Round Rock Water & Wastewater Impact Fees (2026)

Last reviewed: By Utility Cost Guide editor

Inside Round Rock, the City of Round Rock supplies water and wastewater service, and almost all of the connection cost is the city’s water and wastewater impact fee, charged per living unit equivalent (LUE). For a new single-family home with a 5/8-inch meter on a lot whose plat was recorded after January 1, 2024, the city’s published charges come to $8,353: a $4,912 water impact fee, a $2,921 wastewater impact fee, a $320 water meter fee and a $200 water/sewer line fee. A 3/4-inch meter counts as 1.5 LUEs, which pushes the impact fees alone to $11,749.50. The biggest caveat is the plat date. Round Rock publishes six older rate tiers, and a house in a subdivision platted before 2005 pays $3,969 in impact fees instead of $7,833.

Official Round Rock fees in one table

The table below lists every Round Rock row in our database, each linked to the city page or code section it came from. Most of the numbers come from the city’s building-inspection page for new single-family construction, which lists the permit-stage fees and the impact fee schedule in one place. Read the impact fees in two steps. First find your tier: Round Rock picks the rate by the date the subdivision plat was recorded, not by the date of your building permit. Then multiply by your meter’s LUE count. The city’s table sets a 5/8-inch meter at 1 LUE, a 3/4-inch meter at 1.5 and a 1-inch meter at 2.5. The $100 deposit and $25 service connection fee are account charges, and the oversize fees are listed with the city code’s subdivision fees rather than the building-permit fees, so none of the three is in our typical total.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
General — Connection
GeneralConnectionWater/Sewer Line Fee—$200flat fee—Official source2026-09-24
Sewer — Impact
SewerImpactSewer Impact Fee—$2,073per equivalent residential unit2012-08-01Official source2026-09-24
SewerImpactSewer Impact Fee—$2,383per equivalent residential unit2009-01-01Official source2026-09-24
SewerImpactSewer Impact Fee—$1,306per equivalent residential unit2005-01-01Official source2026-09-24
SewerImpactSewer Impact Fee—$1,059per equivalent residential unit—Official source2026-09-24
SewerImpactWastewater Impact Fee—$2,921per equivalent residential unit2024-01-01Official source2026-09-24
SewerImpactWastewater Impact Fee—$1,799per equivalent residential unit2021-02-01Official source2026-09-24
SewerImpactWastewater Impact Fee—$2,099per equivalent residential unit2016-03-01Official source2026-09-24
Sewer — Other
SewerOtherWastewater oversize fee—$150per equivalent residential unit—Official source2026-09-24
Water — Account Setup
WaterAccount SetupService connection fee—$25flat fee—Official source2026-09-24
Water — Deposit
WaterDepositResidential water services deposit—$100per unit—Official source2026-09-24
Water — Impact
WaterImpactWater Impact Fee—$4,912per equivalent residential unit2024-01-01Official source2026-09-24
WaterImpactWater Impact Fee—$4,234per equivalent residential unit2021-02-01Official source2026-09-24
WaterImpactWater Impact Fee—$4,025per equivalent residential unit2016-03-01Official source2026-09-24
WaterImpactWater Impact Fee—$3,889per equivalent residential unit2012-08-01Official source2026-09-24
WaterImpactWater Impact Fee—$4,446per equivalent residential unit2009-01-01Official source2026-09-24
WaterImpactWater Impact Fee—$4,296per equivalent residential unit2005-01-01Official source2026-09-24
WaterImpactWater Impact Fee—$2,910per equivalent residential unit—Official source2026-09-24
Water — Meter
WaterMeterWater Meter Fee (5/8)5/8"$320by meter size—Official source2026-09-24
Water — Other
WaterOtherWater oversize fee—$150per equivalent residential unit—Official source2026-09-24

Worked example: a new home in Round Rock

Assumptions: a detached house inside city limits and served by the City of Round Rock, on a lot whose plat was recorded after January 1, 2024. All figures come from the city’s New Residential Single Family Construction page (checked September 24, 2026).

