Raleigh Water Tap & Capital Facility Fees (2026)

Last reviewed: By Utility Cost Guide research team

Raleigh Water, the City of Raleigh’s public utility, provides water and sewer to addresses inside its service area and charges a new house two kinds of one-time fees: capital facility fees for system capacity, and tap fees when city crews install the service lines. Under the FY27 Development Fee Guide (effective July 1, 2026), a home with a 5/8-inch meter pays $1,447 (water capital facility fee) + $2,223 (sewer capital facility fee) + $290 (meter) = $3,960 when the service stubs already exist. If the city must also tap the mains, add $5,756 for the 3/4-inch water service and $5,155 for the 4-inch sewer service, for $14,871. The key local limit is the road: the city does not install taps across divided roads or streets 45 feet or wider, so on those lots you cannot count on a city tap.

Official fees at a glance

The table lists every verified Raleigh Water row from the FY27 guide (pages 33 to 35). Three groups matter for a house. Capital facility fees (City Code 8-2092 and 8-2092.1) are the capacity buy-in and scale with water meter size. The sewer fee is keyed to the water meter too. Tap fees (Ordinance 8-2039) are lump-sum prices for city crews to install a water or sewer service from the main. You pay them only if the city does that work. The meter charge (City Code 8-2005) covers the meter itself. The guide says the capital facility fees are unchanged from FY26. Some other fees in the guide are indexed to construction costs, 2.43% for FY27.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Sewer — Capacity
SewerCapacitySewer Capital Facility (SCF) Fee (City Code 8-2092)1"$5,558by meter size2026-07-01Official source2026-09-24
SewerCapacitySewer Capital Facility (SCF) Fee (City Code 8-2092)3/4"$3,335by meter size2026-07-01Official source2026-09-24
SewerCapacitySewer Capital Facility (SCF) Fee (City Code 8-2092)5/8"$2,223by meter size2026-07-01Official source2026-09-24
Sewer — Tap
SewerTapSewer Tap Fee - 4-inch sewer (installation of sewer services)$5,155flat fee2026-07-01Official source2026-09-24
Water — Capacity
WaterCapacityWater Capital Facility (WCF) Fee (City Code 8-2092.1)1"$3,618by meter size2026-07-01Official source2026-09-24
WaterCapacityWater Capital Facility (WCF) Fee (City Code 8-2092.1)3/4"$2,171by meter size2026-07-01Official source2026-09-24
WaterCapacityWater Capital Facility (WCF) Fee (City Code 8-2092.1)5/8"$1,447by meter size2026-07-01Official source2026-09-24
Water — Meter
WaterMeterWater Meter Charge (City Code 8-2005)1"$420by meter size2026-07-01Official source2026-09-24
WaterMeterWater Meter Charge (City Code 8-2005)5/8"$290by meter size2026-07-01Official source2026-09-24
Water — Tap
WaterTapWater Tap Fee - installation of water services (Ordinance 8-2039)1"$6,032by meter size2026-07-01Official source2026-09-24
WaterTapWater Tap Fee - 3/4-inch split water (new application)3/4"$859flat fee2026-07-01Official source2026-09-24
WaterTapWater Tap Fee - installation of water services (Ordinance 8-2039)3/4"$5,756by meter size2026-07-01Official source2026-09-24

Worked example: a new single-family home

Assumptions: one detached house on a street narrower than 45 feet and not divided, domestic water only, the FY27 guide in effect. The cases differ by whether service stubs exist and by meter size.

Raleigh Water FY27 one-time charges for one house, by scenario (source: City of Raleigh Development Fee Guide FY27, effective July 1, 2026).

Charge A. Subdivision lot, stubs in place, 5/8″ meter B. Infill lot, city installs both taps, 5/8″ meter C. Infill lot, city installs both taps, 1″ meter
Water capital facility fee $1,447 $1,447 $3,618
Sewer capital facility fee $2,223 $2,223 $5,558
Water tap (city-installed service) not charged $5,756 (3/4″ service) $6,032 (1″ service)
Sewer tap (4″ service) not charged $5,155 $5,155
Meter charge $290 $290 $420
Total $3,960 $14,871 $20,783

The arithmetic: A is $1,447 + $2,223 + $290 = $3,960. B adds the two taps: $3,960 + $5,756 + $5,155 = $14,871. C is $3,618 + $5,558 + $6,032 + $5,155 + $420 = $20,783.

In case B, roughly three quarters of the bill ($10,911 of $14,871) is installation, not capacity. That is why the same house can cost about $11,000 less in city fees on a subdivision lot where the developer already built the stubs. Scenario B also assumes a 5/8-inch meter on the 3/4-inch city-installed service line. The guide prices taps by service size and meters by meter size, and we read it that way. Confirm the pairing with Raleigh Water if your plans call for something else.

A 3/4-inch meter falls between the two. Its capital facility fees are $2,171 (water) and $3,335 (sewer), $5,506 together. The FY27 guide lists no meter charge for a 3/4-inch meter, so ask Raleigh Water what it will bill before you budget that size. For a lawn system, a 3/4-inch split water tap is $859 on a new application and $1,775 on an existing one.

What these fees don’t include

None of Raleigh’s charges pay for the private pipe on your lot. After the city’s work ends at the stub, a contractor still has to connect the house:

A house set 70 feet back with typical conditions would add roughly 70 × $50 = $3,500 for water and 70 × $100 = $7,000 for sewer, before trenching. Those figures come from our national benchmark set, not from Raleigh. Build your own total with the calculator:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

How and when you pay

The FY27 guide sets the prices. It does not print one universal payment moment for every fee, so confirm timing with Raleigh Water when you apply. What the guide does say:

Raleigh publishes its fees by fiscal year, and some are indexed to construction costs. A quote or builder sheet dated before July 1, 2026 was likely priced on the FY26 guide. The capital facility fees did not change between FY26 and FY27, but indexed fees did, so ask for a quote on the current guide.

Changes to watch

Raleigh issues the Development Fee Guide by fiscal year, so the next edition would cover FY28, starting July 1, 2027. Capital facility fees held flat for FY27. Indexed fees rose 2.43%. We track the guide and will update the rows here when the new edition is posted.

Frequently asked questions

How much does it cost to connect a new house to Raleigh water and sewer?

City fees under the FY27 guide range from $3,960 for a lot with existing stubs and a 5/8-inch meter to $14,871 when the city installs both taps. With a 1-inch meter and city taps, the total is $20,783. Private plumbing from the stub to the house is extra.

What is Raleigh’s capital facility fee?

It is a one-time capacity charge under City Code 8-2092 (sewer) and 8-2092.1 (water). For a 5/8-inch meter in FY27 it is $1,447 for water and $2,223 for sewer. The sewer fee also scales with the water meter size.

Will the City of Raleigh install my water tap?

Usually, for a lump-sum tap fee of $5,756 for a 3/4-inch water service and $5,155 for a 4-inch sewer service. The city does not tap across divided roads or streets 45 feet or wider. In those cases, ask Raleigh Water how the connection must be made.

Did Raleigh’s water fees go up in 2026?

The capital facility fees did not change from FY26 to FY27. Some other fees in the guide are indexed to construction costs, and that index rose 2.43% for FY27.

What is the $50 Not Ready fee?

Raleigh Water charges it when crews come to set a meter but the service stub is missing or not built to standard. Have your plumber confirm the stub before you request the meter.

Related pages