The Detroit Water and Sewerage Department (DWSD) supplies water and sanitary sewer service to Detroit addresses and buys treated water and sewer treatment wholesale from the regional Great Lakes Water Authority (GLWA); GLWA bills DWSD and its other member communities at a wholesale rate and doesn’t publish a per-tap fee for individual homeowners, so DWSD’s own retail schedule is what a new Detroit house actually pays. For a new single-family home connecting to both water and sewer, DWSD’s published Schedule of Fees comes to $1,450 in the ordinary case: a $150 plan review, a $650 water permit inspection, and a $650 sewer permit inspection. Unlike many cities, Detroit’s schedule doesn’t price the tap or the meter by size — DWSD doesn’t charge a separate tap or meter fee at all, because the homeowner’s own licensed Master Plumber or contractor supplies the materials and performs the excavation, service-line installation, and main tap under DWSD inspection. The most important caveat: many Detroit infill lots carry an old, disconnected water service from a demolished house, and DWSD’s schedule doesn’t say whether reconnecting that line replaces or adds to the standard $650 water inspection fee — see the worked examples below.
Official Detroit fees in one table
The table below lists every DWSD charge we verified from the city’s Schedule of Fees and Penalties for fiscal year 2026-27 (effective July 1, 2026, unchanged from FY2025-26). Three rows form the standard new-tap case: the combined plan-review fee, which covers water and sewer together on one line, plus the separate $650 water and $650 sewer permit inspections. The rest are situational — a second review cycle, non-residential zoning, the reconnection permit for a reusable existing line, demolition-related water disconnection, and a stormwater plan review whose applicability to one home isn’t stated — and are flagged rather than folded into the default total.
| Service | Category | Fee | Meter | Amount | Basis | Effective | Source | Verified |
|---|---|---|---|---|---|---|---|---|
| General — Plan Review | ||||||||
| General | Plan Review | Water and/or Sewer Service Permit Plan Review (Non-Residential Zoning, 1st Review Cycle) | — | $700 | per permit application, 1st review cycle | 2026-07-01 | Official source | 2026-09-26 |
| General | Plan Review | Water and/or Sewer Service Permit Plan Review (Residential Zoning, 1st Review Cycle) | — | $150 | per permit application, 1st review cycle | 2026-07-01 | Official source | 2026-09-26 |
| General | Plan Review | Water and/or Sewer Service Permit Plan Review (Residential Zoning, Each Subsequent Review Cycle) | — | $75 | per resubmittal cycle beyond the first | 2026-07-01 | Official source | 2026-09-26 |
| Sewer — Inspection | ||||||||
| Sewer | Inspection | Sewer Permit Inspection | — | $650 | per permit (fee relative to scope of work) | 2026-07-01 | Official source | 2026-09-26 |
| Stormwater — Plan Review | ||||||||
| Stormwater | Plan Review | Stormwater Management Plan Review (Preliminary Review, As-Built Review, and Inspection) | — | $2,550 | per project | 2026-07-01 | Official source | 2026-09-30 |
| Water — Inspection | ||||||||
| Water | Inspection | Water Permit Inspection | — | $650 | per permit (fee relative to scope of work) | 2026-07-01 | Official source | 2026-09-26 |
| Water — Other | ||||||||
| Water | Other | Demolition Water Line Disconnection | — | $1,000 | per disconnection (restoration billed separately, up to $500-$15,000 by surface type) | 2026-07-01 | Official source | 2026-09-26 |
| Water — Permit | ||||||||
| Water | Permit | Water Service Line Reconnection Permit | — | $650 | per permit | 2026-07-01 | Official source | 2026-09-30 |
Worked example for a single-family home in Detroit
Assumptions: a detached single-family home in Detroit’s “Residential Zoning, Four (4) Units or Less” tier, connecting to both DWSD water and sewer, tap and service line installed by a City-registered Master Plumber (water) and Master Plumber or registered contractor (sewer).
Published DWSD service-permit charges, single-family, effective July 1, 2026
| Charge | A: Standard new tap, approved 1st cycle | B: Plans need a 2nd review cycle | C: Reusing an existing service line |
|---|---|---|---|
| Water and/or Sewer Service Permit Plan Review | $150 | $225 | $150 |
| Water Permit Inspection | $650 | $650 | — |
| Water Service Line Reconnection Permit | — | — | $650 |
| Sewer Permit Inspection | $650 | $650 | $650 |
| Total | $1,450 | $1,525 | $1,450–$2,100 |
Case A is the baseline: DWSD approves the plans on the first submittal, and both taps are brand new. Case B adds DWSD’s $75 fee per plan-review cycle beyond the first, only owed if DWSD sends the plans back for revision. Case C covers a common Detroit scenario: a lot where an earlier house was demolished and DWSD approves reusing the old water service line instead of a fresh tap. DWSD lists a separate $650 Water Service Line Reconnection Permit here, but doesn’t state whether it replaces the $650 Water Permit Inspection for the same job or is billed on top of it — budget $1,450 to $2,100 and confirm with DWSD Permits.
Why there’s no published tap or meter fee
DWSD’s own Water & Sewer Service Permit Application Guide states plainly: “Plumber/Contractor does all work under Detroit Water and Sewerage Department (DWSD) inspection, including supplying all materials, excavating, laying pipe, tapping of main/sewer, etc.” DWSD’s role is plan review, permitting, and inspection — not performing or pricing the physical connection. The service line, tap, and meter setting are a private contract with the homeowner’s licensed plumber, which is why they aren’t DWSD line items and aren’t broken out by meter size the way many other cities’ tap fees are.
