Austin Water Tap & Impact Fees (2026)

Last reviewed: By Utility Cost Guide editor

Inside the City of Austin, Austin Water provides both water and wastewater service, and the largest connection charge is the Capital Recovery Fee, Austin’s name for an impact fee. For a new single-family home on a lot platted on or after October 1, 2023, the published charges add up to about $8,119 with a 5/8-inch meter and $11,997 with a 3/4-inch meter: water and wastewater impact fees plus the meter, tap and inspection fees shown in the worked example below. The single most important caveat is that Austin picks the impact-fee table by the plat date of the lot, not by the date you pull a permit, so two identical houses on the same street can owe different amounts.

Official Austin fees in one table

The table below lists every Austin Water fee row in our database with its source document. Read it in two layers. The impact fees are quoted per service unit (Austin Water also calls it an LUE), so you multiply them by your meter’s service-unit count: a 5/8-inch meter is 1 service unit, a 3/4-inch meter is 1.5 and a 1-inch meter is 2.5. The meter, tap and inspection charges are flat amounts per connection. Rows marked for review come from the FY2026-27 Utility Permitting Fees sheet, which the city itself flags as based on the FY27 fee workbook and subject to final adoption.

FY2027 meter, inspection and drop-in fees await verification against final adopted fees. Adoption and effective dates have not been established here. Worked examples using these amounts are provisional; calculator totals using them are withheld pending source review. Confirm fees with Austin Water before budgeting.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Sewer — Impact
SewerImpactWastewater Impact Fee (Capital Recovery Fee)
Lots platted on or after Oct 1, 2023
—$2,900per service unit (LUE)—Official source2026-09-24
SewerImpactWastewater Impact Fee (Capital Recovery Fee)
Lots platted Oct 1, 2018–Sep 30, 2023
—$2,500per service unit (LUE)—Official source2026-09-24
Water — Impact
WaterImpactWater Impact Fee (Capital Recovery Fee)
Lots platted on or after Oct 1, 2023
—$4,800per service unit (LUE)—Official source2026-09-24
WaterImpactWater Impact Fee (Capital Recovery Fee)
Lots platted Oct 1, 2018–Sep 30, 2023
—$4,700per service unit (LUE)—Official source2026-09-24
Water — Inspection
WaterInspectionAustin Water Inspection Fee (residential)—$107.90flat fee—Official source2026-09-30 Provisional — final adoption and effective date unverified
Water — Meter
WaterMeterMeter Cost (domestic)1"$215.18by meter size—Official source2026-09-30 Provisional — final adoption and effective date unverified
WaterMeterMeter Cost (domestic)3/4"$138.86by meter size—Official source2026-09-30 Provisional — final adoption and effective date unverified
WaterMeterMeter Cost (domestic)5/8"$111.3by meter size—Official source2026-09-30 Provisional — final adoption and effective date unverified
Water — Plan Review
WaterPlan ReviewInitial Tap Plan Review—$124.22flat fee2025-10-01Official source2026-09-24
Water — Tap
WaterTapTap & Reconnect (Drop-in Base) Fee5/8"$200.22by meter size—Official source2026-09-30 Provisional — final adoption and effective date unverified

What a new Austin house pays: worked example

Assumptions: one detached house, one domestic meter, water and wastewater both from Austin Water, no engineered tap plan. Impact fees come from the Austin Water rates and fees page; the meter, tap and inspection figures come from the Utility Permitting Office FY2026-27 fee sheet (pending final adoption).

Austin Water connection charges by meter size and plat date. Impact fee = rate per service unit × service units.

Line item 5/8″ meter, plat on/after 10/1/2023 3/4″ meter, plat on/after 10/1/2023 3/4″ meter, plat 10/1/2018–9/30/2023 1″ meter, plat on/after 10/1/2023
Service units 1 1.5 1.5 2.5
Water impact fee $4,800 × 1 = $4,800 $4,800 × 1.5 = $7,200 $4,700 × 1.5 = $7,050 $4,800 × 2.5 = $12,000
Wastewater impact fee $2,900 × 1 = $2,900 $2,900 × 1.5 = $4,350 $2,500 × 1.5 = $3,750 $2,900 × 2.5 = $7,250
Meter cost $111.30 $138.86 $138.86 $215.18
Tap & reconnect (drop-in base) fee $200.22 $200.22 $200.22 $200.22
Austin Water residential inspection $107.90 $107.90 $107.90 $107.90
Total $8,119.42 $11,996.98 $11,246.98 $19,773.30

The third column is a useful check. Austin Water’s own worked example, for a 3/4-inch meter on a lot platted between 2018 and 2023, gives a total of $11,246.98 in water and wastewater permit fees, which is exactly what the arithmetic above produces ($7,050 + $3,750 + $138.86 + $200.22 + $107.90).

