Buckeye Water and Wastewater Impact Fees (2026)
The City of Buckeye Water Resources Department provides water and sewer to most new homes in the city, though not all of it: parts of Buckeye get water from Arizona Water Company or EPCOR, and some get sewer from EPCOR. For a city-served single-family home, the water and wastewater development (impact) fees in effect since May 5, 2025 add up to $17,060 in the Central service area ($9,536 water plus $7,524 wastewater). A home in Sundance, which is on Central water but has its own sewer area, pays $14,935, and one in Tartesso West pays $11,395. One caveat outweighs the rest: if your subdivision plat was approved before May 5, 2025, the earlier fee schedule can still apply for 24 months after the first building permit.
Buckeye tap and connection charges at a glance
The table below lists every Buckeye row we recorded. The five development fee rows come from the city’s 2025 development fee report, which the City Council adopted by resolution on February 18, 2025. They are charged per dwelling unit, and the amount depends on the service area, not on the meter size. The four Utility Billing rows (new account fee, deposits and a “Global Area Connection Fee”) come from the Schedule of Fees attached to Resolution No. 32-26, which the City Council adopted on May 5, 2026. The schedule took effect June 4, 2026.
| Service | Category | Fee | Meter | Amount | Basis | Effective | Source | Verified |
|---|---|---|---|---|---|---|---|---|
| Sewer — Deposit | ||||||||
| Sewer | Deposit | Deposits - Residential - Sewer | — | $60 | flat fee | 2026-06-04 | Official source | 2026-09-25 |
| Sewer — Impact | ||||||||
| Sewer | Impact | Wastewater Facilities Development Fee - Central service area, Low/Med Density (<8 DU/acre) Central | — | $7,524 | per unit | 2025-05-05 | Official source | 2026-09-24 |
| Sewer | Impact | Wastewater Facilities Development Fee - Sundance service area, Low/Med Density (<8 DU/acre) Sundance | — | $5,399 | per unit | 2025-05-05 | Official source | 2026-09-24 |
| Sewer | Impact | Wastewater Facilities Development Fee - Tartesso West service area, Low/Med Density (<8 DU/acre) Tartesso West | — | $7,672 | per unit | 2025-05-05 | Official source | 2026-09-24 |
| Water — Account Setup | ||||||||
| Water | Account Setup | New Account Processing Fee | — | $60 | flat fee | 2026-06-04 | Official source | 2026-09-25 |
| Water — Connection | ||||||||
| Water | Connection | Global Area Connection Fee | — | $3,000 | flat fee | 2026-06-04 | Official source | 2026-09-25 |
| Water — Deposit | ||||||||
| Water | Deposit | Deposits - Residential - Water | — | $85 | flat fee | 2026-06-04 | Official source | 2026-09-25 |
| Water — Impact | ||||||||
| Water | Impact | Water Facilities Development Fee - Central service area, Low/Med Density (<8 DU/acre) Central service area (incl. Sundance and Westpark) | — | $9,536 | per unit | 2025-05-05 | Official source | 2026-09-24 |
| Water | Impact | Water Facilities Development Fee - Tartesso West service area, Low/Med Density (<8 DU/acre) Tartesso West | — | $3,723 | per unit | 2025-05-05 | Official source | 2026-09-24 |
How Buckeye service areas change the fee
The 2025 update merged the water service areas. Central now covers the city’s system south of Interstate 10 and north of the Gila River, including the old Central Buckeye, Sundance and Westpark areas. Tartesso West is a separate system. Wastewater still has three areas, drawn along drainage basins: Central (which absorbed the old Watson Road CFD area), Sundance and Tartesso West. The 2025 development fee report sets these amounts for a low- or medium-density home (fewer than 8 units per acre):
City of Buckeye water and wastewater development fees per single-family unit, effective May 5, 2025
| Fee | Central | Sundance | Tartesso West |
|---|---|---|---|
| Water facilities fee | $9,536 | $9,536 (Central water area) | $3,723 |
| Wastewater facilities fee | $7,524 | $5,399 | $7,672 |
| Total | $17,060 | $14,935 | $11,395 |
The report shows how each figure was built. In the Central area, water capacity costs $17.53 per gallon of peak-day demand, and the city assumes a house uses 544 gallons on a peak day, so 544 × $17.53 = $9,536. The Central wastewater fee works the same way: 173 gallons of average daily flow at $43.49 per gallon comes to $7,524. Tartesso West water is cheaper at $5.71 per gallon because the fee there only repays the developer who built the existing system, and the report says the city will stop collecting it once that repayment is done.
What a new Buckeye house pays: worked example
Assumptions: one detached home at under 8 units per acre, on a plat approved after May 5, 2025, with city water and sewer. Three locations:
Estimated official city charges, single-family home
| Charge | A: Central | B: Sundance | C: Tartesso West |
|---|---|---|---|
| Water facilities development fee | $9,536 | $9,536 | $3,723 |
| Wastewater facilities development fee | $7,524 | $5,399 | $7,672 |
| Utility development fees | $17,060 | $14,935 | $11,395 |
| New account processing fee (effective June 4, 2026) | $60 | $60 | $60 |
| Total | $17,120 | $14,995 | $11,455 |
The residential water and sewer deposits ($85 and $60 on the same schedule) are account deposits, not connection costs, so we left them out. So is the $3,000 “Global Area Connection Fee,” because the schedule does not say which properties pay it. We found no separate published charge for installing a new residential meter.
