Philadelphia Water Department Tap Fees and PWD Connection Charges (2026)
The Philadelphia Water Department (PWD) supplies both water and sewer service to nearly every address in the city, and it publishes its connection charges in one place: its own “Rates and Charges” tariff, effective September 1, 2026. For a typical new single-family home — a standard 3/4-inch ferrule tap with a 5/8-inch meter, a standard 5-inch or 6-inch sewer lateral connection, and the Utility Plan Review that Philadelphia’s Administrative Code requires before L&I will issue a building permit — PWD’s own numbers add up to $1,345: a $245 water connection (ferrule) charge, a $360 meter charge, a $375 sewer connection permit fee, and a $365 Utility Plan Review fee. The most important local wrinkle: PWD’s own connection-pipe rule sets a 3/4-inch minimum tap size, and its fee table doesn’t offer a 5/8-inch ferrule at all — so even a home with the smallest standard meter still pays the 3/4-inch tap rate, not a smaller one.
Philadelphia connection fees at a glance
Every row below comes from two PWD documents: the “Rates and Charges” tariff (water connection/ferrule charges, meter charges, and the Utility Plan Review fee, all effective September 1, 2026) and Chapter 5 of PWD’s Regulations, “Sewer and Wastewater Control” (Section 504.14, sewer connection permit fees). Read it in three groups: the water connection (ferrule) charges are set by tap size, from 3/4 inch up to 2 inches; the meter charges are set by meter size, since PWD furnishes and installs every meter itself; and the sewer connection permit fees are set by connection method, with the 5-inch/6-inch core-drilled connection as the standard for a single-family lateral. A handful of surcharge rows (after-hours work, re-inspection, prohibited-connection approval) only apply in specific, non-routine situations, which each row’s notes explain.
| Service | Category | Fee | Meter | Amount | Basis | Effective | Source | Verified |
|---|---|---|---|---|---|---|---|---|
| General — Plan Review | ||||||||
| General | Plan Review | Utility Plan Review Fee | — | $365 | per utility plan | 2026-09-01 | Official source | 2026-09-26 |
| Sewer — Inspection | ||||||||
| Sewer | Inspection | Sewer Connection Re-inspection / Rescheduled Inspection Fee | — | $95 | per inspection | — | Official source | 2026-09-26 |
| Sewer — Other | ||||||||
| Sewer | Other | Additional Fee: Connection or Repair During Non-Business Hours | — | $80 | per connection | — | Official source | 2026-09-26 |
| Sewer | Other | Additional Fee: Generally Prohibited Connection, Approved | — | $140 | per approval | — | Official source | 2026-09-26 |
| Sewer | Other | Additional Sewer Connection Permit, Same Trench | — | $50 | per permit | — | Official source | 2026-09-26 |
| Sewer — Tap | ||||||||
| Sewer | Tap | Sewer Connection Permit Fee (5" or 6" Connection) 5-inch or 6-inch core-drilled connection (standard) | — | $375 | per connection | — | Official source | 2026-09-26 |
| Sewer | Tap | Sewer Connection Permit Fee (8" Saddle Connection) 8-inch saddle connection | — | $560 | per connection | — | Official source | 2026-09-26 |
| Sewer | Tap | Sewer Connection Permit Fee (8" Wye Connection) 8-inch wye connection | — | $665 | per connection | — | Official source | 2026-09-26 |
| Water — Meter | ||||||||
| Water | Meter | Water Meter Fee (Furnished and Installed by PWD, 1") 1-inch meter | 1" | $510 | by meter size | 2026-09-01 | Official source | 2026-09-26 |
| Water | Meter | Water Meter Fee (Furnished and Installed by PWD, 5/8") 5/8-inch meter (standard residential) | 5/8" | $360 | by meter size | 2026-09-01 | Official source | 2026-09-26 |
| Water — Tap | ||||||||
| Water | Tap | Water Connection Charge (Ferrule Connection, 1-1/2") 1-1/2-inch ferrule connection | 1-1/2" | $345 | by meter size | 2026-09-01 | Official source | 2026-09-26 |
| Water | Tap | Water Connection Charge (Ferrule Connection, 1") 1-inch ferrule connection | 1" | $280 | by meter size | 2026-09-01 | Official source | 2026-09-26 |
| Water | Tap | Water Connection Charge (Ferrule Connection, 2") 2-inch ferrule connection | 2" | $455 | by meter size | 2026-09-01 | Official source | 2026-09-26 |
| Water | Tap | Water Connection Charge (Ferrule Connection, 3/4", Outside Regular Business Hours) | 3/4" | $270 | by meter size | 2026-09-01 | Official source | 2026-09-26 |
| Water | Tap | Water Connection Charge (Ferrule Connection, 3/4") 3/4-inch ferrule connection (smallest offered) | 3/4" | $245 | by meter size | 2026-09-01 | Official source | 2026-09-26 |
Worked example for a single-family home in Philadelphia
Assumptions: a lot inside Philadelphia with a water main and sewer main already in the street, a routine residential connection (not a subdivision or a project needing a non-standard connection method), and PWD crews performing the tap and setting the meter during regular business hours. PWD’s Chapter 4 regulations set a 3/4-inch minimum for the water connection pipe and state it should match the meter size “except as otherwise provided” — and because PWD’s ferrule-connection table starts at 3/4 inch with no 5/8-inch row, a standard 5/8-inch-metered home is billed the 3/4-inch tap rate.
