Inside Conroe city limits, the City of Conroe supplies water and sewer service, and its connection charge is a tap fee set by the size of the tap. For a new single-family home on the smallest listed water tap, the city’s Code of Ordinances fee schedule adds up to $3,750: a $1,875 fee for a 3/4-inch water tap and a $1,875 fee for a 4-inch sewer tap. Conroe does not charge a water or wastewater impact fee today: the fee schedule lists none, and City Council has not adopted one. The city restarted an impact fee study in August 2026, and Community Impact reported that a public hearing on adopting fees could come in late 2027. The biggest caveat is who serves your lot. The city’s own development guidance says municipal utility districts (MUDs) may impose their own requirements within the city, and the fees on this page apply only where the City of Conroe provides the water and sewer.

Official Conroe fees in one table

The table below lists every Conroe row in our database, each linked to the document it came from. The tap fees are in Appendix A of the city code, in the Chapter 70 utilities section, and are priced by tap size, not meter size. The water table starts at a 3/4-inch tap. Conroe’s billing page calls the 5/8-inch meter the typical residential size, but the fee schedule does not say which tap goes with which meter. Water taps of 2 inches and larger are for bigger buildings, so they are not in our typical total. There are two sewer tap sizes, 4 inches and 6 inches, and the schedule does not say which building types use each. We total the 4-inch tap and show the 6-inch tap as an alternative. The $250 deposit and $15 account charge are account-opening charges, so they are also left out of the total.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Sewer — Tap
SewerTapSewer Tap Fee, 4" Tap
4-inch sewer tap
—$1,875flat fee—Official source2026-09-24
SewerTapSewer Tap Fee, 6" Tap
6-inch sewer tap
—$2,750flat fee—Official source2026-09-24
Water — Account Setup
WaterAccount SetupAccount establishment (minimum)—$15flat fee2025-10-01Official source2026-09-24
Water — Deposit
WaterDepositDeposit (minimum) - Residential—$250flat fee2025-10-01Official source2026-09-24
Water — Tap
WaterTapWater Tap Fee, 1" Tap1"$2,000by meter size—Official source2026-09-24
WaterTapWater Tap Fee, 10"+ Tap10"$5,750by meter size—Official source2026-09-24
WaterTapWater Tap Fee, 2" Tap2"$2,500by meter size—Official source2026-09-24
WaterTapWater Tap Fee, 3/4" Tap3/4"$1,875by meter size—Official source2026-09-24
WaterTapWater Tap Fee, 4" Tap4"$3,375by meter size—Official source2026-09-24
WaterTapWater Tap Fee, 6" Tap6"$3,500by meter size—Official source2026-09-24
WaterTapWater Tap Fee, 8" Tap8"$4,375by meter size—Official source2026-09-24

Worked example: a new home in Conroe

Assumptions: a detached house inside Conroe city limits, served by the City of Conroe (not a MUD), with no impact fee because the city has not adopted one. Fees come from Appendix A of the Conroe Code of Ordinances (checked September 24, 2026).

City of Conroe tap fees for one house, by tap size.

Line item 3/4-inch water tap, 4-inch sewer tap 1-inch water tap, 4-inch sewer tap 3/4-inch water tap, 6-inch sewer tap
Water tap fee $1,875.00 $2,000.00 $1,875.00
Sewer tap fee $1,875.00 $1,875.00 $2,750.00
Water and wastewater impact fees none adopted none adopted none adopted
Total $3,750.00 $3,875.00 $4,625.00

Moving up to a 1-inch water tap adds $125. A 6-inch sewer tap adds $875. Two more charges come on top of any of these totals. The city code says a meter installation charge equal to the actual labor and equipment cost is collected each time a meter is installed, but it does not publish an amount, so none is included here. When you open the account, the city also collects a minimum residential deposit of $250 and a $15 service charge. The deposit can be refunded after 12 months of on-time payments.

What is not included in Conroe fees

Under Sec. 70-74 of the city code, the city makes the water and sewer connections from the main only as far as the property line. The work on your lot is private and paid separately:

National figures are estimates from our benchmark set, not Conroe quotes. To combine the city’s fees with your own line lengths:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

Paying Conroe fees: timing and process

What could change in Conroe

Conroe’s $3,750 is a tap charge only. There is no impact fee yet, so an adopted impact fee from the 2027 study could change the total a lot.

How Conroe compares with Houston, Round Rock and Georgetown

Conroe’s $3,750 is below all three of these cities, but the totals include different charges. Houston’s $4,383.35 in water and wastewater impact fees (about $4,572 with permits) does not include the cost of the physical tap, which Houston’s fee schedule does not list. Round Rock charges $8,353 for a 5/8-inch meter on a post-2024 plat, and Georgetown charges about $24,494 at its current rates. In both cities, most of the total is impact fees, which Conroe does not charge yet.

Conroe tap fee FAQ

How much does a water and sewer tap cost in Conroe, TX?

The city’s fee schedule lists $1,875 for a 3/4-inch water tap and $1,875 for a 4-inch sewer tap, $3,750 in total. A 1-inch water tap is $2,000 and a 6-inch sewer tap is $2,750. The tap fee is paid when the permit is issued.

Does Conroe charge water or wastewater impact fees?

Not as of September 2026. The city is running a water, wastewater and roadway impact fee study. The schedule presented to City Council in August 2026 puts public hearings in 2027, so check again before you budget for a project that will be permitted after that.

What does the Conroe tap fee pay for?

The city makes the connection from the water main and the sewer main to your property line and sets the water meter there when one is required. The line from the meter to the house and the sewer lateral on your lot are private work.

Is there a separate meter charge?

The city code says a meter installation charge based on the actual labor and equipment cost is collected each time a meter is installed. Conroe does not publish a fixed amount, so ask the city for the figure before you finalize your budget.

How much is the water deposit in Conroe?

The minimum deposit for a residential account is $250, plus a required $15 service charge. The code sets the deposit at twice the estimated cost of water, sewer and garbage service and refunds it after 12 months of on-time payments.

Do these fees apply if my home is in a MUD?

Only if the City of Conroe provides your water and sewer. The city’s site development guidance notes that municipal utility districts may have their own requirements inside the city. If a MUD serves your lot, get its connection charges from the district.