Kansas Utility Connection Costs (2026): Tap Fees by City

Last reviewed: By Utility Cost Guide editor

In Kansas’s two largest cities, a new single-family home’s official water and sewer connection charges run from $4,795 in Wichita to $11,955–$17,295 in Overland Park, depending on meter size. Overland Park’s smallest published total, on a 5/8-inch meter, is roughly 2.5 times Wichita’s flat charge. That gap isn’t a sign Overland Park’s utilities cost more to run — it’s a different pricing structure. Wichita’s Public Works & Utilities department bills one flat connection-and-equity schedule regardless of a meter’s rated flow. Overland Park is served by two separate agencies, and WaterOne, its water utility, prices its System Development Charge on an exact formula: $290 for every gallon-per-minute of the assigned meter’s capacity. Our database covers these two Kansas cities so far. Other Kansas utilities are not yet collected, and we say so rather than guess.

Official fees in Kansas

The table below lists every verified Kansas fee row in our database, with utility, meter size and a link to the source document. The two cities structure their charges completely differently. Wichita charges a flat water connection fee plus a water plant equity fee and a sewer equity fee, sized only by whether the service is 1-inch or 2-inch — nothing scales with a meter’s actual flow rating. Overland Park’s water utility, WaterOne (Johnson County Water District No. 1), prices its System Development Charge at a clean $290 per gallon-per-minute of the assigned meter’s AWWA-rated capacity, and Johnson County Wastewater keys its sewer connection fee to that same water meter size.

CityProviderWater typical new home*Sewer typical new home*
Overland ParkJohnson County Wastewater (JCW)—$4,850
WichitaCity of Wichita Public Works & Utilities (Wichita Water Utilities)——

* Simplified sum of default official residential fees for a standard meter and one unit where applicable. Confirm your actual charges with the utility.

City comparison

Official one-time water + sewer charges for one new single-family home (sources: Wichita Code of Ordinances Secs. 17.12.080 and 16.04.055; WaterOne Charges & Fees and Johnson County Wastewater residential permitting fees).

Situation Wichita Overland Park Difference
New home, smallest meter each city offers $4,795 (1-inch — no smaller service is listed) $11,955 (5/8-inch) $7,160
New home, 1-inch meter $4,795 (1-inch — same schedule) $28,125 (1-inch) $23,330

How the rows are built. Wichita: $1,812 water connection fee + $1,520 water plant equity fee + $1,350 sewer equity fee + $60 sewer permit + $53 account origination fee = $4,795, a flat charge under Code Sections 17.12.080 and 16.04.055 that doesn’t change once a lot has 1-inch service — Wichita’s price list has no 5/8-inch or 3/4-inch line at all. Overland Park: WaterOne’s $1,085 connection charge + $5,800 System Development Charge, plus Johnson County Wastewater’s $220 sewer permit + $4,850 sewer connection fee = $11,955 on the smallest available 5/8-inch meter. Step up to 3/4-inch and the same formula gives $1,095 + $8,700 + $220 + $7,280 = $17,295; at 1-inch it’s $1,275 + $14,500 + $220 + $12,130 = $28,125.

Split the totals apart and the source of the gap is clear. Overland Park’s WaterOne System Development Charge is built on an exact per-gallon-per-minute formula: $5,800 ÷ 20 gpm (the 5/8-inch meter’s AWWA rating) = $290, and the ratio holds at every size — 30 gpm (3/4-inch) × $290 = $8,700, and 50 gpm (1-inch) × $290 = $14,500. Johnson County Wastewater’s sewer connection fee is keyed to that same meter size, so a bigger WaterOne meter raises both agencies’ bills at once. Wichita has nothing comparable: its water plant equity and sewer equity fees are flat amounts tied only to the 1-inch/2-inch split in the ordinance, not to how many gallons per minute the meter is rated to pass. That’s why the two cities’ totals aren’t just different numbers — they come from two different theories of how to charge for capacity. Wichita treats it as a one-time flat buy-in; Overland Park meters it to the size of the pipe a home is given, and WaterOne — not the homeowner — picks that size.

City pages with the full fee rows, payment timing and local caveats: Wichita water and sewer tap fees and Overland Park WaterOne and Johnson County Wastewater fees.

What decides your number

Kansas utility connection cost FAQ

How much do water and sewer connection fees cost in Kansas?

For a new single-family home, published city charges are $4,795 in Wichita on a 1-inch service. In Overland Park, published WaterOne and Johnson County Wastewater charges run from $11,955 on a 5/8-inch meter to $17,295 on a 3/4-inch meter, and $28,125 on a 1-inch meter.

Why is Overland Park so much more expensive than Wichita?

The two cities price capacity differently, not just at a different rate. Wichita charges a flat water plant equity fee and sewer equity fee that don’t scale with a meter’s flow rating. Overland Park’s WaterOne prices its System Development Charge at $290 per gallon-per-minute of the assigned meter’s capacity, and Johnson County Wastewater’s sewer connection fee scales with that same meter size — so a bigger meter raises both agencies’ bills together.

What is WaterOne’s System Development Charge formula?

It works out to an exact $290 per gallon-per-minute of the meter’s AWWA-rated capacity: $5,800 for a 5/8-inch meter (20 gpm), $8,700 for 3/4-inch (30 gpm) and $14,500 for 1-inch (50 gpm) — the same $290-per-gpm ratio holds at every size WaterOne publishes.

Does meter size change the fee the same way in both cities?

No. Overland Park’s total scales continuously with meter size because both WaterOne and Johnson County Wastewater key their charges to it. Wichita’s schedule only distinguishes a 1-inch service from a 2-inch service; within the 1-inch tier the $4,795 total doesn’t change with the meter’s rated flow.