Estimated PWD charges, single-family, routine residential connection (Rates and Charges, effective Sept. 1, 2026; PWD Regulations Chapter 5, Section 504.14)
| Charge | A: 3/4″ tap, 5/8″ meter (standard) | B: 1″ tap, 1″ meter (larger home) |
|---|---|---|
| Water connection (ferrule) | $245 | $280 |
| Water meter (furnished & installed by PWD) | $360 | $510 |
| Sewer connection permit (5″/6″) | $375 | $375 |
| Utility Plan Review fee | $365 | $365 |
| Total published charges | $1,345 | $1,530 |
Case A is the standard single-family setup and the total this page leads with. Case B shows what changes if a larger home needs a 1-inch tap and meter instead: $185 more, all in the water-side charges, since the sewer connection fee and the Utility Plan Review fee don’t vary by water meter size. If PWD requires a non-standard sewer connection method instead of the standard core-drilled 5-inch/6-inch tie-in — an 8-inch saddle connection ($560) or an 8-inch wye connection ($665) — the sewer line of the table rises by $185 or $290, which is the only variable PWD’s schedule ties to the sewer connection itself rather than to the water side.
What PWD’s connection charge does and doesn’t cover
The $245 ferrule fee pays PWD to make the physical tap at the water main and install the ferrule fitting. It does not pay for the pipe from that ferrule to the house: PWD’s own Chapter 4 regulations state the property owner, at their own expense and through a licensed master plumber, must excavate for the connection and install all piping and appurtenances after the ferrule. The same split applies on the sewer side — the $375 permit fee is for PWD’s review and inspection of the connection to the public sewer, not for the private lateral pipe itself, which a licensed plumber installs separately.
What is not included in Philadelphia fees
PWD’s tariff and regulations cover the tap, the meter, the sewer connection permit, and the Utility Plan Review. They do not cover the water service line or sewer lateral pipe itself, trenching and backfill, or the plumbing permit that Philadelphia’s Department of Licenses and Inspections issues separately from PWD. We found no PWD-published system capacity fee, impact fee, or connection charge beyond the rows above in either the Rates and Charges tariff or PWD’s Regulations — that doesn’t rule one out, it means we couldn’t find one in the documents PWD has published where we could read it. National estimates (methodology):
- Water service line: $30–$150 per foot, typical $50. At 50 feet, about $2,500.
- Sewer service line/lateral: $50–$250 per foot, typical $100. At 50 feet, about $5,000.
- Street cut or bore: $1,000–$10,000 per crossing, typical $4,000.
- Plumbing permit: $100–$1,300, typical $300.
Estimate utility connection costs
Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.
How and when Philadelphia fees are paid
PWD’s published review-timeline guidance lays out the sequence: an applicant submits a Utility Plan, which PWD reviews (budgeted at about 8 weeks), then converts to a formal Water Connection Permit and/or Sewer Connection Permit application (about 2 more weeks). Only after the plan is approved does the PWD Permit Unit email an invoice for the connection and permit charges; the applicant pays that invoice before picking up the permits, not at the time of the initial application. Once permits are issued and installation is scheduled, PWD’s own crews perform the water tap and set the meter — PWD states this takes 5 to 7 business days for a connection of 2 inches or smaller (the size range that covers every residential case on this page), or 10 to 12 weeks for a 4-inch or larger connection. Counting the plan review, permit conversion, payment, and installation steps together, PWD’s guidance puts the full water-connection process at roughly 3 to 5 months and the sewer-only process at roughly 13 weeks. Contact PWD Development Services (215-685-0798, PWD_DevServices@phila.gov) to confirm the sequence and current wait times for a specific address.
What could change in Philadelphia
- PWD’s “Rates and Charges” document took effect September 1, 2026 and states so on its face; PWD’s Rate Board (a City body separate from the Pennsylvania Public Utility Commission) sets these rates and runs its own public rate-proceeding process, so confirm the current amount before paying if you’re reading this well after that date.
