Huntsville Utilities Tap & Sewer Access Fees (2026)

Last reviewed: By Utility Cost Guide editor

In Huntsville, city-owned Huntsville Utilities provides water, natural gas and electricity, while the City of Huntsville’s Water Pollution Control office runs the sewer system. For a new single-family home that needs a new water tap and a 5/8-inch or 1-inch meter, the published charges come to $4,281: a $1,635 water tap (Huntsville Utilities Customer Service Fees, effective Nov 1, 2024), a $1,646 water system development charge (Water System Development Charges, effective April 1, 2024), and a $1,000 sewer access fee for the smallest meter tier (City Code Sec. 21-282). Add the $885 gas tap and the total is $5,166. The main caveat: the larger part of the water development charge ($1,426) is due at the contribution-in-aid-of-construction (CIAC) stage rather than at meter installation, so ask Huntsville Utilities whether it has already been paid for your lot. For how this compares nationally, see our guide to the cost to connect to city water.

Official Huntsville fees in one table

The rows come from Huntsville Utilities’ Customer Service Fees table (effective November 1, 2024), its water system development charge (SDC) sheet (effective April 1, 2024) and the City of Huntsville Code of Ordinances for sewer. “Other published fees” are real charges that only some homes pay, such as a new electric transformer, a second irrigation meter or a gas line longer than 100 feet.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Electric — Main Extension
ElectricMain ExtensionBlanket ATC: New O.H. Transformer & O.H. Service (Residential)—$2,895flat fee2024-11-01Official source2026-09-24
ElectricMain ExtensionBlanket ATC: New O.H. Transformer & U.G. Service (Residential)—$3,270flat fee2024-11-01Official source2026-09-24
Electric — Other
ElectricOtherBlanket ATC: Upgrade Transformer/Install U.G. Service (Residential)—$3,780flat fee2024-11-01Official source2026-09-24
Electric — Service Line
ElectricService LineAccelerated Underground Electric Service—$680flat fee2024-11-01Official source2026-09-24
Gas — Service Line
GasService LinePer Foot Charge To Relocate Or Install 1" Gas Service Line Above The Stated Maximum 100 Feet1"$25per linear foot2024-11-01Official source2026-09-24
Gas — Tap
GasTapInstall 1" Residential Gas Service PE Line Tap And Meter All Loads1"$885flat fee2024-11-01Official source2026-09-24
General — Account Setup
GeneralAccount SetupAccount Set-Up Or Transfer—$60flat fee2024-11-01Official source2026-09-24
General — Deposit
GeneralDepositStandard Residential Security Deposit—$300flat fee2024-11-01Official source2026-09-24
Sewer — Connection
SewerConnectionSewer connection fee where main was installed at no cost to the property—$1,000flat fee1994-12-20Official source2026-09-24
Sewer — Impact
SewerImpactSewer Access Fee (new discharge access fee), 3/4" water meter<1"$1,000by meter size2006-10-12Official source2026-09-24
SewerImpactSewer Access Fee (new discharge access fee), 1" water meter1"$1,500by meter size2006-10-12Official source2026-09-24
Water — Capacity
WaterCapacityWater System Development Charge, 2" meter (CIAC $6,636 + meter install $385)2"$7,021by meter size2024-04-01Official source2026-09-24
WaterCapacityWater System Development Charge, CIAC portion (5/8" or 1" meter)5/8"$1,426by meter size2024-04-01Official source2026-09-24
WaterCapacityWater System Development Charge, portion paid at time of meter install (1" or less)5/8"$220by meter size2024-04-01Official source2026-09-24
Water — Meter
WaterMeterInstall 1" Meter At The Same Time As Initial Installation (Extra Stub, Domestic Or Irrigation)1"$695flat fee2024-11-01Official source2026-09-24
WaterMeterUpgrade To 1" Meter From 5/8" Meter1"$755flat fee2024-11-01Official source2026-09-24
Water — Tap
WaterTapInstall 1" Tap (5/8" Meter or 1" Meter)5/8"$1,635by meter size2024-11-01Official source2026-09-24

Worked example for a single-family home in Huntsville

Assumptions: a house inside city limits on city sewer, a 5/8-inch or 1-inch water meter (tap and SDC prices are the same for both), a gas line of 100 feet or less, and no Hampton Cove or Knox Creek per-lot water fee already paid. The sewer ordinance lists 3/4 inch as its smallest meter size and has no 5/8-inch row. We apply its lowest tier, $1,000, to any meter under 1 inch, including 5/8 inch. That is our reading; the ordinance does not say it, so confirm with the city.

One-time official charges for one new single-family home in Huntsville, by situation. Sources: Huntsville Utilities Customer Service Fees (Nov 1, 2024), Water System Development Charges (April 1, 2024), City Code Sec. 21-282. Private line construction not included.

