Tap Fee vs. Impact Fee: Connection, Capacity, SDC and Other Terms Explained

Last reviewed: By Utility Cost Guide research team

A tap fee pays for the physical connection to a water or sewer main, or for the utility’s inspection of it. An impact fee pays for your share of the plants, tanks and trunk lines that serve the whole system. In the 2026 schedules we track, sewer tap fees run from $95 in Phoenix to $6,444 in Charlotte, while sewer impact-type fees run from $372 in El Paso Water’s Northeast impact fee area (effective 5/7/2024) to $6,670 per ERU in Charleston, and a new house usually pays both.

The confusion comes from vocabulary. Utilities use at least a dozen names for these two ideas, and some use the “wrong” one: Denver Water calls its capacity charge a tap fee, and Las Vegas calls its capacity charge a connection charge. This guide sorts every term into one of two buckets, shows how units like EDU and meter multipliers turn a published rate into your bill, and explains why the date on your plat can matter more than the date on your permit.

The two buckets

Physical connection charges Capacity (buy-in) charges
Common names Tap fee, tapping fee, connection fee, service installation fee, service connection charge, meter set fee Impact fee, capacity fee or charge, system development charge or fee (SDC/SDF), plant investment fee, capital recovery fee, capital facility fee, capital charge, development charge, SAC
Pays for Cutting into the main, the service line or lateral to the property line, the meter box, street repair, or the inspection of a contractor’s work Existing or planned treatment plants, water supply, storage, transmission mains, interceptors
Priced by Pipe size, street surface, distance, time and materials Meter size or equivalent units (EDU, ERU, SU), sometimes lot size or fixture units
Can your contractor reduce it? Often, where the utility lets a licensed contractor do the work No; it is owed regardless of who does the work
Typical size for a house $95 to $6,444 for sewer in our data A few hundred dollars to more than $20,000 for water and sewer combined

Nationally, our national estimate puts water and sewer capacity-type fees combined at $3,500 low, $7,500 typical and $25,000 high for a single-family home, and sewer tap fees at $200, $3,000 and $6,100. A 2019 national survey used in that estimate found average single-family fees of $4,249 for water and $3,896 for sewer among places that charge them; many places charge none.

Glossary of terms

Tap fee

The charge for tapping the main and, depending on the utility, installing the service to the property line. Fort Worth’s city-installed 4-inch sewer tap costs $2,600 to $7,900 depending on street surface and side of the street; Charleston Water System’s $200 sewer tap fee only covers inspecting a contractor-made connection.

Connection fee

Usually a physical charge, sometimes a capacity charge. Charlotte Water’s water connection fee ($4,407 for 5/8″, FY27) pays for a utility-installed service. Pima County’s sewer connection fee ($4,443, FY2026-27) and the City of Las Vegas sewer connection charge ($3,235 per ERU, 2026) are buy-in charges; no pipe work is included.

Impact fee

A one-time charge on new development to pay for growth-related capital facilities. Texas cities, Charleston and Phoenix use this name. In Texas, impact fees are governed by Local Government Code Chapter 395 and are usually assessed at plat and collected at permit or connection.

Capacity fee or capacity charge

The same concept, named for the plant capacity being reserved. Tampa’s wastewater capacity fee is $1,237 per ERU; Columbus’s sewer system capacity charge is $3,892 for a 3/4-inch tap; Nashville charges $2,300 per sewer capacity unit.

System development charge (SDC) or fee (SDF)

Common in the Carolinas, Florida, Colorado and the Northwest. Charlotte’s sewer SDF is $5,066 (5/8″, FY27); OUC’s water SDC is $2,325 for a single-family home; Seattle added wastewater and drainage SDCs on 1/1/2026; Portland charges water SDCs by meter size.

Plant investment fee (PIF)

Fort Collins’s term. The sewer PIF is $4,476 per single-family dwelling; the water PIF is $914 for the first 3/4-inch tap plus $0.494 per square foot of lot. Fort Collins also requires water rights or a cash payment in lieu, which is a third category altogether.

Capital recovery fee

Austin Water’s name for its impact fee: $4,800 water and $2,900 wastewater per service unit on lots platted on or after 10/1/2023.

