Georgia Utility Connection Costs (2026): Tap Fees by City

Last reviewed: By Utility Cost Guide editor

In Georgia, official one-time water and sewer connection charges for a new single-family home with a 3/4-inch meter installed by the utility range from $2,155 in Savannah to $7,525 in Marietta, more than three times as much, with Atlanta in between at about $2,295. The three cities do not even price the same things: Atlanta has had no separate water or sewer impact fee since 1995 and mostly charges for the meter and sewer permits; Savannah’s 2026 Revenue Ordinance adds a reclaimed water fee on top of its tap-ins; Marietta has no capacity/impact fee structured by home size, but its flat $6,000 combined sewer charge dwarfs the other two cities’ sewer-side costs. Our database covers Atlanta, Savannah and Marietta so far. Other Georgia utilities are not yet collected, and we say so rather than guess.

Official fees in Georgia

The table below lists every verified Georgia fee row in our database, with utility, meter size and a link to the source document. Atlanta’s Department of Watershed Management (DWM) and Savannah’s Water & Sewer Bureau both price water and sewer as separate line-item charges rather than a single capacity buy-in. Marietta Power & Water is different again: its water side is priced by meter size, but its sewer side is two flat, meter-independent charges — a Sewer Development Fee and a 6-inch tap installation fee — that add up to $6,000 no matter the meter size or house size.

CityProviderWater typical new home*Sewer typical new home*
AtlantaCity of Atlanta Department of Watershed Management—$600
MariettaCity of Marietta Power & Water$1,500$6,000
SavannahCity of Savannah Water Resources$1,125$400

* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.

City comparison

2026 official one-time water + sewer charges for one single-family home, 3/4-inch meter (sources: Atlanta water and sewer tap fees; Savannah water and sewer tap-in fees; Marietta tap and sewer development fees).

Situation Atlanta Savannah Marietta
New home, city taps the main, 3/4″ meter $2,295 $2,155 $7,525
Lowest official one-time total available $1,495 $955 $6,525

How the rows are built. Atlanta: water meter installation fee $1,200 (city-installed, “RR-SS” price) + sewer capacity certification $600 + sewer plan review and site inspection $230 + sewer connection inspection $250 + account establishment fee $15 = $2,295. Savannah: AMI water meter $525 + water tap-in fee $600 + sewer tap-in fee $400 + reclaimed water project connection fee $600 + account establishment fee $30 = $2,155. Marietta: water meter/tap fee $1,500 + Sewer Development Fee $3,500 + 6-inch sewer tap installation $2,500 + new-account charge $25 = $7,525. For the lowest-total row, Atlanta swaps in the $400 private-contractor meter price with the same sewer charges ($400 + $600 + $230 + $250 + $15 = $1,495); Savannah uses the owner-occupied exemption on existing lines, which waives the $600 water tap-in and the $600 reclaimed water fee, leaving $525 meter + $400 sewer tap-in + $30 account fee = $955; Marietta swaps in the $500 subdivision “drop” meter price for a lot with the service already stubbed ($500 + $3,500 + $2,500 + $25 = $6,525).

Split the totals apart and Marietta’s gap is almost entirely sewer. Atlanta’s sewer-side charges total $1,080 (capacity certification + plan review/site inspection + connection inspection), and Savannah’s sewer tap-in fee is $400. Marietta’s combined sewer charge — the $3,500 Sewer Development Fee plus the $2,500 6-inch tap installation — is $6,000, a flat charge that does not change with meter size or house size the way Atlanta’s and Savannah’s fees can.

City pages with the full fee rows, payment timing and local caveats: Atlanta water and sewer tap fees, Savannah water and sewer tap-in fees and Marietta tap and sewer development fees.

What decides your number

Atlanta, Savannah and Marietta are the only Georgia utilities in our database so far. Other Georgia cities and counties may be served by different utilities, or by wells and septic, with fees that are not yet collected here.

Frequently asked questions

How much are water and sewer tap fees in Georgia?

It depends heavily on the city. For a new home with a 3/4-inch meter installed by the utility, official 2026 charges run from $2,155 in Savannah to about $2,295 in Atlanta to $7,525 in Marietta. Lower scenarios exist in each city: $955 for an owner-occupied Savannah home on existing lines, $1,495 for an Atlanta connection with a private contractor, and $6,525 for a Marietta subdivision lot with the service already stubbed.

Why is Marietta so much more expensive than Atlanta and Savannah?

Almost entirely because of sewer. Marietta charges a flat $3,500 Sewer Development Fee plus a $2,500 6-inch sewer tap installation, $6,000 combined, regardless of meter or house size. Atlanta’s sewer-side charges total $1,080 and Savannah’s sewer tap-in fee is $400. Marietta’s water-side charge ($1,500, or $500 on a stubbed subdivision lot) is actually close to Atlanta’s and Savannah’s.

Does Atlanta charge a water or sewer impact fee?

No. Ordinance 1995-79 repealed Atlanta’s water and wastewater connection fee chapters in January 1995. The city’s current development impact fees cover transportation, parks, fire and police, not utilities.

Does the Cobb County-Marietta Water Authority bill homeowners for Marietta tap fees?

No. CCMWA sells treated water wholesale to other utilities, including City of Marietta Power & Water, and does not bill or serve retail residential customers. City of Marietta Power & Water is the retail utility that bills the $7,525 in tap and sewer development fees above, and its schedule is dated 2022, so confirm current pricing before budgeting.