Situation Water tap Water SDC Sewer access Gas tap Total
New tap, 5/8-inch meter, water and sewer only $1,635 $1,646 $1,000 none $4,281
Same, with gas service $1,635 $1,646 $1,000 $885 $5,166
New tap, 1-inch meter, with gas $1,635 $1,646 $1,500 $885 $5,666
CIAC-stage SDC already paid, 5/8-inch meter see note $220 $1,000 $885 $2,105 + any tap

The arithmetic for the first row is $1,635 + $1,426 + $220 + $1,000 = $4,281. The 1-inch row changes only the sewer access fee, which rises to $1,500 because the city bases it on the new water meter size. The last row applies only if Huntsville Utilities confirms the $1,426 CIAC-stage portion has already been paid for the lot. The fee table lists no charge for setting a first meter on an existing stub, so we leave that cell open rather than guess.

Electric is the swing item. If Huntsville Utilities has to set a new overhead transformer for the house, its blanket ATC charge is $3,270 with underground service or $2,895 with overhead service. Where an existing transformer must be upgraded and underground service installed, the charge is $3,780. Many lots need none of these, so they are left out of the totals; adding the $3,270 charge to the second row would make it $8,436.

Huntsville vs. Knoxville and Nashville

Huntsville’s $4,281 water and sewer total sits between its two Tennessee neighbors. Knoxville Utilities Board lists a $1,000 water tap and a $1,700 wastewater tap, and we found no capacity charge in its fee documents, a $2,700 minimum (see our Knoxville tap fee page). Huntsville’s total is $1,581 higher, mostly because of its $1,646 water development charge. Nashville’s Metro Water Services charges $500 and $360 in tap fees plus $3,675 in capacity charges per 350-gallon-per-day unit, $4,535 at one unit (Nashville tap fees). That is $254 more than Huntsville, and the gap widens to $3,929 if Metro assigns a house two units. KUB’s figures are published minimums; Huntsville’s are fixed by meter size.

Costs outside the Huntsville fee schedule

The owner bears all costs of installing and connecting the building sewer (City Code Sec. 21-121). Gas piping past the meter is also the owner’s. Typical costs the fees don’t cover:

Gas is better covered: the $885 fee includes tap, service line and meter, with $25 per foot charged only past 100 feet. A 60-foot water line at $50 a foot ($3,000) and a 60-foot sewer lateral at $100 a foot ($6,000) add about $9,000, about double the official water and sewer charges. These figures come from our national benchmark set. See water service line cost, sewer lateral cost, gas line connection cost and cost to run power to property, or model your own lot here:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

Paying Huntsville fees: timing and process

Upcoming changes in Huntsville

The sewer access fee amounts date from ordinances adopted in 2005 and 2006 and remain in the current city code; the city’s own sewer fee web page was last updated in 2019 and shows the same table. The water SDC sheet took effect April 1, 2024, and the customer service fee table on November 1, 2024. An older gas request form still shows $865; the $885 fee-table figure is newer. Monthly sewer usage rates are also climbing on a schedule set in the city code: $5.83 per 1,000 gallons for single-family homes from September 1, 2025, $6.08 from September 1, 2026, and $6.33 from September 1, 2027.

Before you budget, ask Huntsville Utilities Engineering Services whether your lot’s CIAC-stage water SDC has been paid, whether a water or gas stub is already in place, and whether the house needs a new transformer. Those three answers move the total by several thousand dollars.

Huntsville connection fee questions

How much are water and sewer tap fees in Huntsville, AL?

For a new water tap with a 5/8-inch or 1-inch meter, Huntsville Utilities charges a $1,635 tap fee and a $1,646 water system development charge. The city adds a $1,000 sewer access fee for the smallest meter tier. Together that is $4,281, or $4,781 if the sewer fee is assessed at the 1-inch rate of $1,500.

What is the Huntsville Utilities system development charge?

It is a one-time water capacity charge by meter size, effective April 1, 2024. For a 5/8-inch or 1-inch meter it totals $1,646: $1,426 paid with the contribution in aid of construction and $220 paid when the meter is installed. Lots in Hampton Cove and Knox Creek that paid the $1,200 per-lot fee are exempt.

Who charges for sewer in Huntsville?

The City of Huntsville, not Huntsville Utilities. Its Water Pollution Control office runs the sewer system, and the city inspection department collects the sewer access fee, $1,000 for a 3/4-inch meter and $1,500 for 1 inch. Monthly sewer charges are based on the water use Huntsville Utilities meters and appear on the same bill as water.

What does it cost to connect natural gas to a new house in Huntsville?

Huntsville Utilities charges $885 to install a 1-inch residential gas service line, tap and meter for any load. Lines longer than 100 feet cost $25 per extra foot, and a main extension can bring an aid-to-construction charge on top. House piping past the meter is the owner’s job.

Is there a fee for new electric service?

A standard hookup has no flat new-service fee in Huntsville Utilities’ table, but if the house needs a new overhead transformer the blanket aid-to-construction charge is $3,270 with underground service or $2,895 with overhead service. Accelerated service costs $680. Ask Huntsville Utilities which charge, if any, applies to your lot.

Where to go next from Huntsville

Northeast of Huntsville, Chattanooga water and sewer tap fees are split between Tennessee American Water and the city.

Compare Huntsville with Knoxville, Nashville, Murfreesboro, Atlanta and Charlotte, or see the full tap fees by city table. Related guides: tap fee vs. impact fee, water tap fee, sewer tap fee, utility extension cost and the utility connection cost calculator.

Huntsville fee sources