McKinney Water & Sewer Tap and Impact Fees (2026)

Last reviewed: By Utility Cost Guide research team

The City of McKinney provides water and wastewater service inside the city and publishes both its tap fees and its impact fees. For a new single-family home with a 3/4-inch meter on a lot where the taps are already in place, the charges are about $3,907: $1,754 water impact, $1,643 wastewater impact and a $510 meter set. With a 1-inch meter and new city-built water and sewer taps, the total rises to about $9,318. The caveat: McKinney’s impact fees depend on the lot’s final plat date (there are five historical tables), and the current table was adopted in 2020, so confirm it before you rely on it.

Official fees at a glance

The table lists every McKinney row in our database with its source. The tap and meter-set rows come from the city’s fee schedule effective October 1, 2025 (FY2026) and are verified; each tap row shows the “tap only” price with a range up to the price that includes pavement repair and boring. The impact-fee rows are from Schedule 2, Table E, which applies to final plats recorded on or after December 1, 2020. The city still lists it as current, but because it was adopted in 2020 we mark it for review.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Sewer — Impact
SewerImpactWastewater Impact Fee (Schedule 2, Table E)1"$2,744by meter size2020-12-01Official source2026-09-24 Needs review
SewerImpactWastewater Impact Fee (Schedule 2, Table E)3/4"$1,643by meter size2020-12-01Official source2026-09-24 Needs review
Sewer — Tap
SewerTap4-inch sewer tap only$1,630–$3,600flat fee2025-10-01Official source2026-09-24
Water — Impact
WaterImpactWater Impact Fee (Schedule 2, Table E)1"$2,929by meter size2020-12-01Official source2026-09-24 Needs review
WaterImpactWater Impact Fee (Schedule 2, Table E)3/4"$1,754by meter size2020-12-01Official source2026-09-24 Needs review
Water — Meter Set
WaterMeter Set1-inch meter set1"$565by meter size2025-10-01Official source2026-09-24
WaterMeter Set3/4-inch meter set3/4"$510by meter size2025-10-01Official source2026-09-24
Water — Tap
WaterTap1-inch water tap only1"$1,450–$2,775flat fee2025-10-01Official source2026-09-24

Worked example: a new single-family home

Assumptions: detached house inside city limits, final plat recorded on or after December 1, 2020. Tap and meter-set figures from the McKinney fee schedule (FY2026); impact fees from Impact Fee Schedule 2, Table E (needs review).

McKinney charges for one home in four cases. Tap fees apply only when the city makes a new tap.

Line item A: 3/4″, taps in place B: 1″, taps in place C: 1″, city taps (tap only) D: 1″, taps with bore & pavement repair
Water impact fee $1,754 $2,929 $2,929 $2,929
Wastewater impact fee $1,643 $2,744 $2,744 $2,744
Meter set (in city) $510 $565 $565 $565
1″ water tap $1,450 $2,775
4″ sewer tap $1,630 $3,600
Total $3,907 $6,238 $9,318 $12,613

The step from a 3/4-inch to a 1-inch meter costs $2,331 in these tables ($6,238 − $3,907), almost all in impact fees. The tap choice matters as much: a plain tap on each line is $3,080 ($1,450 + $1,630), with pavement repair it is $3,930 ($1,950 + $1,980), and with a bore plus pavement repair it is $6,375 ($2,775 + $3,600).

Outside city limits the meter set doubles: $1,020 for a 3/4-inch meter and $1,130 for a 1-inch meter. On Case A that would make the total $4,417 instead of $3,907.

Older plats use older tables. McKinney keeps five historical impact-fee tables keyed to the final plat date, and we have recorded only Table E. If your lot was platted before December 1, 2020, look up the matching table on the city’s impact fees page.

What these fees don’t include

National figures are estimates from our benchmark set. Add your own line lengths to McKinney’s fees here:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

How and when you pay

McKinney’s tap fees are set in its Code of Ordinances (Appendix A, Section 110-139 for water taps and Section 110-228 for sewer taps) and are paid when the city makes the tap. The meter set is charged separately and at a higher rate outside city limits. Impact fees are selected by the lot’s final plat date, so the plat is the document to pull first. The city’s published documents do not state standard wait times for taps or meter sets; ask when you apply.

The impact fees here come from a 2020 table that the city still lists as current. Before you close on a lot or price a build, ask the city to confirm which table applies to your plat and whether a newer one is pending.

Changes to watch

McKinney tap fee FAQ

How much are McKinney’s water and wastewater impact fees?

For final plats recorded on or after December 1, 2020, Table E lists $1,754 water and $1,643 wastewater for a 3/4-inch meter ($3,397) and $2,929 and $2,744 for a 1-inch meter ($5,673). The table dates from 2020, so confirm it.

How much does McKinney charge for a water tap?

A 1-inch water tap is $1,450 for the tap only, $1,950 with pavement repair and $2,775 with a bore and pavement repair, effective October 1, 2025.

How much is a sewer tap in McKinney?

A 4-inch sewer tap is $1,630 for the tap only, $1,980 with pavement repair and $3,600 with a bore and pavement repair.

Does it cost more to connect outside McKinney city limits?

The meter set does: $1,020 for 3/4 inch and $1,130 for 1 inch, double the in-city rates of $510 and $565.

Which impact-fee table applies to my lot?

The one in effect on the lot’s final plat date. McKinney has five historical tables; Table E covers plats recorded on or after December 1, 2020.

Related: Texas utility connection costs by city · Frisco fees · Fort Worth fees · water tap fees · sewer tap fees · tap fee vs. impact fee · utility connection cost calculator

Sources