until the fees are paid.

Are NBU’s impact fees going up?

A 2026 impact fee update is under way, The advisory committee first met on July 23, 2026, and another meeting is scheduled for September 29, 2026. No new schedule had been adopted when we checked on September 25, 2026.

Related: Texas utility connection costs by city · tap fee vs. impact fee · water tap fees · sewer tap fees · cost to run power to a property · utility connection cost calculator

Sources for New Braunfels figures