Virginia Beach Public Utilities Water & Sewer Connection Fees (2026)

Last reviewed: By Utility Cost Guide editor

Inside the City of Virginia Beach, the Department of Public Utilities provides both water and sewer, and it charges a one-time Capital Recovery Fee for each, keyed to meter size, to connect a new home. For the standard 5/8-inch meter, city-installed sewer with no pump station required, that’s $2,900 (water) + $2,521 (sewer) = $5,421. The number that changes this most is which of four sewer cases applies to your lot: city- or developer-installed pipe, and whether your sewer flows by gravity or has to be pumped into a city pump station. Those four cases run from $631 to $3,177 for sewer alone at a 5/8-inch meter, so the total can range from $3,531 to $6,077 before you even change meter size. Public Utilities doesn’t publish which case applies to a given address on this page — expect to confirm it by calling Utility Connections. For how this compares nationally, see our guide to the cost to connect to city water.

Official Virginia Beach fees in one table

Virginia Beach’s Capital Recovery Fee is not split into a labor charge and a buy-in charge the way some cities do it. Instead, one water figure and one sewer figure (per meter size) do that job, and the sewer figure itself has four variants depending on who built the pipe serving your lot (the city or a subdivision’s developer) and whether your sewer needs a pump station. Rows marked “Confirm with utility” below are from a 2023 notice that is not confirmed on the current fee page — treat them as a starting point, not a locked-in price.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Electric — Account Setup
ElectricAccount SetupElectric Service Connection Charge—$5.70flat fee—Official source2026-09-25
Sewer — Capacity
SewerCapacitySewer Capital Recovery Fee — City-installed, with connection to a city pump station
City-installed, with pump station
1"$7,941by meter size—Official source2026-09-25
SewerCapacitySewer Capital Recovery Fee — City-installed, without connection to a city pump station
City-installed, no pump station
1"$6,302by meter size—Official source2026-09-25
SewerCapacitySewer Capital Recovery Fee — Developer-installed, with connection to a city pump station
Developer-installed, with pump station
1"$3,215by meter size—Official source2026-09-25
SewerCapacitySewer Capital Recovery Fee — Developer-installed, without connection to a city pump station
Developer-installed, no pump station
1"$1,576by meter size—Official source2026-09-25
SewerCapacitySewer Capital Recovery Fee — City-installed, with connection to a city pump station
City-installed, with pump station
5/8"$3,177by meter size—Official source2026-09-25
SewerCapacitySewer Capital Recovery Fee — City-installed, without connection to a city pump station
City-installed, no pump station
5/8"$2,521by meter size—Official source2026-09-25
SewerCapacitySewer Capital Recovery Fee — Developer-installed, with connection to a city pump station
Developer-installed, with pump station
5/8"$1,287by meter size—Official source2026-09-25
SewerCapacitySewer Capital Recovery Fee — Developer-installed, without connection to a city pump station
Developer-installed, no pump station
5/8"$631by meter size—Official source2026-09-25
Water — Capacity
WaterCapacityWater Capital Recovery Fee1"$7,251by meter size—Official source2026-09-25
WaterCapacityWater Capital Recovery Fee5/8"$2,900by meter size—Official source2026-09-25
Water — Meter
WaterMeterDomestic Water Meter Fee1"$672by meter size2023-07-01Official source2026-09-25 Confirm with utility
WaterMeterDomestic Water Meter Fee5/8"$592by meter size2023-07-01Official source2026-09-25 Confirm with utility

What a new Virginia Beach house pays: worked example

Assumptions: a detached house inside Virginia Beach on a lot that already fronts a water main and a sewer main, assigned a 5/8-inch meter. Because the published sewer fee depends on who installed the pipe and whether it needs a pump station, the table below shows all four combinations Public Utilities lists, plus the 1-inch-meter case for a larger house.

Virginia Beach Capital Recovery Fees for one house, by scenario (source: Rates, Fees & Charges, City of Virginia Beach Public Utilities, checked Sep 25, 2026).

