Houston Water & Wastewater Impact Fees (2026)

Last reviewed: By Utility Cost Guide editor

Inside the City of Houston, water and wastewater come from Houston Public Works (Houston Water), and the connection charge that matters is the impact fee, priced per service unit. For applications accepted after June 30, 2026, the city’s fee schedule lists $2,553.11 for water and $1,830.24 for wastewater per service unit, and one service unit is one typical single-family home, so a new house owes $4,383.35 in impact fees and about $4,572 once the published permit and inspection items are added. These are the rates that took effect July 1, 2026; applications accepted as administratively complete by June 30, 2026 kept the prior rate. Houston re-indexes the fees every July 1, so the next change is due July 1, 2027.

Houston tap and connection charges at a glance

The table shows every Houston row in our database with its source. The two impact-fee rows carry the July 1, 2026 rates; the meter inspection and sewer permit rows carry the January 1, 2026 rates. Houston’s schedule is a citywide list of every department’s fees, so the connection-related lines are scattered: impact fees sit under Houston Public Works, the meter inspection under City Code Section 47-18(c), and the sewer connection line under the plumbing section of the building code.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Sewer — Impact
SewerImpactWastewater Impact Fee - fee per service unit, collected—$1,830.24per service unit (EDU)2026-07-01Official source2026-09-24
Sewer — Permit
SewerPermitBuilding Code - Plumbing: Sewer Connection, each—$53.71flat fee2026-01-01Official source2026-09-24
SewerPermitSewer Tap Permit Fee—$34.50flat fee2026-01-01Official source2026-09-24
Water — Impact
WaterImpactWater Impact Fee - fee per service unit, collected—$2,553.11per service unit (EDU)2026-07-01Official source2026-09-24
Water — Inspection
WaterInspectionWater meter inspection of a 2-inch or smaller meter—$100.71flat fee2026-01-01Official source2026-09-24

Worked example for a single-family home in Houston

Assumptions: one detached house, one service unit, water meter 2 inches or smaller, water and wastewater both from the City of Houston, figures from the City of Houston fee schedule (Houston Public Works).

Published City of Houston charges for one single-family connection, applications accepted after June 30, 2026.

Line item Basis Amount
Water impact fee $2,553.11 × 1 service unit $2,553.11
Wastewater impact fee $1,830.24 × 1 service unit $1,830.24
Water meter inspection (2″ or smaller) flat $100.71
Sewer tap permit flat $34.50
Plumbing permit line: sewer connection, each flat, on top of the base plumbing permit $53.71
Subtotal $4,572.27
Administrative fee, where applicable flat $33.56
Total with administrative fee $4,605.83

The impact fees are $4,383.35 of the $4,572.27 subtotal, about 96 percent. Because Houston indexes them to the Producer Price Index each July 1 (City Code Sections 47-316(b) and 47-384(b)), the useful sensitivity is simple: every 1 percent change in the combined rate at the next July 1 adjustment moves the bill by about $43.83.

Houston’s figures are low next to other large Texas cities. For comparison, San Antonio’s SAWS charges $7,343 to $11,528 in impact fees for a 5/8-inch meter, and Austin Water charges $7,700 on a post-2023 plat. What Houston’s schedule does not show is the price of the physical tap, which is where the rest of the cost sits.

Costs outside the Houston fee schedule

We did not find a published City of Houston charge for making the water tap or setting the meter on a new single-family service. That is a gap in what the city publishes, not evidence that the work is free. Ask the permitting center who builds the tap for your lot and at what price. Beyond that, the private work is yours:

National figures are estimates from our benchmark set. The calculator lets you add them to Houston’s official fees:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

Paying Houston fees: timing and process

Houston ties impact fees to capacity. The wastewater fee is linked to a Wastewater Capacity Reservation letter, which carries its own fees; we did not find those amounts in the schedule we checked. For how this capacity-based charge compares with the sewer allocation fees of six other cities, see the sewer allocation fee guide. Connection to the public sewer is required when a property is within 300 feet of a City sewer main (City Code Sections 47-11 and 47-12), which is also what triggers the $34.50 sewer tap permit.

The city’s Impact Fee Administration office handles the impact-fee side. The Houston Permitting Center announced the July 1, 2026 increase with the same per-unit figures as the citywide fee schedule, which is where the figures here come from. The Houston Public Works impact fee memo gives background on how the fees are set but is not a current rate sheet.

Houston’s water and sewer fees apply only inside the City of Houston’s service area. A Houston mailing address does not guarantee City service; parcels served by a municipal utility district (MUD) or another provider pay that provider’s charges. Confirm your provider before using these numbers.

Houston fee changes to watch

Houston impact fee FAQ

What is Houston’s water and wastewater impact fee per service unit?

For applications accepted after June 30, 2026, the city fee schedule lists $2,553.11 for water and $1,830.24 for wastewater per service unit, $4,383.35 combined. The next adjustment is due July 1, 2027.

What is a service unit in Houston?

A service unit is the demand of one typical single-family residence. A single-family house is charged one service unit for water and one for wastewater.

Do I have to connect to Houston’s sewer?

If the property is within 300 feet of a City sewer main, connection is required under City Code Sections 47-11 and 47-12. The sewer tap permit is $34.50, plus a $53.71 sewer-connection line on the plumbing permit.

Why do Houston impact fees change every year?

City Code ties them to the Producer Price Index and adjusts them each July 1. Budget for a small increase if your application falls after that date.

I live in a MUD. Do these fees apply?

Not if your water and sewer come from a municipal utility district or another provider. These figures are for City of Houston customers only; a MUD sets its own charges.

Related: Texas utility connection costs by city · San Antonio (SAWS) fees · Austin Water fees · tap fee vs. impact fee · sewer connection cost · water meter installation cost · utility connection cost calculator · sewer tap fee

Sources for Houston figures