Water and Sewer Tap Fees by City (2026)
In the 18 cities where our verified fee rows add up to a complete figure, the official water and sewer charges for one new single-family home run from $2,416 in Salt Lake City to $29,322 in Phoenix’s Northwest impact-fee area. Most land between about $5,000 and $15,000. Denver ($17,380 on a 7,000-square-foot lot) and Charlotte ($17,370 when Charlotte Water installs both connections) sit near the top of that range. These are government charges only. The pipe from the property line to the house, trenching, and the plumber’s permit come on top.
The table below builds each total from the published fee schedule and shows the arithmetic, so you can check which charges we counted and swap in your own meter size or lot size. Every figure links to the utility’s own document.
| State | Jurisdictions | Fee rows | Latest verified |
|---|---|---|---|
| AZ | 2 | 17 | 2026-09-24 |
| CA | 2 | 12 | 2026-09-24 |
| CO | 3 | 23 | 2026-09-24 |
| FL | 3 | 14 | 2026-09-24 |
| GA | 1 | 3 | 2026-09-24 |
| MN | 1 | 1 | 2026-09-24 |
| MO | 1 | 3 | 2026-09-24 |
| NC | 2 | 22 | 2026-09-24 |
| NV | 1 | 12 | 2026-09-24 |
| OH | 1 | 14 | 2026-09-24 |
| OR | 1 | 9 | 2026-09-24 |
| SC | 1 | 6 | 2026-09-24 |
| TN | 1 | 6 | 2026-09-24 |
| TX | 7 | 44 | 2026-09-24 |
| UT | 1 | 6 | 2026-09-24 |
| WA | 1 | 8 | 2026-09-24 |
National comparison: official connection charges for a typical new home
Core charges = capacity, impact or system development fees + utility-installed tap or connection fees + meter charges, for the smallest standard residential meter the schedule lists. Excludes building and plumbing permits, inspections, deposits, private service lines and non-utility impact fees (roads, parks, schools). Checked 2026-09-24.
| City | Utility | Meter | Core charges | How we got the number | Effective |
|---|---|---|---|---|---|
| Austin, TX | Austin Water | 5/8″ | $7,700 | $4,800 water + $2,900 wastewater Capital Recovery Fee × 1 service unit, plats recorded on or after 10/1/2023. Meter and tap charges excluded because the FY2027 sheet says they await adoption. Source | Current web page |
| San Antonio, TX | SAWS | 5/8″ | $7,343–$11,528 | Water impact $5,470–$5,987 (by elevation zone) + sewer impact $1,873–$5,541 (by collection area). Private contractors usually install the service, so no SAWS tap fee. Source | Plats from 7/1/2024 |
| Houston, TX | Houston Public Works | 1 SU | $4,383 (needs review) | $2,553.11 water + $1,830.24 wastewater impact fee per service unit. The city’s own pages conflict on whether this rate ended 6/30/2026. Source | Schedule dated 7/1/2026 |
| Fort Worth, TX | Fort Worth Water | 5/8″ | $5,504 | $2,824 water + $2,680 wastewater impact fee for permits issued 10/1/2025–9/30/2026. From 10/1/2026: $2,990 + $2,838 = $5,828. City-installed taps ($3,000+ water, $2,600+ sewer) are extra. Impact · Taps | FY2026 / FY2027 |
| El Paso, TX | El Paso Water | under 1″ | $5,270–$7,340 | $4,380 water service connection + $890 sewer connection = $5,270. Inside the three impact-fee areas, add $1,880 (Northeast), $2,031 (Westside) or $2,070 (Eastside). Connection · Impact | 7/8/2026; impact 5/7/2024 |
| Frisco, TX | Frisco Public Works | 1″ | $5,299 (needs review) | $835 meter fee (includes $150 deposit) + $2,120 water + $2,344 wastewater impact fee from a 2019 table we could not confirm is current. Taps are quoted separately. Meter · Impact | Meter 3/2/2026 |
