CFPUA Water & Sewer Tap and System Development Charges: Wilmington, NC (2026)

Last reviewed: By Utility Cost Guide editor

In Wilmington, the Cape Fear Public Utility Authority (CFPUA) provides both water and sewer. With a standard 5/8-inch meter on a lot where the developer’s contractor built the services, the fiscal 2027 total is $6,050: a $2,270 water system development charge, a $3,465 sewer system development charge and a $315 meter set fee (CFPUA Rates and Fees Schedule FY 26-27, effective July 1, 2026). If CFPUA installs the water and sewer connections itself instead, the meter set fee comes off and a $2,463 water connection and a $2,928 sewer connection go on. That total is $11,126. Meter size is the other thing to settle early. A plain 1-inch meter raises both system development charges by 2.5 times, but a 1-inch meter that is required only for a home fire sprinkler system is charged the 5/8-inch rate.

Wilmington connection fees at a glance

The table lists every CFPUA row we verified from the FY2027 schedule. Three kinds of charge matter most. System development charges (SDCs) are CFPUA’s buy-in to capacity that already exists. North Carolina authorizes them under G.S. Chapter 162A, Article 8, and CFPUA’s ordinance says they are based on meter size and due when you apply for new service. Connection fees apply only when CFPUA crews install the water or sewer service. The meter set fee applies instead when a licensed contractor installed the water service and CFPUA only supplies and sets the meter (Ordinance Sec. 1-97(2)). The calculator below starts from the contractor-built case ($6,050 at 5/8 inch). It lists the sewer connection fee, which applies only when CFPUA installs the sewer service, together with the deposit, new-account and plan review rows as other published fees outside that total.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
General — Account Setup
GeneralAccount SetupNew Service Charge—$60flat fee2026-07-01Official source2026-09-24
General — Deposit
GeneralDepositUtility Deposit, Single-Family Residential—$200flat fee2026-07-01Official source2026-09-24
General — Plan Review
GeneralPlan ReviewPlan Review - Services only (no NCDEQ water and/or sewer permits)—$300flat fee2026-07-01Official source2026-09-24
Sewer — Capacity
SewerCapacitySewer System Development Charge, 1 1/2" meter1 1/2"$17,235by meter size2026-07-01Official source2026-09-24
SewerCapacitySewer System Development Charge, 1" (Single-Family Residential with fire sprinkler system)1"$3,465by meter size2026-07-01Official source2026-09-24
SewerCapacitySewer System Development Charge, 1" meter1"$8,663by meter size2026-07-01Official source2026-09-24
SewerCapacitySewer System Development Charge, 2" meter2"$27,720by meter size2026-07-01Official source2026-09-24
SewerCapacitySewer System Development Charge, 5/8" meter5/8"$3,465by meter size2026-07-01Official source2026-09-24
Sewer — Connection
SewerConnectionSewer Service Connection Fee, 4" service (installation fee by service size)—$2,928flat fee2026-07-01Official source2026-09-24
Water — Capacity
WaterCapacityWater System Development Charge, 1 1/2" meter1 1/2"$11,350by meter size2026-07-01Official source2026-09-24
WaterCapacityWater System Development Charge, 1" (Single-Family Residential with fire sprinkler system)1"$2,270by meter size2026-07-01Official source2026-09-24
WaterCapacityWater System Development Charge, 1" meter1"$5,675by meter size2026-07-01Official source2026-09-24
WaterCapacityWater System Development Charge, 2" meter2"$18,160by meter size2026-07-01Official source2026-09-24
WaterCapacityWater System Development Charge, 5/8" meter5/8"$2,270by meter size2026-07-01Official source2026-09-24
Water — Connection
WaterConnectionWater Service Connection Fee, 1" service (service line connection by service size)
CFPUA installs the service connection
1"$2,463flat fee2026-07-01Official source2026-09-24
Water — Meter Set
WaterMeter SetMeter Set Fee, 1" (includes labor and materials)
Contractor-installed service; meter set fee
1"$415by meter size2026-07-01Official source2026-09-24
WaterMeter SetMeter Set Fee, 5/8" (includes labor and materials)5/8"$315by meter size2026-07-01Official source2026-09-24
WaterMeter SetMeter Set Fee, 5/8" Split Service5/8"$655by meter size2026-07-01Official source2026-09-24

Worked example: a new home in Wilmington

Assumptions: one detached house inside CFPUA’s water and sewer service area, one domestic meter, FY2027 charges (July 1, 2026 to June 30, 2027), and a 4-inch sewer service where CFPUA installs it. No separate irrigation meter.

One-time CFPUA charges for one house, by scenario (source: CFPUA Rates and Fees Schedule FY 26-27).

Charge A. Contractor-built services, 5/8″ B. CFPUA installs, 5/8″ C. Contractor-built, 1″ (no sprinkler) D. Contractor-built, 1″ for fire sprinkler
Water system development charge $2,270 $2,270 $5,675 $2,270
Sewer system development charge $3,465 $3,465 $8,663 $3,465
Meter set fee $315 not charged $415 $415
Water service connection fee (1″ service) not charged $2,463 not charged not charged
Sewer service connection fee (4″ service) not charged $2,928 not charged not charged
Total $6,050 $11,126 $14,753 $6,150

The arithmetic: A is $2,270 + $3,465 + $315 = $6,050. B is $2,270 + $3,465 + $2,463 + $2,928 = $11,126. C is $5,675 + $8,663 + $415 = $14,753. D is $2,270 + $3,465 + $415 = $6,150.

Scenario C shows why the meter decision matters so much here. Going from 5/8 inch to a plain 1 inch adds $8,603 in system development charges alone. A contractor installing a residential fire sprinkler system that needs a 1-inch meter adds only $100, the gap between the $415 and $315 meter set fees.