Two things move the total more than anything else. The first is meter size: stepping from 5/8 inch to 3/4 inch adds $3,877.56, almost all of it impact fees, and stepping to 1 inch more than doubles the 5/8-inch figure. The second is the plat date. Lots platted from January 2014 through September 2018 fall under an older table of $5,400 water and $2,200 wastewater per service unit, and plats before that use lower, zone-dependent amounts. Look up the recorded plat for your lot before you budget.

The fixed items (meter, tap, inspection) total $419.42 to $523.30 depending on meter size. They are small next to the impact fees, and they are the figures most likely to shift slightly when the FY2026-27 schedule is formally adopted.

What Austin’s fees don’t cover

Austin Water’s charges stop at the connection and the meter. Everything on your side of the meter is private work you hire out, and it is often as large as the city fees:

National figures are estimates from our benchmark set, not Austin quotes. To combine Austin’s official fees with your own line lengths and soil, use the calculator:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

Paying Austin fees: timing and process

Austin Water handles new connections through its Utility Permitting Office, where the tap, meter and inspection fees are listed. The impact-fee rate is fixed by the lot’s plat date, so the plat is what you need to identify first. Projects that require an engineered tap plan (typically larger or commercial taps) also pay an Initial Tap Plan Review fee of $124.22 for FY2026 (effective October 1, 2025 through September 30, 2026), which covers the first three reviews, per the Development Services fee schedule. A standard single-family domestic meter does not usually need one.

Austin Water’s published pages do not state installation wait times, and we have not found an official figure, so ask the permitting office when you apply rather than relying on a builder’s rule of thumb.

Many older Austin Water fee links on austintexas.gov now return errors because the documents moved to austin.widen.net. If a PDF link from a builder or lender is broken, start from the rates-and-fees and Utility Permitting Office pages instead.

What could change in Austin

Austin tap fee FAQ

How much are Austin Water impact fees for a new house?

For a lot platted on or after October 1, 2023, Austin Water charges $4,800 for water and $2,900 for wastewater per service unit. A 5/8-inch meter is one service unit, so the impact fees are $7,700; a 3/4-inch meter is 1.5 units, so they are $11,550.

Why does my plat date matter more than my permit date?

Austin assigns the Capital Recovery Fee table by the date the lot was platted. A lot platted between October 2018 and September 2023 pays $4,700 and $2,500 per service unit instead of $4,800 and $2,900, which on a 3/4-inch meter is $750 less in total.

Is a 3/4-inch meter worth the extra cost?

It costs about $3,878 more than a 5/8-inch meter because the impact fees are multiplied by 1.5 instead of 1. Choose it when fixture count, irrigation or a fire sprinkler requirement calls for it; otherwise the smaller meter is the cheaper connection.

Does the Austin tap fee include the pipe to my house?

No. The $200.22 tap and reconnect fee and the meter charge cover Austin Water’s work at the meter. The service line and sewer lateral on your property are private work, typically priced per foot by a plumber.

Are Austin’s fees the same outside the city limits?

Not necessarily. A mailing address does not tell you the water provider, and parcels outside Austin Water’s service area pay whatever their own utility or district charges. Confirm who serves your parcel before using Austin Water’s figures.

North of Austin, suburbs set their own impact fees under the same state law: compare Leander’s community impact fee schedule and Georgetown Utility Systems connection charges.

Down I-35 in Hays County, Kyle’s water and wastewater impact fees follow a 2025 schedule, and north of the city Round Rock’s water and wastewater impact fees apply to lots platted after 2023.

Related: Texas utility connection costs by city · tap fee vs. impact fee · water tap fees · sewer tap fees · water meter installation cost · San Antonio (SAWS) fees · utility connection cost calculator