Madison, WI Water & Sewer Connection Fees (2026)

Last reviewed: By Utility Cost Guide editor

In Madison, Madison Water Utility supplies the water, the City’s Engineering Division runs the local sewers, and the Madison Metropolitan Sewerage District (MMSD) treats the wastewater. A new single-family home on an existing street with a 5/8-inch meter pays $414 in published connection charges: the $110 water service application and inspection fee, the $84 water meter charge, the City’s $120 one-time sewer use charge and the $100 sewer connection permit fee. Madison has no citywide water or sewer impact fee and no flat tap fee. The caveat is location. Lots in one of the City’s sewer impact fee districts pay an extra charge based on land area. Land where MMSD’s connection charges were never paid owes those too, and across MMSD’s sewer basins they run from $211.03 to $419.58 per 1,000 square feet of land in 2026.

Madison connection fees at a glance

The table lists every Madison row in our database with its source. The four charges in the lead are the ones a typical new house pays. The meter and sewer use charges come from Madison Water Utility’s meter application fee schedule effective May 1, 2026, and both depend on meter size. The other rows apply only in some cases: MMSD’s area charges by sewer basin, the City’s sewer impact fee districts, work billed at actual cost, and MGE’s electric charges. The impact fee rows are marked for review because the ordinance states each rate in base-year dollars and raises it every January 1, so the 2026 amount is higher.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Electric — Main Extension
ElectricMain ExtensionDistribution extension (embedded cost allowance $1,313 per energy-only customer)—See formulaformula2026-03-01Official source2026-09-25
Electric — Other
ElectricOtherTemporary Service Charge (120/240 V single-phase, up to 200 A, for construction)—$111flat fee2026-03-01Official source2026-09-25
Electric — Service Line
ElectricService LinePermanent underground service lateral / overhead service drop (single-phase, first 120 ft)—$0flat fee2026-01-01Official source2026-09-25
Sewer — Capacity
SewerCapacityMMSD connection charge, East basin (CFCC + TPCC)
East basin
—$228.24per sq ft2026-01-01Official source2026-09-25
SewerCapacityMMSD connection charge, Lower Badger Mill Creek basin (CFCC + TPCC)
Lower Badger Mill Creek basin
—$411.51per sq ft2026-01-01Official source2026-09-25
SewerCapacityMMSD connection charge, Nine Springs Valley basin (CFCC + TPCC)
Nine Springs basin
—$227.35per sq ft2026-01-01Official source2026-09-25
SewerCapacityMMSD connection charge, Northeast basin (CFCC + TPCC)
Northeast basin
—$231.64per sq ft2026-01-01Official source2026-09-25
SewerCapacityMMSD connection charge, Southwest basin (CFCC + TPCC)
Southwest basin
—$255.97per sq ft2026-01-01Official source2026-09-25
SewerCapacityMMSD connection charge, West Interceptor basin (CFCC + TPCC)
West Interceptor basin
—$232.38per sq ft2026-01-01Official source2026-09-25
Sewer — Connection
SewerConnectionMMSD collection system modification fee—$1,750flat fee2026-01-01Official source2026-09-25
SewerConnectionOne-time sewer use charge (collected with meter application)
1-inch meter
1"$210by meter size2026-05-01Official source2026-09-25
SewerConnectionOne-time sewer use charge (collected with meter application)
3/4-inch meter
3/4"$120by meter size2026-05-01Official source2026-09-25
SewerConnectionOne-time sewer use charge (collected with meter application)
5/8-inch meter
5/8"$120by meter size2026-05-01Official source2026-09-25
Sewer — Impact
SewerImpactJeffy Trail Sanitary Sewer Improvement Impact Fee—$303.95per sq ft—Official source2026-09-25 Confirm with utility
SewerImpactLower Badger Mill Creek Impact Fee, lift station component—$595.05per unit—Official source2026-09-25 Confirm with utility
SewerImpactLower Badger Mill Creek Sanitary Sewer Impact Fee (sanitary component)—$56.52per sq ft—Official source2026-09-25 Confirm with utility
SewerImpactPumpkin Hollow Neighborhood Sanitary Sewer Improvement Impact Fee—$60.60per sq ft—Official source2026-09-25 Confirm with utility
SewerImpactWest Elderberry Neighborhood Sanitary Sewer Improvement Impact Fee—$109.26per sq ft—Official source2026-09-25 Confirm with utility
Sewer — Permit
SewerPermitSewer connection permit application fee—$100flat fee—Official source2026-09-25
Sewer — Service Line
SewerService LineSanitary sewer lateral installed by City forces or City contract—See formulaformula—Official source2026-09-25
Water — Inspection
WaterInspectionWater service application/inspection fee (live tap 2-inch or smaller)—$110flat fee—Official source2026-09-25
Water — Main Extension
WaterMain ExtensionWater Main Extension (special assessment or customer-financed contribution)—See formulaformula2026-05-01Official source2026-09-25
Water — Meter
WaterMeterWater Meter Charge (meter application)
1-inch meter
1"$145by meter size2026-05-01Official source2026-09-25
WaterMeterWater Meter Charge (meter application)
3/4-inch meter
3/4"$108by meter size2026-05-01Official source2026-09-25
WaterMeterWater Meter Charge (meter application)
5/8-inch meter
5/8"$84by meter size2026-05-01Official source2026-09-25
Water — Service Line
WaterService LineWater Lateral Installation Charge (main through curb stop)—See formulaformula2026-05-01Official source2026-09-25

Worked example for a single-family home in Madison

Assume one new house with a water service and a sewer lateral connecting to existing City mains in the street. The first two cases are an infill lot where MMSD’s charges were paid long ago and no impact fee district applies. The third is a lot in the Pumpkin Hollow sewer impact fee district. The fourth is land whose MMSD charges are still unpaid. Both of those use an 8,000-square-foot lot.