One point we could not settle from the schedule. It lists a single water connection fee, for a 1-inch service, and the ordinance ties the meter set fee to contractor-installed services, while Sec. 1-5(c) has the applicant pay the connection fee “for the service and meter.” We read that to mean the $2,463 covers the meter when CFPUA does the installation, and scenario B is built that way. Confirm it with CFPUA Customer Service (910-332-6550) before you budget.

How Wilmington compares with Raleigh and Charlotte

On a developer-built lot CFPUA costs more than Raleigh and slightly less than Charlotte. When the utility installs both services, it is the cheapest of the three.

Official one-time water and sewer charges, single-family home, 5/8-inch meter, FY2027 (Raleigh and Charlotte figures from our Raleigh and Charlotte tap fee pages).

Case Wilmington (CFPUA) Raleigh Water Charlotte Water
Services already built by the developer $6,050 $3,960 $6,727
Utility installs water and sewer services $11,126 $14,871 $17,370

The pattern comes from two sources. CFPUA’s capacity charges are the heaviest part of its bill: $5,735 in combined SDCs at 5/8 inch, against $3,670 in capital facility fees in Raleigh ($1,447 + $2,223) and $6,519 in system development fees in Charlotte ($1,453 + $5,066). Its installation charges are the lightest: $5,391 for both services, compared with $10,911 in Raleigh ($5,756 + $5,155) and $10,851 in Charlotte ($4,407 + $6,444). (Raleigh’s tap is priced for a 3/4-inch service.)

What Wilmington’s fees don’t cover

CFPUA’s charges cover capacity, the meter and, where CFPUA does the work, the service connection to the property. Your builder or plumber prices the private side of the connection separately:

These ranges come from our national benchmark set and assume normal soil. See water service line cost, sewer lateral cost and utility trenching cost. No electric line-extension charge is included on this page. For the bigger picture, see our guide to the cost to connect to city water. Add the private work to CFPUA’s charges here:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

Paying Wilmington fees: timing and process

CFPUA’s Development Process & Procedures Manual (June 2024) sets the order. After the plat is recorded and the lot has an address, you open a CFPUA utility account online or at a CFPUA Customer Service Center. New Hanover County runs the building permit program for both the City of Wilmington and the unincorporated county. CFPUA signs off on the permit only after the account is set up and the applicable fees are paid, usually within 10 business days.

The ordinance adds the payment points. SDCs are due at the application for new service, and connection fees are paid or financed on application, before CFPUA installs anything (CFPUA Ordinance Sec. 1-97). When the plumbing is ready, the plumbing contractor schedules the meter set with Customer Service at 910-332-6550. If the work is incomplete or not to CFPUA standards, the meter set is rescheduled and a $60 premise visit fee is charged for each additional visit. The initial inspection of contractor-installed connections is free, and a repeat initial inspection is $60.

New accounts also pay a $60 new service charge, and single-family residential customers may be asked for a $200 deposit, adjusted for the services provided and payment history. Neither is in the totals above. The owner of an improved property where a CFPUA sewer line is available but not connected pays a monthly availability charge of $18.11 for a 5/8-inch service.

Wilmington fee changes to watch

CFPUA adopts a new rates and fees schedule with each budget, effective July 1. Comparing the FY2026 schedule with FY2027: the connection fees rose on July 1, 2025, from $2,239 to $2,463 for water and from $2,662 to $2,928 for sewer, and held flat on July 1, 2026. The system development charges ($2,270 water, $3,465 sewer at 5/8 inch) did not change across FY2025, FY2026 and FY2027. If your service application will fall after June 30, 2027, check the FY2028 schedule on CFPUA’s Current Rates & Fees page.

Wilmington connection fee questions

How much are water and sewer tap fees for a new house in Wilmington, NC?

For FY2027, CFPUA charges $6,050 for a single-family home with a 5/8-inch meter when a contractor built the services, and $11,126 when CFPUA installs the water and sewer connections. Both figures include the $2,270 water and $3,465 sewer system development charges.

What is a CFPUA system development charge?

It is a one-time buy-in to the capacity of CFPUA’s existing water and wastewater systems, authorized by G.S. 162A Article 8 and set by meter size. It is due when you apply for new service, before CFPUA signs off on the building permit.

Does a fire sprinkler system increase my CFPUA fees?

Only slightly. If a single-family home needs a 1-inch meter for a residential fire sprinkler system, CFPUA charges the 5/8-inch system development charges ($2,270 water, $3,465 sewer). The meter set fee is $415 instead of $315. A 1-inch meter without a sprinkler system pays $5,675 and $8,663.

When does CFPUA charge a connection fee instead of a meter set fee?

Connection fees ($2,463 water, $2,928 sewer) apply only when CFPUA itself installs the service connection. When a licensed contractor installs the water service, as the developer’s contractor does in a new subdivision built under CFPUA’s development process, CFPUA charges the $315 meter set fee for a 5/8-inch meter instead, and no sewer connection fee is listed for a contractor-built sewer service.

Do I need a deposit for new CFPUA service?

The FY2027 schedule lists a $200 deposit for single-family residential customers, adjusted for the services provided and prior payment history. New accounts also pay a $60 new service charge.

More on Wilmington and nearby cities

Compare Wilmington with Raleigh, Charlotte and Concord on the North Carolina utility connection costs hub, or see the national tap fees by city table. Background: tap fee vs. impact fee, sewer tap fees, water meter installation cost and utility costs for new construction. For a full budget, use the utility connection cost calculator.

Wilmington fee sources