Costs outside the Detroit fee schedule
DWSD’s charges cover plan review and its own inspections. Everything else — materials, labor, excavation, the service line, and the physical tap — is priced privately by the homeowner’s licensed plumber or contractor, and a Right-of-Way permit from City of Detroit DPW (or MDOT/Wayne County Road Commission, depending on the street) is required for every new tap with no dollar figure published. National estimates (methodology):
- Water service line: $30–$150 per foot, typical $50. DWSD requires 5 feet of minimum pipe cover and caps service lines at 130 feet without a waiver.
- Sewer lateral: $50–$250 per foot, typical $100. DWSD requires new sewer taps to be 6 inches in diameter with 4 feet of minimum cover.
- Street cut or bore: $1,000–$10,000 per crossing, typical $4,000 — relevant if the tap opens a paved street rather than an alley.
- Plumbing permit: $100–$1,300, typical $300, issued by the City of Detroit’s Buildings, Safety, Engineering, and Environmental Department (BSEED), not DWSD.
- Electric service: DTE Energy supplies electricity in Detroit. We found no published new-service connection fee for a standard single-family home on DTE’s site — ask DTE directly for your address.
Estimate utility connection costs
Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.
Paying Detroit fees: timing and process
DWSD’s process runs plan review before permit, and permit before physical work. The Master Plumber (or an authorized agent) submits engineering plans through DWSD’s online portal; a fire-line project also needs a flow test, hydraulic calculations, and Fire Marshal approval first. Once DWSD approves the plans, the applicant gets a ROW permit, then files the Water and Sewer Service Permit application with a property legal description, the plumber’s or contractor’s City registration and insurance, and signed statements of understanding. DWSD invoices the $150 (or $700 non-residential) plan-review fee here, payable at DWSD’s customer portal; a complete package becomes an issued permit in about 3–5 business days, valid one year. The plumber or contractor then does the physical work and must call DWSD’s inspection line at least 7 business days before backfilling — that inspection is what the $650 water and $650 sewer fees pay for. Finally, the Master Plumber calls DWSD’s Permit Unit at least 5 days ahead to schedule the water meter-set appointment; DWSD sets the meter itself, and we found no separate published fee for it.
Detroit fee changes to watch
- DWSD’s FY2026-27 Schedule of Fees (effective July 1, 2026) kept the plan-review, inspection, and reconnection-permit amounts identical to FY2025-26 — no increase this cycle for a single-family tap.
- FY2026-27 added a new “Easement Encroachment Permit Fee” ($300) not on the FY2025-26 schedule; its relevance to a standard new tap isn’t stated.
- Figures here are current as of our September 26, 2026 check. Fees are set by the Detroit Board of Water Commissioners and the document itself says they’re “subject to change.”
Detroit tap fee FAQ
How much is a water and sewer tap fee in Detroit, Michigan?
For a new single-family home connecting to both DWSD water and sewer, approved on the first plan review with no reused service line, the published charges total $1,450: a $150 plan review, a $650 water permit inspection, and a $650 sewer permit inspection, effective July 1, 2026.
Does DWSD charge separately for the water tap or the meter?
No. DWSD’s schedule has no tap fee or meter-installation fee. Its own Permit Application Guide states the homeowner’s licensed plumber or contractor supplies all materials and performs the excavation, pipe-laying, and main tap under DWSD inspection; DWSD’s role is the plan review and the $650 inspection, not the physical connection.
Does the Detroit tap fee depend on the meter size?
No. Unlike cities that price the tap by meter size, DWSD charges the same flat $150 plan-review and $650/$650 inspection fees regardless of meter size for a residential (four units or less) property.
What if my new home is being built on a lot with an old water service line?
DWSD allows reusing a previously disconnected but usable line, subject to a Master Plumber’s certification and DWSD review (lead lines are flagged for replacement). This routes through a separate $650 Water Service Line Reconnection Permit; DWSD’s schedule doesn’t say whether that replaces or adds to the $650 water inspection fee, so budget $1,450–$2,100 and confirm with DWSD Permits.
Does the Great Lakes Water Authority (GLWA) charge Detroit homeowners a connection fee?
No. GLWA sells treated water and sewer treatment wholesale to member partner communities, including DWSD, and bills those communities directly at a wholesale rate — not a per-tap fee to individual homeowners.
How long does it take to get a DWSD water or sewer permit in Detroit?
DWSD says a complete permit package is typically processed into an issued permit within 3–5 business days, though complex projects or unpaid invoices take longer. The permit is valid for one year from issue.
Related guides for Detroit
For another Michigan schedule, see Grand Rapids water and sewer tap fees, which charges by meter size where Detroit charges a flat plan-review-and-inspection fee. For comparison, see Columbus water and sewer capacity charges, Charlotte water and sewer impact fees, and Nashville water and sewer tap fees.
tap fees by city · water tap fee · sewer tap fee · utility extension cost · water meter installation cost · utility connection cost calculator
Detroit fee sources
- DWSD Schedule of Fees and Penalties, FY2026-27 (effective July 1, 2026), Detroit Water and Sewerage Department. Checked Sep 26, 2026.
- DWSD Schedule of Fees and Penalties, FY2025-26 (prior-year figures, used to confirm no change), Detroit Water and Sewerage Department. Checked Sep 26, 2026.
- Request a DWSD Permit, Detroit Water and Sewerage Department. Checked Sep 26, 2026.
- Water or Sewer Service Permit process diagram, Detroit Water and Sewerage Department. Checked Sep 26, 2026.
- Water & Sewer Service Permit Application Guide (Requirements to Issue DWSD Permit; Water & Sewer Service Installation Requirements), Detroit Water and Sewerage Department. Checked Sep 26, 2026.
- DWSD Service Connection Standards, Detroit Water and Sewerage Department. Checked Sep 26, 2026.
- Member Partners – Wholesale Charges, Great Lakes Water Authority. Checked Sep 26, 2026.