Round Rock water and wastewater charges for one home by meter size, current (post-2024 plat) impact fee tier.

Line item 5/8-inch meter (1 LUE) 3/4-inch meter (1.5 LUE)
Water impact fee ($4,912 per LUE) $4,912.00 $7,368.00
Wastewater impact fee ($2,921 per LUE) $2,921.00 $4,381.50
Water meter fee $320.00 not published
Water/sewer line fee $200.00 $200.00
Total $8,353.00 $11,949.50 + meter fee

The city page lists a meter fee only for the 5/8-inch size, so the 3/4-inch column is incomplete. Ask the Planning and Development Services front desk (512-218-5428) for the larger meter’s charge before you budget.

How the plat date changes the total for the same 5/8-inch home, with the same $520 in meter and line fees:

The three other tiers run from $5,602 (2005 to 2008) to $6,829 (2009 to July 2012) in impact fees per LUE. The city page prints the start of that 2009 tier as “January 1, 200,9”, which we read as 2009.

What Round Rock’s fees don’t cover

The city’s charges cover the impact fees, the meter and the line fee. The page does not say what the $200 water/sewer line fee pays for, so do not assume it covers any pipe on your lot. The work between the street and the house is private and paid separately:

National figures are estimates from our benchmark set, not Round Rock quotes. To combine the city’s fees with your own line lengths:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

When you pay Round Rock connection fees

Upcoming changes in Round Rock

Round Rock’s impact fee drops sharply for older plats, but the tier is fixed by the subdivision’s recorded plat, not by when you buy the lot. A new house on a 2003 plat still pays the pre-2005 rate.

How Round Rock compares with Austin, Georgetown and Leander

For a 5/8-inch meter on a lot platted after each city’s most recent fee update, Round Rock’s $8,353 is close to Austin Water’s roughly $8,119 and well below Leander’s $11,503. At 3/4 inch, Round Rock’s impact and line fees reach $11,949.50 before the meter fee. That is already near Austin’s full charge of about $11,997 and far below Leander’s $17,109.50. Georgetown is the outlier at about $24,494 at its current rates, though it counts a standard home as one service unit regardless of meter size.

Round Rock tap fee FAQ

How much are Round Rock’s water and wastewater impact fees in 2026?

For plats recorded after January 1, 2024, the city charges $4,912 for water and $2,921 for wastewater per LUE. A standard home with a 5/8-inch meter is 1 LUE, so the impact fees total $7,833. Adding the $320 meter fee and $200 line fee brings the published total to $8,353.

Why does my builder quote a lower impact fee?

Round Rock charges the rate that matches the date your subdivision plat was recorded. The city lists seven tiers. For plats recorded after February 1, 2021, the rate is $4,234 plus $1,799 per LUE. For plats recorded before 2005 it is $2,910 plus $1,059. Call the city at 512-218-5428 to confirm your plat date.

Does a bigger water meter cost more in Round Rock?

Yes. The impact fee is multiplied by the meter’s LUE count. A 3/4-inch meter is 1.5 LUEs, so the current impact fees rise from $7,833 to $11,749.50. A 1-inch meter is 2.5 LUEs, or $19,582.50 in impact fees.

Is the roadway impact fee part of the tap fee?

No. The roadway impact fee took effect on January 1, 2020 and is phased in by final plat date. It is collected with the building permit, but it pays for roads, not water or sewer, so we leave it out of the utility totals on this page.

Do I have to pay a water deposit in Round Rock?

A residential customer pays a $100 water services deposit per dwelling unit when applying for service, and it also covers sewer and garbage. The city waives it for an existing customer who, in the prior 12 months, had no more than one late payment and no disconnection for nonpayment, among other conditions. A new customer can qualify with a letter of credit from another utility showing the same record.

Related: Texas utility connection costs by city · tap fee vs. impact fee · water tap fees · sewer tap fees · water meter installation cost · Austin fees · Georgetown fees · Leander fees · utility connection cost calculator

Sources for Round Rock figures