Water Connection Cost in 2026: Official Fees by City and What You’ll Pay

Last reviewed: By Utility Cost Guide editor

Connecting a new single-family home to city water costs $875 to $19,849 in utility charges across the 36 cities in our city table (median $3,108), before any private plumbing between the meter and the house. In the 15 cities of our first comparison below it runs roughly $1,700 to $16,000. The low end is a place like Columbus, where the capacity charge plus a 5/8-inch meter comes to $1,741 (Tucson is next at $1,980, with the service line and meter included). The high end is Sacramento, where a 1-inch service adds up to about $16,184 in FY2026-27 development, tap and meter fees. Most of the spread comes from one line item: the capacity or impact fee, which is a charge for buying into the water system, not for the pipe itself.

Below: published charges for a standard residential meter in 15 cities, what each total leaves out, and how to build your own estimate.

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

What a water connection bill is made of

Utilities split the cost of a new connection into three to six separate charges. Their names differ from place to place, and that makes it easy to miss one when you compare cities.

Sewer is a separate set of fees, often from a different agency. For that side, see sewer connection cost.

Official water connection totals in 15 cities

Utility charges for one new single-family water connection at the smallest standard residential meter each utility lists. Totals are our sums of the published line items shown; private plumbing, the building permit and sewer are excluded. Checked 2026-09-24.

City (utility) Meter Items added Total Effective / source
Columbus (Division of Water) 5/8″ Capacity charge $1,406 + meter $335 (with a meter-box setting the meter is $451, plus a $241 yoke) $1,741 April 1, 2026
Tucson (Tucson Water) 5/8″ Service line + meter $1,740 (unpaved) + CAP water resource fee $240 $1,980 July 6, 2026
Salt Lake City (SLC Public Utilities) 3/4″ Water connection fee $1,871 + meter inspection $120 (meter billed at cost) $1,991 + meter FY2027 schedule
Austin (Austin Water) 5/8″ Capital recovery fee $4,800 (plat on/after 10/1/2023) + meter $111.30 + tap $200.22 + inspection $107.90* $5,219 impact fee; FY2027 sheet*
Fort Worth (Fort Worth Water) 5/8″ Impact fee $2,990 (permit on or after 10/1/2026) + city 1″ tap $3,000 (paved, same side) $5,990 FY2027; tap code
Charlotte (Charlotte Water) 5/8″ Water connection fee $4,407 + system development fee $1,453 $5,860 FY2027 (July 1, 2026)
Orlando (OUC) 5/8″ OUC-installed service $4,155 + system development charge $2,325 $6,480 Jan. 1, 2026
San Antonio (SAWS) 5/8″ Water impact fees $5,470–$5,987 by elevation zone + SAWS service-line estimate $1,400–$2,100 $6,870–$8,087 July 1, 2024 plats; 2024 Service Regs
Raleigh (Raleigh Water) 5/8″ meter, 3/4″ tap City tap $5,756 + capital facility fee $1,447 + meter $290 $7,493 FY2027
Colorado Springs (CSU) 3/4″ Water development charge $5,297–$10,949 + water resource fee $3,847–$7,952 (both by lot size) + tap $525 + inspection $160 $9,829–$19,586 Jan. 1, 2025 (current); tariff
Denver (Denver Water) 5/8″ SDC $3,380 + $1.01/sq ft on a 7,000 sq ft lot ($7,070) + meter $265 + tap $185 + inspection $155 $11,055 July 1, 2026; other fees
Seattle (SPU) 3/4″ Water SDC $6,900 + service installation $4,800 (non-arterial street) + automated meter installation $330 $12,030 SDC, Jan. 1, 2026; installation charges
Las Vegas (LVVWD / SNWA) 5/8″ Regional connection $7,998 + facilities $2,371 + frontage minimum $1,190 + service installation $1,177 + application $140 + inspection $185 + meter installation $165 $13,226 + meter March 1, 2026
Portland (Water Bureau) 5/8″ SDC, 1″ service SDC $5,483 + new 1″ service with meter $8,464 (no paving) $13,947 FY2026-27
Sacramento (Dept. of Utilities) 1″ Water development fee $10,953.50 + easement tap $4,507 + meter $723 $16,184 July 2026–Jan. 2027

*Austin’s meter, tap and inspection amounts come from the FY2026-27 fee sheet, which the utility marks as pending final adoption. Treat them as provisional. The $4,800 capital recovery fee is the published current rate.

The totals are not equal in scope. Charlotte, Orlando, Raleigh, Seattle, Portland and Tucson include a utility-installed service line to the property line. Columbus, Salt Lake City and Denver mostly do not, so your contractor’s cost for that segment comes on top. Sacramento’s easement-tap price assumes your contractor digs and restores the pavement. Compare scope before you compare dollars.

Cost to connect to city water by city (2026)

Water-only utility charges for a typical new single-family home: tap or service connection, meter and water capacity or impact fee, at the smallest standard residential meter each utility lists. Sorted low to high; 36 cities, range $875 to $19,849, median $3,108. Each total is the sum of the line items on that city’s page; sewer, power, permits and the private service line are excluded.