| McKinney, TX | City of McKinney | 1″ | $3,645 + impact | $1,450 water tap + $1,630 sewer tap + $565 meter set, no pavement work. Impact fees ($2,929 + $2,744 for 1″) come from a table we marked needs review. Taps · Impact | FY2026 |
| Charlotte, NC | Charlotte Water | 5/8″ | $6,727–$17,370 | Utility-installed: $4,407 water connection + $1,453 water SDF + $5,066 sewer SDF + $6,444 sewer connection = $17,370. Developer-built lot: $1,453 + $5,066 SDFs + $208 meter = $6,727. Source | FY2027 |
| Raleigh, NC | Raleigh Water | 5/8″ | $3,960–$14,871 | $1,447 water + $2,223 sewer capital facility fees + $290 meter = $3,960. If the city makes the taps, add $5,756 (3/4″ water) + $5,155 (4″ sewer). Source | FY2027 |
| Nashville, TN | Metro Water Services | 5/8″ | $860 + capacity | $500 water tap + $360 sewer connection. Capacity is $1,375 water + $2,300 sewer per 350-gpd unit of flow; the number of units assigned to a house is set administratively and was not published in the code. Water · Sewer | Metro Code |
| Orlando, FL | OUC + City of Orlando | 5/8″ | $5,323–$9,018 | OUC water SDC $2,325 + city sewer impact $2,537.50, plus either $460 meter set (builder installs line) or $4,155 full OUC service. A $2,950 city sewer lateral applies if needed. OUC · City | OUC 1/2026 |
| Orange County, FL (unincorporated) | Orange County Utilities | 1 ERU | $8,060 | $2,790 water + $5,270 wastewater capital charge per ERU, paid at building permit. Source | County Code 37-5 |
| Tampa, FL | City of Tampa | 3/4″ | $6,415 (needs review) | $2,800 water connection + $1,713 water capacity + $665 meter install (2021 water document) + $1,237 wastewater capacity. CIAC areas use different water charges. Water · Wastewater | Water 2021 |
| Charleston, SC | Charleston Water System | 3/4″ | $11,490 | $4,620 water impact + $6,670 sewer impact + $200 sewer tap. On 1/1/2027 impact fees rise to $5,115 + $8,160. Source | 1/1/2026 |
| Denver, CO | Denver Water + City of Denver | 5/8″ | $17,380 | SDC $3,380 + 7,000 sf × $1.01 = $10,450; + $185 tap + $265 meter + $6,480 sewer permit fee. SDC · Tap and meter · Sewer | 7/1/2026 |
| Colorado Springs, CO | Colorado Springs Utilities | 3/4″ | $14,896 | Lot of 5,000–6,999 sf: $7,243 water development + $5,260 water resource + $1,868 wastewater development + $525 tap. Across all lot sizes the fees alone run $11,012–$20,769. Source | 1/1/2025 (current) |
| Fort Collins, CO | Fort Collins Utilities | 3/4″ | $8,848 + water supply | 7,000 sf lot: $914 + 7,000 × $0.494 = $4,372 water plant investment fee + $4,476 sewer plant investment fee. The water supply requirement ($63,800 per acre-foot cash-in-lieu) is often the largest cost and depends on the lot. Source | Code 8/27/2026 |
| Phoenix, AZ | City of Phoenix | up to 1″ | $7,467–$29,322 | Balance of City, off-project: $4,387 water treatment + $2,009 water resource + $1,071 wastewater treatment. Northwest: $4,387 + $2,009 + $3,753 + $14,046 transmission + $5,127 collection. Add a $95 sewer tap. Impact fees · Sewer tap | 6/23/2025 |
| Tucson, AZ | Tucson Water + Pima County | 5/8″ | $6,423–$7,383 | $1,740 service line and meter (unpaved; $2,700 paved) + $240 CAP water resource fee + $4,443 Pima County sewer connection fee. Service · CAP · Sewer | 7/6/2026; FY2026-27 |