- The sewer connection permit fees come from Chapter 5 of PWD’s Regulations, a document that (unlike the Rates and Charges tariff) carries no fee-specific effective date printed in the section itself; PWD’s Regulations index page lists the current full regulations document as dated July 1, 2026. Confirm the $375/$560/$665 figures are still current with PWD’s Permit Desk (215-685-3015) before budgeting.
- We found no PWD-published system capacity fee, impact fee, or connection charge beyond the tap, meter, sewer permit, and Utility Plan Review rows on this page. If PWD assesses one for new single-family construction, it wasn’t in the documents we could read as of September 26, 2026 — ask PWD Development Services before you assume $1,345 is the full cost.
Philadelphia connection fee questions
How much is a water tap fee in Philadelphia?
PWD’s own Rates and Charges tariff prices a standard 3/4-inch ferrule connection — the tap into the water main — at $245 during regular business hours. That’s separate from the $360 charge for PWD to furnish and install the 5/8-inch meter that typically goes with it, so the water-side total for a standard single-family connection is $605.
Does Philadelphia charge a separate sewer connection fee?
Yes. PWD’s Regulations (Chapter 5, Section 504.14) set a $375 Sewer Connection Permit fee for the standard core-drilled connection to a 5-inch or 6-inch lateral, which is the minimum size PWD’s own rules require for a sanitary-only lateral. Non-standard connection methods cost more: $560 for an 8-inch saddle connection or $665 for an 8-inch wye connection.
Does Philadelphia charge a system capacity or impact fee for new water or sewer service?
We did not find one published by PWD. Its Rates and Charges tariff and Regulations cover the connection (ferrule or sewer tap), the meter, permit and plan-review fees, and various surcharges — but no separate capacity, impact, or system-development charge on top of those. That’s different from many fast-growing Sun Belt utilities, which charge one; its absence here doesn’t confirm Philadelphia has none, only that we couldn’t find one in PWD’s public documents.
Who installs the water meter in Philadelphia?
PWD does. Its Rates and Charges tariff prices “furnishing and installing water meters” as a PWD service, starting at $360 for the standard 5/8-inch residential size, and PWD’s own regulations require every metered connection to use a City-owned meter that the Department installs.
How long does it take to get a new water connection in Philadelphia?
PWD’s published review-timeline guidance puts the full process — Utility Plan review, permit conversion, invoice and payment, and PWD’s own installation crew making the tap and setting the meter — at roughly 3 to 5 months for a typical residential (2-inch or smaller) connection. The physical tap and meter-set itself is the fast part, at 5 to 7 business days once scheduled; most of the timeline is plan review and permit processing.
Does a bigger meter cost more in Philadelphia, even if the tap size is the same?
Yes, and in Philadelphia the tap size and meter size are tied together on PWD’s fee schedule rather than priced fully independently the way some cities do it. Moving from the standard 3/4-inch tap and 5/8-inch meter ($605 combined) to a 1-inch tap and 1-inch meter ($790 combined) adds $185 to the water-side total, without changing the $375 sewer connection fee or the $365 Utility Plan Review fee.
Related guides for Philadelphia
For other large Northeast/Mid-Atlantic cities with their own published fee schedules, see Pittsburgh Water’s $570 standard connection and Columbus’s water and sewer capacity charges.
tap fees by city · water tap fee · sewer tap fee · utility extension cost · water meter installation cost · utility connection cost calculator
Philadelphia fee sources
- Rates and Charges, Effective September 1, 2026, Philadelphia Water Department — Section 6.2 (water meter charges), Section 6.7 (water connection/ferrule charges), Section 8.3 (Utility Plan Review fee). Checked Sep 26, 2026.
- PWD Regulations, Chapter 5: Sewer and Wastewater Control, Philadelphia Water Department — Section 504.14 (sewer connection fees), Section 504.7 (minimum lateral size). Checked Sep 26, 2026.
- PWD Regulations, Chapter 4: Water, Philadelphia Water Department — Section 400.1 (connection pipe sizing), Section 400.2 (owner responsibility for piping past the ferrule), Section 401.1 (metering requirement). Checked Sep 26, 2026.
- Water, Sewer, & Hydrant Connections, Philadelphia Water Department, Development Services. Checked Sep 26, 2026.
- Review Timelines, Philadelphia Water Department, Development Services — process sequence and payment timing for Water and Sewer Connection Permits. Checked Sep 26, 2026.
- Rates, Philadelphia Water Department — links to the current tariff and the Philadelphia Water, Sewer, and Storm Water Rate Board. Checked Sep 26, 2026.