Capital facility fee

Raleigh’s term: $1,447 water and $2,223 sewer for a 5/8-inch meter in FY27.

Capital charge

Orange County Utilities, Florida: $2,790 per ERC water and $5,270 per ERU wastewater, paid before the building permit.

Sewer Availability Charge (SAC)

The Twin Cities regional charge set by the Metropolitan Council: $2,485 per SAC unit in 2026, with a single-family home counted as one unit of 274 gallons per day. The council bills the city, which may pass it on at building permit.

How each city names its charges

Local fee names from official schedules in our database, mapped to the concept they represent. Amounts are single-family examples; follow the city page for full detail and sources. Checked 2026-09-24.

City Utility Local term Concept Example
Austin, TX Austin Water Capital Recovery Fee Capacity $4,800 water + $2,900 ww per SU
San Antonio, TX SAWS Impact fee (flow, system development, water supply) Capacity $5,470 to $5,987 water, 5/8″
Fort Worth, TX Fort Worth Water Impact fee / tap fee Capacity / physical $2,824 water impact, 5/8″
El Paso, TX El Paso Water Water Service Connection Charge Physical (tap, line behind curb, meter box) $4,380, meter under 1″
Charlotte, NC Charlotte Water Connection fee / System Development Fee Physical / capacity $4,407 / $1,453 water, 5/8″ FY27
Raleigh, NC Raleigh Water Tap fee / Capital Facility Fee Physical / capacity $5,155 sewer tap / $2,223 sewer CFF
Nashville, TN Metro Water Services Tapping or connection fee / capacity charge Physical / capacity $360 sewer / $2,300 per unit
Orlando, FL OUC (water) Service connection charge / System Development Charge Physical / capacity $4,155 / $2,325, 5/8″
Tampa, FL Tampa Wastewater Capacity fee Capacity $1,237 per ERU
Charleston, SC Charleston Water System Tap fee / impact fee Inspection / capacity $200 / $6,670 sewer (2026)
Denver, CO Denver Water System Development Charge (called a “tap fee”) / tap installation fee Capacity / physical $3,380 + $1.01/sq ft of lot; $185 tap
Colorado Springs, CO Colorado Springs Utilities Development charge, water resource fee / tap permit Capacity / physical $1,868 wastewater; $525 tap
Fort Collins, CO Fort Collins Utilities Plant Investment Fee; Water Supply Requirement Capacity; water rights $4,476 sewer PIF
Phoenix, AZ City of Phoenix Impact fees; Water Resource Acquisition Fee Capacity $4,387 water treatment
Tucson, AZ Pima County RWRD Sewer connection fee Capacity $4,443 (FY2026-27)
Las Vegas, NV SNWA / LVVWD Regional connection charge; facilities connection charge Capacity $7,998 + $2,371, 5/8″
Salt Lake City, UT SLC Public Utilities Connection fee (impact fees proposed) Per-dwelling charge; hardware at cost $1,871 water 3/4″; $545 sewer
Portland, OR Portland Water / BES System development charge Capacity $623 per sewer fixture unit (homes pay 60%)
Seattle, WA Seattle Public Utilities System development charge / installation charge Capacity / physical $6,900 water + $2,600 ww, 3/4″
Sacramento, CA Sacramento Dept. of Utilities Development fee / service installation fee Capacity / physical $10,513.13 water, 3/4″
Columbus, OH Columbus DPU System capacity charge Capacity $3,892 sewer, 3/4″
Minneapolis, MN Metropolitan Council Sewer Availability Charge (SAC) Capacity $2,485 per unit (2026)

Units: EDU, ERU, ERC, SU, LUE

Capacity fees are priced per unit of demand so that a duplex or a restaurant can be charged fairly against a house. The names differ; the idea is the same. One unit is usually the demand of one single-family home:

If a schedule says “per EDU” and does not tell you how many units your house is, ask. Nashville’s code sets a price per unit but we could not confirm how many units it assigns a single-family home, so we do not publish a Nashville total.

Meter-size multipliers

Most utilities scale capacity charges by the water meter, because a bigger meter can draw more. The common ratio is 1.0 for 5/8 inch, 1.5 for 3/4 inch and 2.5 for 1 inch. Austin and Fort Worth publish those multipliers directly, and the official rates confirm the pattern elsewhere:

Published fee at each meter size, and the ratio to the smallest size (our arithmetic).

