Bowling Green Municipal Utilities (BGMU) Tap & Connection Fees (2026)

Last reviewed: By Utility Cost Guide editor

In Bowling Green, one utility handles both pipes. Bowling Green Municipal Utilities (BGMU), a city-owned utility, supplies water and collects wastewater for the whole service area, and it also distributes electricity bought wholesale from TVA. For a new single-family home with a standard 5/8-inch meter, BGMU’s published charges come to $4,000: a $400 water main line tap fee, a $1,600 flat fee for the 5/8-inch meter, and a $2,000 sewer attachment deposit (Meter Charges and Miscellaneous Service Fees, Rev. October 2025). The caveat that matters most: the $2,000 sewer figure is only a deposit. BGMU’s sewer attachments are billed at actual time and materials, so the final sewer charge can land above or below $2,000, with any difference refunded or invoiced after the work is done. For how this compares nationally, see our guide to the cost to connect to city water.

Bowling Green connection fees at a glance

Every row below comes from BGMU’s own fee documents: the Meter Charges and Miscellaneous Service Fees sheet (revised October 2025) for tap, meter and sewer attachment charges, and BGMU’s Rules and Regulations (approved November 2025) for the account application fee. BGMU prices water meters by size but lists only 5/8, 1, 2 and 4 inches; the main line tap fee and the sewer attachment deposit are flat regardless of size. Rows marked as not typical, such as the fire line tap, the manhole core fee and the development review fee, apply only in the situations their notes describe.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
General — Plan Review
GeneralPlan ReviewDevelopment Review Fee (Small Development)—$1,000flat fee2026-01-01Official source2026-09-25
Sewer — Connection
SewerConnectionSewer Attachment Fee (Deposit)—$2,000varies2025-10-01Official source2026-09-25
Sewer — Inspection
SewerInspectionSewer Lateral Camera Fee—$100flat fee2025-10-01Official source2026-09-25
SewerInspectionSewer Tap Locate Fee—$400flat fee2025-10-01Official source2026-09-25
Sewer — Other
SewerOtherManhole Core Fee—$400flat fee2025-10-01Official source2026-09-25
Water — Account Setup
WaterAccount SetupApplication Fee - Water and/or Wastewater—$30flat fee2025-11-01Official source2026-09-25
Water — Meter
WaterMeterWater Meter Fee (1-inch)1"$2,000by meter size2025-10-01Official source2026-09-25
WaterMeterWater Meter Fee (2-inch) - Down Payment for Time and Material2"$4,000varies2025-10-01Official source2026-09-25
WaterMeterWater Meter Fee (4-inch) - Down Payment for Time and Material4"$6,000varies2025-10-01Official source2026-09-25
WaterMeterWater Meter Fee (5/8-inch)5/8"$1,600by meter size2025-10-01Official source2026-09-25
Water — Other
WaterOtherFire Line Assembly Tap Fee—$800flat fee2025-10-01Official source2026-09-25
Water — Tap
WaterTapWater Main Line Tap Fee—$400flat fee2025-10-01Official source2026-09-25

What a new Bowling Green house pays: worked example

Assumptions: one detached house on a lot where BGMU’s water main already runs in the street, a standard 5/8-inch meter, and a straightforward sewer attachment (no manhole coring or fire line). BGMU does not price its connection charges by lot size or zone the way some Kentucky utilities do, so the main variable for a typical home is meter size.

Published Bowling Green connection charges for one house, by meter size (source: BGMU Meter Charges and Miscellaneous Service Fees, Rev. October 2025). The sewer figure is a deposit, not a fixed price.

Charge A: 5/8-inch meter (standard) B: 1-inch meter
Water main line tap fee $400.00 $400.00
Water meter fee $1,600.00 $2,000.00
Sewer attachment deposit $2,000.00 $2,000.00
Published total (deposit basis) $4,000.00 $4,400.00

A 1-inch meter raises the water side by $400 over the 5/8-inch meter, taking the published total to $4,400. Both cases assume BGMU does not have to install a separate service line from the tap to the meter; if it does, that portion is billed at time and materials with no published flat rate. The sewer side is the biggest unknown: BGMU requires the $2,000 deposit at application “regardless of size,” then bills the actual cost of labor, equipment, excavation, pipe, backfill and any road cut and repair, refunding an overpayment or invoicing the difference. A short, easy attachment in an unpaved yard could come in under $2,000; a long run under a street could cost more. If the sewer connection needs a manhole cored rather than a standard tap, add a $400 Manhole Core Fee, paid before BGMU does the coring.