| Las Vegas, NV | LVVWD/SNWA + City of Las Vegas | 5/8″ | $14,946 + frontage | $7,998 SNWA regional connection + $2,371 facilities connection + $1,177 service installation + $165 meter installation + $3,235 city sewer. Frontage charge of $17 per front foot ($1,190 minimum) where it applies. LVVWD · Sewer | 3/1/2026; 1/1/2026 |
| Salt Lake City, UT | SLC Public Utilities | 3/4″ | $2,416 | $1,871 water connection + $545 sewer connection. Meter hardware billed at cost. A proposed increase to $5,577 + $4,300 was pending when we checked. Source | FY2027 |
| Portland, OR | Portland Water Bureau + BES | 5/8″ | $13,947 + sewer SDC | $5,483 water SDC + $8,464 new 1″ service (no paving). Sewer SDC is $623 per drainage fixture unit at 60% for homes; fixture count depends on the plans. New housing permitted 8/15/2025–9/30/2028 may be exempt from SDCs. Water · BES | FY2026-27 |
| Seattle, WA | Seattle Public Utilities | 3/4″ | $14,630–$16,005 | $6,900 water SDC + $2,600 wastewater SDC + $4,800 service installation ($6,175 on an arterial) + $330 meter. SDCs · Installation | 1/1/2026 |
| Sacramento, CA | City of Sacramento DOU | 3/4″ | $13,184–$16,450 | $10,513.13 water development + $2,670.74 sewer development ($5,936.84 in the combined sewer area). City-made taps add $4,507 + $723 meter + $1,781 sewer tap (published for a 1″ service). Source | FY2026-27 |
| Columbus, OH | Columbus Dept. of Public Utilities | 3/4″ | $5,695 | $1,406 water capacity (inside city) + $397 disc meter + $3,892 sewer capacity. A meter-box setting costs $514 plus a $271 yoke instead of the $397 meter. Front-footage charges ($22 water, $45 sewer per foot) may also apply; ask the city. Water · Sewer | 4/1/2026 |
“Needs review” means the official document is older than FY2024 or conflicts with another official page. We show it so you know the fee exists, but confirm the amount with the utility before budgeting.
Why the same house costs 10 times more to connect in one city than another
The spread in the table is mostly about what each fee is buying, not about pipe prices.
- Capacity fees versus taps. A capacity, impact or system development fee buys a share of treatment plants and trunk lines already built. A tap or connection fee pays for the physical work at the main. Salt Lake City’s adopted connection fees are the lowest in the table, and the city has proposed raising them. Phoenix’s Northwest area adds $14,046 in water transmission and $5,127 in wastewater collection impact fees that are $0 in the Balance of City area. See tap fee vs impact fee for the full vocabulary.
- Who does the digging. Charlotte and Raleigh both sell capacity for a few thousand dollars, but when the city makes the taps, the total roughly triples. In San Antonio a private contractor normally installs the service under a SAWS permit, so that cost shows up in your plumber’s bid instead of the utility invoice.
- Formulas. Denver charges by lot square footage, Colorado Springs by lot-size tier, Houston and Austin per service unit, Nashville per 350-gallon-per-day unit, Portland per drainage fixture unit. A bigger lot or a bigger meter changes the answer.
- Split providers. Orlando homes can get water from OUC and sewer from the city; Tucson homes pay Tucson Water and Pima County; Las Vegas homes pay SNWA, LVVWD and a separate sewer agency. Check every provider on your address.