Utility and fee 5/8″ 3/4″ 1″ Ratio
Fort Worth water impact (FY2026) $2,824 $4,236 $7,060 1 : 1.5 : 2.5
Raleigh sewer capital facility (FY27) $2,223 $3,335 $5,558 1 : 1.5 : 2.5
Portland water SDC (FY2026-27) $5,483 $8,224 $13,707 1 : 1.5 : 2.5
Charlotte sewer SDF (FY27) $5,066 n/a $12,664 1 : 2.5
Seattle wastewater SDC (2026) n/a $2,600 $4,420 1 : 1.7 (from 3/4″)
SNWA regional connection charge (3/1/2026) $7,998 $7,998 $15,780 1 : 1 : 2.0
Pima County sewer connection (FY2026-27) $4,443 $4,443 $4,443 flat

Worked example, Charlotte FY27. A home with a 5/8-inch meter pays a water connection fee of $4,407, water SDF of $1,453 and sewer SDF of $5,066: $10,926, plus the $6,444 sewer connection for $17,370. If a fire sprinkler system requires a 1-inch meter, the same three water and SDF lines become $7,068 + $3,632 + $12,664 = $23,364, and the total with the sewer connection is $29,808. The meter size alone adds $12,438.

Some charges ignore meter size and use something else. Denver Water’s SDC adds $1.01 per square foot of lot (first 22,000 sq ft, from 7/1/2026) to a $3,380 base, so a 7,000-square-foot lot pays $3,380 + $7,070 = $10,450. Colorado Springs Utilities scales its water development charge by lot size, from $5,297 to $10,949 for a 3/4-inch home.

Plat date vs. permit date

In several Texas cities, the date the subdivision plat was recorded decides which impact fee table applies, not the date you pull a building permit.

For a buyer, an older plat can mean a lower fee, so ask the seller or title company for the recorded plat date. For a builder, a permit pulled before a scheduled increase can lock in the lower rate where the permit date controls.

When each fee is paid

Related guides

See the utility connection cost calculator, tap fees by city, water tap fee, sewer tap fee, water meter installation cost, sewer connection cost, and state guides for Texas, North Carolina, Colorado, Arizona and Florida.

Frequently asked questions

What is the difference between a tap fee and an impact fee?

A tap fee pays for the physical connection or its inspection; an impact fee pays for system capacity such as treatment plants. Charleston shows the gap clearly: a $200 sewer tap fee and a $6,670 sewer impact fee per ERU in 2026.

Is a system development charge the same as an impact fee?

Functionally, yes. Both are one-time buy-in charges for capacity, priced by meter size or equivalent units. The name depends on the state and the utility; Charlotte calls it a system development fee, Austin a capital recovery fee, Fort Collins a plant investment fee.

Why does Denver Water call its SDC a tap fee?

That is the utility’s own wording. The charge Denver Water calls a tap fee is its system development charge, $3,380 plus $1.01 per square foot of lot from 7/1/2026. The physical tap is a separate $185 installation fee.

What is an EDU in utility fees?

An equivalent dwelling unit is the demand of one typical single-family home, used to price capacity for every other building. SAWS defines it as 290 gallons per day for water and 200 for sewer; a 3/4-inch meter counts as 1.5 EDUs.

Can impact fees be waived or reduced?

Sometimes, through specific programs. Charleston Water System waives its $500 engineering charge for qualified affordable housing, Denver Water offers a 20% SDC credit for homes that cut water use by at least 20%, and Portland may exempt new housing permitted from 8/15/2025 to 9/30/2028 from SDCs.

Who pays the tap fee and impact fee, the builder or the buyer?

The permit applicant pays the utility, which is usually the builder on new construction. The builder then recovers it in the home price. On a vacant lot you build yourself, you pay both directly.

Does a bigger water meter increase impact fees?

In most places, yes. The common multiplier is 1.5 for a 3/4-inch meter and 2.5 for a 1-inch meter; in Charlotte, moving from 5/8 inch to 1 inch adds $12,438 in FY27 fees.