Published Madison Water Utility, City of Madison and MMSD charges for one new single-family home. Plumber, excavation and street work are extra.

Case Water service fee Meter charge Sewer use charge Sewer permit Area charges Total
Infill lot, 5/8-inch meter $110.00 $84.00 $120.00 $100.00 none $414.00
Infill lot, 1-inch meter $110.00 $145.00 $210.00 $100.00 none $565.00
Pumpkin Hollow district, 5/8-inch meter $110.00 $84.00 $120.00 $100.00 $484.80 or more $898.80 or more
Unpaid MMSD area, Nine Springs Valley basin, 5/8-inch meter $110.00 $84.00 $120.00 $100.00 $1,818.80 $2,232.80

The Pumpkin Hollow figure is 8 × $60.60, the rate set in Madison General Ordinances section 20.08(12) in September 2024 dollars. The 2026 inflation-adjusted amount is higher. The MMSD figure is 8 × $227.35. That is the 2026 Nine Springs Valley combined rate: a $58.49 conveyance charge plus the $168.86 treatment plant charge, from MMSD’s 2026 connection charge schedule. MMSD bills these charges to the City by land area, and its guidance says they generally must be paid before an area develops, so on most lots they were settled years ago or when the subdivision was created. MMSD’s Paid Areas Viewer on its connection charges page shows whether a parcel has paid.

Other basins differ: $228.24 per 1,000 square feet in the East basin, $255.97 in the Southwest basin and $411.51 in Lower Badger Mill Creek on the far west side.

What is not included in Madison fees

Madison’s published fees are small, but the owner also pays the actual cost of the pipe work, and that usually costs more than the fees:

National figures are estimates from our benchmark set. Enter your contractor’s quotes in the calculator, which loads Madison’s official fees:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

When you pay Madison connection fees

A master plumber files two applications with Madison Water Utility. The first is the Water Service Connection application, which needs the owner’s signature, a site utility plan and the $110 fee for a live tap of 2 inches or smaller. Larger taps and cut-ins require deposits of $4,000 and $1,000. The second is the Water Meter application, paid at the meter-size rate. The utility asks for 10 business days to process each one and 3 business days’ notice to schedule the tap, inspection or meter installation. Applications expire after two years.

The sewer use charge is collected with the meter application. It covers sewer use during construction, before the meter is in. The $100 sewer permit fee is paid to City Engineering, and the Engineer may accept the building permit application as the sewer application. Sewer impact fees are due when the building permit is issued, at the rate in effect that year, unless the developer paid earlier at plat recording. After connection, the utility maintains the water lateral from the main through the curb stop. The owner maintains the line from the curb stop to the house.

Check a lot’s status before you buy. A parcel in one of the City’s eleven impact fee districts, or one with unpaid MMSD charges, can owe hundreds to thousands of dollars more than the $414 base. The City’s impact fee page has the district map, and MMSD’s Paid Areas Viewer shows sewer charge status.

Madison fee changes to watch

How Madison compares with Minneapolis

Both cities split the work between a city utility and a regional wastewater agency, but they charge in different ways. Minneapolis charges a new house $2,805 in published fees. Most of that is the Metropolitan Council’s $2,485 Sewer Availability Charge, collected per home at permit. Madison’s regional agency charges by land area instead, and the charge is usually paid before anyone builds on the lot. A Madison infill house therefore pays about $414, roughly one-seventh of the Minneapolis figure. On land that still owes MMSD charges, the gap gets smaller.

Madison connection fee FAQ

How much does it cost to connect a new house to water and sewer in Madison, WI?

The published charges for a typical infill lot with a 5/8-inch meter total $414: a $110 water service fee, an $84 meter charge, a $120 one-time sewer use charge and a $100 sewer permit fee. With a 1-inch meter the total is $565. Contractor work on the laterals is extra and usually costs more.

Does Madison charge a water impact fee?

No. Madison Water Utility’s published rates and rules (PSC docket 3280-WR-117) list no impact, capacity or flat tap fee, and none of the City’s Chapter 20 impact fees is for water. The sewer and stormwater impact fees apply only in specific districts. Chapter 20 also sets a citywide park impact fee on new homes, which is not a utility charge and is not counted here.

What are MMSD connection charges?

They are one-time regional sewer charges based on land area: a conveyance charge that depends on the sewer basin plus a treatment plant charge of $168.86 per 1,000 square feet in 2026. Combined 2026 rates run from $211.03 to $419.58 per 1,000 square feet. Most existing lots paid them long ago.

Who installs the water lateral in Madison?

For a regular 1- to 2-inch service, the property owner’s contractor installs it from the main through the curb stop while a utility inspector watches. In new plats and street projects, the utility installs improvement laterals at actual cost.

Why is there a sewer charge on my water meter application?

City ordinance collects a one-time sewer use fee from new construction for sewer use before the water meter is installed. For a single-family home it equals half of one flat-rate sewer charge, which is $120 with a 5/8- or 3/4-inch meter in the May 2026 schedule.

Does MGE charge to connect electric service to a new house?

Not for a standard single-phase service up to 120 feet. MGE installs, owns and maintains the drop or lateral and supplies the meter and transformer. Extra footage, a route the owner chooses or unusual trenching costs extra, and temporary construction service is $111.

Related: Minneapolis fees · Omaha fees · Kansas City fees · Columbus fees · sewer tap fees · water tap fees · tap fee vs. impact fee · water meter installation cost · utility connection cost calculator

Madison fee sources