How meter size moves the total
Same utility, same house, larger meter. Official schedules, effective dates as in the table above.
| Utility | Charge | Smaller meter | 1″ meter | Difference |
|---|---|---|---|---|
| Charlotte Water (FY2027) | Water + sewer SDF + water connection | $10,926 (5/8″) | $23,364 | +$12,438 |
| Fort Worth Water (FY2026) | Water + wastewater impact | $5,504 (5/8″) | $13,760 | +$8,256 |
| Las Vegas (SNWA, 3/1/2026) | Regional connection charge | $7,998 (3/4″) | $15,780 | +$7,782 |
| Portland Water Bureau (FY2026-27) | Water SDC | $5,483 (5/8″) | $13,707 | +$8,224 |
| Seattle Public Utilities (2026) | Water + wastewater SDC | $9,500 (3/4″) | $16,150 | +$6,650 |
Charlotte’s 1-inch figure is $7,068 + $3,632 + $12,664; Seattle’s is $11,730 + $4,420. Fort Collins, for example, lists a separate 1-inch residential fire-sprinkler tap. Ask your designer whether the larger meter is truly required before the permit locks it in. The water meter installation cost guide covers the hardware side.
Tap fees and connection charges by state
These live tables list every fee row we hold for each state, including meter sizes and fee types the national table leaves out. Blank amounts mean the source did not publish a verified number; they are not zeros.
Texas
Texas impact fees fall under Local Government Code Chapter 395 and are usually assessed at plat and collected at permit or connection. In Austin and McKinney the plat date picks the fee table; in Fort Worth the building permit date sets the rate. State hub: Texas utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Austin | Austin Water | $4,800 | $2,900 |
| Dallas | Dallas Water Utilities | — | — |
| El Paso | El Paso Water | $5,888 | $1,262 |
| Fort Worth | Fort Worth Water | $2,824 | $2,680 |
| Frisco | City of Frisco Public Works (Water/Sewer) | — | — |
| Houston | Houston Public Works (Houston Water) | — | — |
| McKinney | City of McKinney Water Utilities | $510 | $1,630 |
| San Antonio | San Antonio Water System (SAWS) | $5,470 | $5,541 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
North Carolina
Charlotte and Raleigh both split charges into a capacity fee and a physical connection fee. Hub: North Carolina utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Charlotte | Charlotte Water | $8,728 | $11,510 |
| Raleigh | Raleigh Water (City of Raleigh Public Utilities) | $1,737 | $7,378 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Tennessee
Nashville’s water capacity charge is due before the connection permit, and unpaid tap or capacity fees can become a lien.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Nashville (Metro Nashville-Davidson County) | Metro Water Services (Metro Nashville) | $1,875 | $2,660 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Florida
Addresses inside Orlando, in unincorporated Orange County and in Tampa pay different providers. Hub: Florida utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Orange County | Orange County Utilities (OCU) | $2,790 | $5,270 |
| Orlando | Orlando Utilities Commission (OUC) | $6,480 | $2,537.50 |
| Tampa | City of Tampa Wastewater Department | — | $1,237 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
South Carolina
Charleston Water System raises impact fees every January 1; the 2027 amounts are already published.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Charleston | Charleston Water System | $4,620 | $6,870 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Colorado
All three Colorado cities tie at least one fee to lot size, and Fort Collins adds a water-rights requirement. Hub: Colorado utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Colorado Springs | Colorado Springs Utilities | $525 | $1,868 |
| Denver | City and County of Denver DOTI - Wastewater (SUDP permitting; collects SAFE + Metro Water Recovery fees) | $450 | $12,960 |
| Fort Collins | Fort Collins Utilities | — | $4,476 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Arizona
Phoenix impact fees depend on the planning area; Tucson’s sewer fee is paid to Pima County and rises every July 1. Hub: Arizona utility connection costs.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Phoenix | City of Phoenix Development Impact Fees (Planning & Development Dept.) | — | $95 |
| Tucson | Pima County Regional Wastewater Reclamation Department | $2,540 | $4,443 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Nevada
The SNWA regional connection charge adjusts every March 1. Many “Las Vegas” addresses are unincorporated Clark County with a different sewer agency.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Las Vegas | City of Las Vegas (Building & Safety - Sewer Connection Charges) | $10,369 | $3,235 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Utah
Salt Lake City had a pending increase to water, sewer and stormwater impact fees when we checked; the table shows the adopted schedule.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Salt Lake City | Salt Lake City Department of Public Utilities | $1,871 | $545 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Oregon
Portland’s sewer SDC is priced per drainage fixture unit, and some new housing permits through 9/30/2028 may be exempt.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Portland | Portland Environmental Services (BES) | $5,483 | $623 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Washington
Seattle added wastewater and drainage SDCs on January 1, 2026; before that only water carried an SDC.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Seattle | Seattle Public Utilities | $11,700 | $2,600 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
California
Sacramento homes pay only one of the two city sewer development fees, depending on the sewer area. Homes on regional sewer pay a separate agency we have not yet collected.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Sacramento | City of Sacramento Department of Utilities | $10,513.13 | $7,717.84 |
| San Diego | City of San Diego Public Utilities Department | — | — |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Ohio
Columbus charges more for water capacity in contract suburbs than inside the city, and lists per-foot front-footage charges for water and sewer.