How Buckeye compares with Phoenix
Buckeye’s growth-area pricing looks like Phoenix‘s, but the totals differ a lot. Phoenix charges $7,467 in water and wastewater impact fees for an infill home in its “Balance of City” area and $29,322 in its Northwest growth area (meter of 1 inch or smaller, effective June 23, 2025). A Central Buckeye home at $17,060 falls between the two. Phoenix also charges a separate $2,009 water resource acquisition fee in Off-Project areas. Buckeye’s 2025 report has no fee by that name. Separately, a city rate-case fact sheet says nearly every Buckeye home is a member of the Central Arizona Groundwater Replenishment District, which is funded through property taxes.
Water and wastewater impact fees, single-family home
| Location | Water | Wastewater | Total |
|---|---|---|---|
| Buckeye, Central | $9,536 | $7,524 | $17,060 |
| Buckeye, Tartesso West | $3,723 | $7,672 | $11,395 |
| Phoenix, Balance of City | $6,396 | $1,071 | $7,467 |
| Phoenix, Northwest | $20,442 | $8,880 | $29,322 |
Phoenix water figures include its treatment, resource acquisition and transmission fees; wastewater includes treatment and collection.
What is not included in Buckeye fees
Buckeye’s rate-case materials say new development builds its own water and sewer infrastructure and then dedicates it to the city, so the mains in a subdivision are paid for by the developer, not through these fees. Everything on your lot is private work. The city also charges non-utility development fees (fire, police, parks, library and streets), which we did not record here. National estimates for the private work (methodology):
- Water service line from the meter to the house: $30–$150 per foot, typical $50, trenching included. A 40-foot run is about $2,000.
- Sewer lateral: $50–$250 per foot, typical $100, trenching included. A 60-foot run is about $6,000.
- Plumbing permit: $100–$1,300, typical $300.
Estimate utility connection costs
Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.
Paying Buckeye fees: timing and process
The development fees are part of the building permit process. The city’s FAQ bases the grandfathering rule on the date the first building permit is issued. The meter comes afterward. According to the city’s water meter installation guide, you first get the permit from Development Services, then wait about ten business days while Utility Billing sets up the account and creates a service order. Meter Services then installs the meter within seven business days. The meter box must be installed to city standards, sized for the meter, clear of debris and not in a driveway, and the lot number and address must be posted.
If your lot is served by Arizona Water or EPCOR, the city’s water or wastewater fees above do not apply to that service. The 2025 report leaves those areas out of the city’s service areas, so ask the company that serves your lot what it charges.
What could change in Buckeye
- The development fees took effect May 5, 2025. Arizona law requires the land use assumptions and infrastructure plan to be updated at least every five years, and the city FAQ says revised water and wastewater demand tables are in progress. The 2025 report sets fees for meters larger than 1.5 inches from engineering-standard demand, so check the current version if your project needs one.
- New monthly water and sewer rates were adopted May 5, 2026 (Resolution No. 32-26) and took effect June 4, 2026, with scheduled increases each January 1 from 2027 through 2029.
- The report says the city will stop collecting Tartesso West water and wastewater fees once the developer is fully reimbursed. It does not give a date.
Buckeye tap fee FAQ
How much are water and sewer impact fees in Buckeye, AZ?
For a single-family home on a plat approved after May 5, 2025, the city’s water and wastewater development fees total $17,060 in the Central area, $14,935 in Sundance and $11,395 in Tartesso West. They are charged per dwelling unit, whatever the meter size.
Does Buckeye charge a water tap or meter installation fee for a new home?
We found no published per-meter installation price for a new residential meter. The city’s meter guide explains the permit-then-work-order process, and the 2026 rate schedule lists a $60 new account fee and account deposits ($85 water, $60 sewer) rather than a tap fee.
My subdivision was platted before 2025. Which fees apply?
According to the city’s impact fee FAQ, a single-family subdivision with an approved plat keeps its existing fee schedule for 24 months after the first building permit is issued. After that, the 2025 fees apply, and a plat change that adds units brings the new or increased fees for the added units.
Why is Tartesso West water cheaper?
Its $3,723 water fee only repays the developer for the existing system, at $5.71 per gallon of peak-day demand, compared with $17.53 per gallon in the Central area, where the city is building new wells, treatment and storage. Tartesso West wastewater is actually the highest of the three areas, at $7,672.
Who provides water if the city doesn’t?
The 2025 development fee report says Arizona Water and EPCOR serve some areas inside the city limits and EPCOR provides wastewater in some areas. Those areas are outside the city’s fee service areas, so ask the company that serves your lot what it charges.
Where to go next from Buckeye
Arizona utility connection costs · Phoenix water and sewer tap fees · Tucson water and sewer connection fees · tap fee vs impact fee · water tap fee · utility connection cost calculator
Buckeye fee sources
- Land Use Assumptions, Infrastructure Improvements Plan, and Development Fee Report (February 18, 2025), City of Buckeye / TischlerBise. Checked Sep 24, 2026.
- Resolution No. 04-25 adopting development fees (effective May 5, 2025), City of Buckeye. Checked Sep 24, 2026.
- Impact Fees Frequently Asked Questions (June 17, 2025), City of Buckeye. Checked Sep 24, 2026.
- Resolution No. 32-26 and Exhibit A, Schedule of Fees (May 5, 2026 council meeting packet, pp. 1120–1126), City of Buckeye. Adoption confirmed in the May 5, 2026 council minutes. Checked Sep 25, 2026.
- Notice of Continuance and Proposed Utility Rates, Rate Components, Fees, or Service Charges, City of Buckeye. Checked Sep 24, 2026.
- 2025 Water Rate Adjustment, City of Buckeye Water Resources. Checked Sep 24, 2026.
- Development fact sheet and CAGRD, CFDs and HOAs fact sheet, City of Buckeye rate-case materials. Checked Sep 25, 2026.
- Water Meter Installation Process guide, City of Buckeye Water Resources. Checked Sep 24, 2026.