City Utility Water connection total Effective Source
Fort Wayne, IN Fort Wayne City Utilities $875.17 Oct 1, 2026 Fort Wayne City Utilities schedule
Savannah, GA Savannah Water Resources $1,125 Jan 1, 2026 Savannah Water Resources schedule
New Haven, CT South Central Connecticut RWA $1,210 Jul 2, 2026 South Central Connecticut RWA schedule
Marietta, GA Marietta Power & Water $1,500 Jan 1, 2022 Marietta Power & Water schedule
Mobile, AL MAWSS $1,705 Jan 1, 2026 MAWSS schedule
Birmingham, AL Central Alabama Water $1,768 Current schedule, checked Sep 24, 2026 Central Alabama Water schedule
Louisville, KY Louisville Water $1,825 Jan 1, 2026 Louisville Water schedule
Greensboro, NC Greensboro Water Resources $1,895 Jul 1, 2026 Greensboro Water Resources schedule
Concord, NC Concord Water Resources $1,896 Aug 13, 2026 Concord Water Resources schedule
Des Moines, IA Des Moines Water Works $1,960 Jan 1, 2026 Des Moines Water Works schedule
Bowling Green, KY BGMU $2,000 Oct 1, 2025 BGMU schedule
Meridian, ID City of Meridian $2,130.44 Oct 1, 2026 City of Meridian schedule
Lincoln, NE Lincoln Water System $2,403 Jan 1, 2026 Lincoln Water System schedule
Wilmington, NC CFPUA $2,585 Jul 1, 2026 CFPUA schedule
Chandler, AZ City of Chandler $2,879 Jul 1, 2024 City of Chandler schedule
Queen Creek, AZ Queen Creek Utilities $2,882 Jan 5, 2026 Queen Creek Utilities schedule
Virginia Beach, VA Virginia Beach Public Utilities $2,900 Current schedule, checked Sep 25, 2026 Virginia Beach Public Utilities schedule
Providence, RI Providence Water $2,955.88 Jul 1, 2026 Providence Water schedule
Cedar Park, TX City of Cedar Park $3,260 Dec 14, 2023 City of Cedar Park schedule
Huntsville, AL Huntsville Utilities $3,281 Nov 1, 2024 Huntsville Utilities schedule
Durham, NC City of Durham $3,312 Jul 1, 2026 City of Durham schedule
Wichita, KS City of Wichita $3,332 Jul 1, 2025 City of Wichita schedule
Fayetteville, AR Fayetteville Water $3,482 Jul 1, 2026 Fayetteville Water schedule
Fort Myers, FL Fort Myers Utilities $3,503.39 May 4, 2026 Fort Myers Utilities schedule
Cincinnati, OH Greater Cincinnati Water Works $4,331 Jan 1, 2026 Greater Cincinnati Water Works schedule
Sarasota County, FL Sarasota County Utilities $4,465.17 Aug 25, 2026 Sarasota County Utilities schedule
Greenville, SC Greenville Water $4,680 Jan 1, 2026 Greenville Water schedule
Tacoma, WA Tacoma Water $5,904 Feb 1, 2026 Tacoma Water schedule
Port St. Lucie, FL PSL Utility Systems $7,025 Current schedule, checked Sep 24, 2026 PSL Utility Systems schedule
Celina, TX Celina Utilities $7,295 Aug 12, 2025 Celina Utilities schedule
Fresno, CA Fresno DPU $7,927.83 Jul 1, 2026 Fresno DPU schedule
Provo, UT Provo City Water $8,137.10 Jul 1, 2026 Provo City Water schedule
Mesa, AZ City of Mesa $8,179 Jan 1, 2026 City of Mesa schedule
Leander, TX City of Leander $9,102 Aug 17, 2023 City of Leander schedule
Gilbert, AZ Town of Gilbert $14,136 Jul 1, 2024 Town of Gilbert schedule
New Braunfels, TX New Braunfels Utilities $19,849 Mar 1, 2023 New Braunfels Utilities schedule

What these totals include and leave out. Each figure is what the water utility itself publishes for the connection: the tap or service installation where the utility does it, the meter, and the capacity, system development or impact fee. Where a utility charges only a tap and meter and no impact fee, the total is small; where it charges a large impact fee, that fee is most of the total. Not included are the private service line from the meter to the house, trenching on your lot, the plumbing permit, account deposits and sewer charges. Some cities assume the developer already built the service line, so the total can be lower than the same utility would charge if it installed the line. For those costs, see what a 100-, 300- or 500-foot water line costs and the water meter installation cost guide.

Why one city costs several times another

Capacity fees follow growth costs, not pipe length

In Tucson the only capacity-type charge we found is the $240 CAP water resource fee. In Sacramento the FY2026-27 water development fee for a 1-inch meter is $10,953.50. Neither number depends on how far your house sits from the main. They reflect each utility’s plan for paying for new supply and treatment. That is why moving one town over can change your bill more than any site condition can.