| City | Provider | Water typical new home* | Sewer typical new home* |
|---|---|---|---|
| Columbus | City of Columbus Department of Public Utilities (Columbus Water & Power) | $1,982 | $3,892 |
* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.
Method and downloads
We read each utility’s current fee schedule, ordinance or tariff and record the fee name, amount, basis, meter size, effective date and source link exactly as published. Rows older than FY2024, or contradicted by another official page, are marked needs review. The national table adds only charges a typical new single-family home would pay and states every assumption in the “How we got the number” column. National planning figures used elsewhere on the site are labeled estimates and explained on the methodology page; see also our source and data policy and the full fee database.
Download the fee rows as CSV or JSON. Each row carries its source URL, effective date, verification date and status.
Related tools and guides
Price the rest of the job with the utility connection cost calculator. Guides: water tap fee · sewer tap fee · tap fee vs impact fee · water meter installation cost · new construction utility costs · cost to bring utilities to land.
Frequently asked questions
What is the average water and sewer tap fee for a new house?
There is no official national average. Among the 18 cities in our table with complete verified figures, core water and sewer charges run from $2,416 (Salt Lake City) to $29,322 (Phoenix Northwest), with most between about $5,000 and $15,000. For a place we don’t cover, our national estimate for combined water and sewer impact fees is $3,500–$25,000, with $7,500 as a planning figure.
Is a tap fee the same as an impact fee?
Usually not. A tap or connection fee pays for the physical connection to the main; an impact, capacity or system development fee buys a share of plant and pipe capacity. Denver Water calls its system development charge a “tap fee” and charges a separate $185 for the physical tap, so read the fee definitions rather than the label.
Who pays the tap fee, the buyer or the builder?
The utility bills whoever applies for the permit or meter, often the builder or an owner-builder. On a custom build, the contract should say whether fees are in the base price or billed as an allowance.
Why does meter size change the fee so much?
Many utilities multiply the base fee by a meter-size factor. Austin and Fort Worth count a 1-inch meter as 2.5 service units, so Fort Worth’s FY2026 impact fees go from $5,504 for a 5/8-inch meter to $13,760 for a 1-inch meter.
Do I pay the tap fee again if I tear down and rebuild?
Often not in full. Seattle and Sacramento give credit for existing service, and Nashville does not charge a new tap fee when you reuse an existing tap of the same or smaller size. Ask for the credit in writing before the old meter is removed.
Why did tap fees go up in my city?
Many schedules now rise on a set date: Charleston every January 1, the SNWA charge every March 1, Pima County every July 1, and Denver Water in two 2026 steps (its first system development charge change since 2013). Check the effective date column above against your permit date.
Does the plat date matter?
In some Texas cities, yes. Austin’s Capital Recovery Fee for a plat recorded on or after 10/1/2023 is $7,700 per service unit, versus $7,200 for plats from 10/1/2018 to 9/30/2023. San Antonio’s current impact fees apply to plats recorded on or after 7/1/2024.