What Bowling Green’s fees don’t cover

BGMU’s tap fee covers the physical tap into its water main, and the meter fee covers the meter itself. The sewer attachment deposit covers BGMU’s own crew excavating, laying pipe and restoring the surface out to the point of attachment. These costs are extra and not part of the totals above:

For example, 60 feet of water line at $50 and 60 feet of sewer lateral at $100 add about $9,000 in private work. These are national benchmark figures, not Bowling Green quotes. See water service line cost and sewer lateral cost, and model your own lot here:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

How and when Bowling Green fees are paid

Bowling Green vs. Lexington and Louisville

Bowling Green’s single-utility model is simpler than the split systems to its north. In Lexington, Kentucky American Water and LFUCG bill separately, and the total for a small lot is $2,922.50, built from a $1,223 water tapping fee and an LFUCG sewer tap-on fee that rises with lot size. In Louisville, Louisville Water’s published water charges for a 3/4-inch service are $1,825, while MSD has no flat sewer tap fee at all — it bills the actual construction cost plus a $250 administrative fee. Bowling Green’s $4,000 published total for a 5/8-inch home sits well above Lexington’s small-lot figure and Louisville’s water-only figure, mainly because BGMU folds a substantial, though refundable-if-overpaid, sewer deposit into the upfront cost rather than charging a smaller flat privilege fee. Unlike Lexington’s sewer fee, which rises with lot size, and unlike Louisville’s, which depends on whether the lot is in a bonded subdivision, Bowling Green’s flat tap and meter fees do not vary by lot size or location within the service area.

Upcoming changes in Bowling Green

BGMU’s Meter Charges and Miscellaneous Service Fees sheet carries a “Rev. Date October, 2025” line and its Rules and Regulations were “Approved November, 2025,” both recent documents with no announced increase pending as of this check. BGMU’s rules state that its Rules and Regulations and rate schedules “may be revised, amended, supplemented or otherwise changed from time to time, without notice,” so confirm current amounts with BGMU’s office (270-782-1200, 801 Center Street) before you budget a project, especially the sewer attachment’s actual final cost, which BGMU does not publish in advance.

Ask BGMU for a written estimate of your sewer attachment’s likely final cost before you apply. The $2,000 figure is only the deposit; the real bill is whatever BGMU’s crew actually spends on excavation, pipe, backfill and any road cut and repair for your specific lot.

Bowling Green tap fee FAQ

How much does a water tap cost in Bowling Green, KY?

BGMU charges a flat $400 Water Main Line Tap Fee for all main line taps regardless of size, plus a separate Water Meter Fee based on size: $1,600 for the standard 5/8-inch meter or $2,000 for a 1-inch meter. Both are due when you apply, before BGMU does the work.

How much does a sewer connection cost in Bowling Green?

BGMU requires a $2,000 deposit at application for any sewer attachment, regardless of size. The final charge is based on BGMU’s actual time and materials to excavate, install pipe, backfill and restore the site; if the actual cost is less than $2,000 you get a refund, and if it is more you get an invoice for the difference.

Who supplies water, sewer and electric in Bowling Green?

Bowling Green Municipal Utilities (BGMU), a city-owned utility, supplies all three from one office. BGMU buys electricity wholesale from TVA. Its published new-service fees show a $35 application fee for a new electric account, but no separate electric tap or line-extension fee schedule for new construction.

Is there a separate fee to open a new BGMU account?

Yes. BGMU charges a $30 application fee for a new water and/or wastewater account and $35 for a new electric account, collected at application. These are account-opening charges, not connection fees, so they are kept out of the tap and meter totals above.

What if my new sewer connection needs a manhole cored?

Coring an existing manhole, regardless of size, is a separate $400 fee, paid before the work is done. The contractor excavates and marks the manhole, BGMU cores it and installs the boot, and the contractor then connects the new sewer or lateral, which BGMU inspects.

Do developers pay different fees than a single homeowner?

Yes. A developer extending a water or sewer main pays a Development Review Fee of $1,000 (lines 8 inches or smaller, under 3,000 linear feet) or $1,500 for larger projects, plus construction inspection fees BGMU estimates on a per-project worksheet. A homeowner tapping an existing main that already fronts the lot pays only the standard tap, meter and sewer attachment charges above.

Where to go next from Bowling Green

Compare Bowling Green with Lexington and Louisville, or see the full tap fees by city table. Related guides: tap fee vs. impact fee, sewer connection cost, water meter installation cost and the utility connection cost calculator.

Bowling Green fee sources