Inside Tampa city limits, the City of Tampa Water Department provides water and the Wastewater Department provides sewer. A new single-family home counts as one equivalent residential unit (ERU). Using the smallest meter on the city’s schedule (3/4 inch), outside the special CIAC areas, the one-time charges add up to $2,800 (water connection) + $1,713 (water capacity) + $665 (meter installation) + $50 (meter application) + $1,237 (wastewater capacity) = about $6,465, plus a $45 deposit. In Downtown or South Tampa the water side adds a $2,145 contribution-in-aid-of-construction charge, for about $7,917. The main caveat is the water schedule itself: the current PDF on tampa.gov is marked “Updated March 2021,” and the city has proposed capacity-fee changes, so confirm every water figure before you rely on it.

Official fees at a glance

The table shows every Tampa row we recorded. The wastewater capacity fee ($1,237 per ERU) comes from the city’s current wastewater capacity fee page and is marked verified. The water rows come from the Water Connection and Service Fees PDF. It sits in the site’s 2026 folder but is labeled “Updated March 2021,” so we mark those rows needs-review. The water side has three layers: a connection fee by meter size (higher outside city limits), a capacity fee per ERU, and in designated CIAC areas a reduced capacity fee plus a separate CIAC charge.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Sewer — Capacity
SewerCapacityWastewater Capacity Fee$1,237per equivalent residential unitOfficial source2026-09-24
Water — Account Setup
WaterAccount SetupWater Meter Application Fee3/4"$50by meter sizeOfficial source2026-09-24 Needs review
Water — Capacity
WaterCapacityWater Capacity Fee - Non-CIAC areas$1,713per equivalent residential unit2023-03-01Official source2026-09-24 Needs review
Water — Connection
WaterConnectionWater Connection Fee - new construction, inside city1"$7,000by meter sizeOfficial source2026-09-24 Needs review
WaterConnectionWater Connection Fee - new construction, inside city3/4"$2,800by meter sizeOfficial source2026-09-24 Needs review
Water — Deposit
WaterDepositWater Meter Deposit3/4"$45by meter sizeOfficial source2026-09-24 Needs review
Water — Meter
WaterMeterWater Meter Installation3/4"$665by meter sizeOfficial source2026-09-24 Needs review
Water — Other
WaterOtherContribution in Aid of Construction (CIAC) - Downtown and South Tampa$2,145per equivalent residential unit2012-03-15Official source2026-09-24 Needs review
Tampa’s water connection, capacity, CIAC and meter figures come from a document dated March 2021 (some line items carry earlier effective dates: the non-CIAC capacity fee 2023, the Downtown/South Tampa CIAC 2012). The city has proposed capacity-fee updates. Treat the water totals on this page as a starting estimate and confirm with the Water Department.

Worked example: a new single-family home

Assumptions: one detached house inside city limits, 3/4-inch meter (the smallest size on the city’s schedule), one ERU for water and one for wastewater, which City Code 26-37(a) ties together. We also assume the connection fee and the meter installation charge both apply to new construction, since the PDF lists them separately. Ask the city whether that is right for your permit.

City of Tampa one-time charges for one house, by water service area (sources: Water Connection and Service Fees, updated March 2021, needs review; Wastewater Capacity Fees).

Charge A. Non-CIAC area B. Downtown / South Tampa CIAC area C. Northeast CIAC area
Water connection fee, 3/4″, inside city $2,800 $2,800 $2,800
Water capacity fee (1 ERU) $1,713 $1,020 $1,020
CIAC charge (1 ERU) none $2,145 $2,724
Meter installation, 3/4″ $665 $665 $665
Meter application fee $50 $50 $50
Wastewater capacity fee (1 ERU) $1,237 $1,237 $1,237
Total fees $6,465 $7,917 $8,496
Refundable deposit (waiver available) $45 $45 $45

The arithmetic for A is $2,800 + $1,713 + $665 + $50 + $1,237 = $6,465. In B, the capacity fee drops to $1,020 but the $2,145 CIAC charge is added: $2,800 + $1,020 + $2,145 + $665 + $50 + $1,237 = $7,917. C uses the Northeast Area CIAC of $2,724 instead: $8,496.

Two other variables move the total by thousands. Location outside city limits: the same 3/4-inch connection is $3,500 instead of $2,800 where Tampa Water serves beyond the city line, adding $700. Meter size: a 1-inch connection is $7,000 inside the city ($8,750 outside), so case A with a 1-inch connection would come to $10,665 if the capacity, meter and wastewater charges stayed at their one-ERU, 3/4-inch amounts. We could not confirm that from the PDF, so check with the city before you accept a 1-inch connection.

Neighborhood Sewer Improvement fees can also apply to some lots, on top of the wastewater capacity fee. We did not collect those amounts.

What these fees don’t include

Tampa’s charges cover the city’s connection, capacity and meter. The pipe on your lot is separate:

For a house 40 feet from the street, typical private work is about 40 × $50 = $2,000 for water and 40 × $100 = $4,000 for sewer, before trenching. These ranges come from our national benchmark set, not from Tampa. Add them with the calculator:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

How and when you pay

Changes to watch

Tampa has proposed updates to its capacity fees, and the water schedule we used is labeled March 2021. Expect the water totals above to change, and check the city’s pages again before you close or pull a permit. Unincorporated Hillsborough County has its own schedule. News coverage reports a large proposed increase in the county’s water and wastewater impact fees. We have not collected or verified the county’s adopted figures, so they are not on this page.

Frequently asked questions

How much does it cost to connect a new house to Tampa water and sewer?

Inside city limits, outside CIAC areas, the published charges total about $6,465 for a 3/4-inch meter, plus a $45 deposit. Downtown and South Tampa lots pay about $7,917 because of a $2,145 CIAC charge. The water figures come from a 2021-labeled schedule and need confirmation.

What is a CIAC charge in Tampa?

A contribution in aid of construction is an extra per-ERU water charge in designated areas: $2,145 in Downtown and South Tampa and $2,724 in the Northeast Area. In those areas, the regular water capacity fee drops to $1,020 per ERU.

What is Tampa’s wastewater capacity fee?

It is $1,237 per ERU, and a single-family home counts as one ERU. Neighborhood Sewer Improvement fees may apply in some areas.

Is Tampa water more expensive outside city limits?

Yes. The water connection fee for a 3/4-inch meter is $3,500 outside the city versus $2,800 inside, and a 1-inch connection is $8,750 versus $7,000.

Are Hillsborough County impact fees the same as Tampa’s?

No. Unincorporated Hillsborough County has its own fee schedule, and an increase has been proposed. Confirm which of the two serves your parcel before you use any figure.

Related pages

See the Florida utility connection costs hub and Orlando (OUC) connection fees, or the full tap fees by city table. Related guides: tap fee vs. impact fee, water tap fee, sewer tap fee and the utility connection cost calculator.

Sources