Lot size and location formulas

Two utilities in the table price water by lot size. Denver Water adds $1.01 per square foot of lot (first 22,000 sq ft) to its $3,380 base for applications paid on or after July 1, 2026, so a 7,000 sq ft lot pays $3,380 + (7,000 × $1.01) = $10,450 before the meter. Outside the City and County of Denver the base is $4,740 plus $1.42 per sq ft. Colorado Springs Utilities tiers both its development charge and its water resource fee by lot size, which is why its range in the table runs from $9,829 to $19,586. Phoenix does the same thing by area rather than lot size: its 2025 water treatment impact fee is $4,387 everywhere, but the water transmission fee is $14,046 in the Northwest and similar growth areas and $0 in the Balance of City (City of Phoenix, effective June 23, 2025).

Who installs the service

Orlando shows the effect of scope inside one tariff. OUC charges $4,155 when it installs the connection, service line, curb stop, meter and box for a 5/8-inch service, and $460 when your contractor installs the connection and line and OUC only sets the meter (OUC Water Tariff, Jan. 1, 2026). The $3,695 difference does not disappear. It moves to your contractor’s bid.

Paving and street type

Cutting pavement costs more. Tucson Water’s 5/8-inch service is $1,740 unpaved and $2,700 with pavement replacement. Seattle’s 3/4-inch installation is $4,800 on a non-arterial street and $6,175 on an arterial. Portland’s 1-inch service is $8,464 without paving and $9,701 with it.

Worked example: building your own estimate

Take a new house in Charlotte on a lot with a water main in the street, a 5/8-inch meter, and the house set back 70 feet from the meter box.

Utility charges: $4,407 + $1,453 = $5,860. With the private line and permit: $5,860 + $3,500 + $300 = $9,660. Using the national low and high service-line rates of $30 and $150 per foot, the private line alone ranges from $2,100 to $10,500. For deeper setbacks, see what a 300- or 500-foot water line costs. The per-foot and permit figures are national estimates from our benchmark method, not Charlotte prices. Sewer adds Charlotte’s sewer fees; see the Charlotte tap fee page.

If you want this math done with your own footage and city, the calculator above, or the full utility connection cost calculator, combines local fee rows with per-foot estimates.

National estimates when your city is not listed

For a planning number before you have the utility’s schedule, our national estimates are:

These are national estimates built from published schedules and labeled secondary data; see how the benchmarks were built. A utility’s own schedule replaces them.

Timing traps that change the bill

Related guides

Tap fees in detail: water tap fee and tap fee vs impact fee. Physical work: water service line cost, utility trenching cost, water meter installation cost. No main nearby: utility extension cost and well vs city water. All fees side by side: tap fees by city. State overviews: Texas, North Carolina, Colorado, Arizona, Florida.

Frequently asked questions

How much does it cost to connect a new house to city water?

In the 15 cities above, the utility’s charges for a standard single-family meter run from about $1,741 (Columbus, which does not install the service line) to about $16,184 (Sacramento, 1-inch meter), with Charlotte’s FY2027 total of $5,860 near the middle. Add the private line from the meter to the house, which our national estimate puts at $30 to $150 per foot, and a plumbing permit.

Is a water tap fee the same as an impact fee?

No. The tap fee pays for the physical connection, and the impact, capacity or system development fee pays for a share of plants and supply. Charlotte charges both: a $4,407 connection fee and a $1,453 system development fee for a 5/8-inch meter. Denver Water blurs the terms by calling its system development charge a “tap fee,” while the physical tap is a separate $185. See tap fee vs impact fee.

Who pays the water connection fees, the buyer or the builder?

The utility bills whoever applies for the service, which on new construction is the builder or the owner-builder. On a finished spec home the fees are part of the price, not a separate closing item. If you are building on your own lot, expect them before the building permit or meter set. In Orange County, Florida, the water capital charge is due right before the building permit.

Does a bigger meter cost more to connect?

Usually a lot more, because capacity fees scale with meter size. Charlotte’s FY2027 system development fee is $1,453 for 5/8-inch and $3,632 for 1-inch, and its connection fee rises from $4,407 to $7,068. Austin multiplies its $4,800 capital recovery fee by 2.5 for a 1-inch meter, or $12,000. The meter cost guide has more examples.

Do I pay again if I tear down and rebuild a house?

Often not in full. Seattle gives SDC credit for an existing service. Sacramento credits existing water connections against its development fee. Nashville does not charge the tapping fee when an existing tap of the same size is reused. Portland charges $523 to activate an existing 1-inch service instead of $8,464 for a new one. Ask for the credit in writing before demolition.

Why are water connection fees going up in 2026?

Several utilities re-priced growth charges at once. Denver Water changed its SDC for the first time since 2013 and phased it in on January 1 and July 1, 2026. SNWA’s regional connection charge rises every March 1, and Charleston steps its impact fees every January 1. Salt Lake City has a pending proposal to roughly triple its 3/4-inch water fee.