Scenario (5/8″ meter unless noted) Water Sewer Total
A. City-installed sewer, no pump station (base case) $2,900 $2,521 $5,421
B. City-installed sewer, with pump station $2,900 $3,177 $6,077
C. Developer-installed sewer, no pump station $2,900 $631 $3,531
D. Developer-installed sewer, with pump station $2,900 $1,287 $4,187
E. 1-inch meter, city-installed sewer, no pump station $7,251 $6,302 $13,553

The arithmetic is simple addition of the two published figures: A is $2,900 + $2,521 = $5,421; E is $7,251 + $6,302 = $13,553. What’s not simple is knowing which sewer column applies before you ask. “Developer-installed” almost certainly means the sewer main and lateral serving your lot were built and dedicated to the city by a subdivision’s developer, so the city didn’t have to fund that construction — that’s why cases C and D are far cheaper than A and B. If you’re buying a lot in an established, already-built part of the city rather than a brand-new subdivision, case A (city-installed, no pump) is the most defensible planning number, but Public Utilities Development Services should confirm it before you rely on it. Whether you need a pump station comes down to elevation and gravity flow at your specific address, which only the utility can determine.

On top of the Capital Recovery Fee, an August 2023 Public Utilities notice lists a separate charge for the physical domestic water meter: $592 for a 5/8-inch meter, $672 for 1-inch. That table doesn’t appear on the current Rates, Fees & Charges page, so we can’t confirm it’s still charged at that price — if it still applies, case A becomes roughly $6,013 rather than $5,421.

Costs outside the Virginia Beach fee schedule

The Capital Recovery Fee schedule doesn’t describe the physical work of tapping your service or laying your line the way some cities’ schedules do, and Public Utilities’ web pages don’t publish a connection-process document to fill that gap. Expect these costs on top of the city fee, most of them private work you or your builder pays for directly:

For a house set 60 feet back from the street, typical conditions add roughly 60 × $50 = $3,000 for the water line and 60 × $100 = $6,000 for the sewer lateral. Those per-foot figures already include trenching. They come from our national benchmark set, not from Virginia Beach. Build your own estimate here:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

Paying Virginia Beach fees: timing and process

This page covers addresses inside the City of Virginia Beach served directly by City of Virginia Beach Public Utilities. Sewer bills also carry a separate charge from HRSD, a regional agency, not the city. Confirm which utility and which sewer scenario apply to your specific parcel before relying on these figures for a budget or closing.

Upcoming changes in Virginia Beach

The Capital Recovery Fee amounts on this page match a Planning & Community Development notice dated August 7, 2023, which set them as the FY2024 rate (effective July 1, 2023) under City Code Sec. 37-7.1 (water) and Sec. 28-4.1 (sewer). We checked the live fee page on September 25, 2026, and the numbers are unchanged, and the city’s FY2027 rate announcement (effective July 1, 2026) only changed the recurring monthly water service availability fee, from $6.00 to $6.30, and the usage rate, from $6.23 to $6.54 per 1,000 gallons — it explicitly states there was no increase to the sewer fee. Those are monthly bill charges, not one-time connection fees, but a jump in a published capital recovery figure without a matching city announcement would be worth double-checking. The $592/$672 water meter fee is flagged needs-review because we could not find it anywhere on the current fee page; it may have changed, been folded into another charge, or simply not be listed online anymore.

Virginia Beach connection fee questions

How much does it cost to connect a new house to water and sewer in Virginia Beach?

City of Virginia Beach Public Utilities’ published Capital Recovery Fees for a 5/8-inch meter run from $3,531 to $6,077 depending on whether your sewer connection is city- or developer-installed and whether it needs a pump station; the base city-installed, no-pump case is $5,421 ($2,900 water + $2,521 sewer). A 1-inch meter raises the base case to $13,553.

Why does Virginia Beach charge four different sewer connection fees at the same meter size?

The published schedule splits the sewer Capital Recovery Fee by who installed the pipe serving your lot (the city or a subdivision developer) and whether your property needs a pump station rather than gravity flow. At a 5/8-inch meter those four cases run from $631 (developer-installed, no pump) to $3,177 (city-installed, with pump).

Is Virginia Beach’s “water service availability fee” a connection charge?

No. That $6.30-a-month charge (as of July 1, 2026) is a recurring line item on the monthly City Services Bill, separate from the one-time Capital Recovery Fee you pay to establish a new connection.

Is there a separate fee for the water meter itself?

A 2023 Public Utilities notice lists $592 for a 5/8-inch domestic water meter and $672 for 1-inch, on top of the Capital Recovery Fee. We could not confirm this table is still current on the live fee page, so verify it with Utility Connections before budgeting on it.

How does Virginia Beach compare to Richmond, VA?

Richmond’s Department of Public Utilities charges $9,370 total for a 5/8-inch meter (water service installation plus capacity plus wastewater inspection plus capacity) and $13,080 for a 1-inch meter. Virginia Beach’s base-case 5/8-inch total of $5,421 is lower, but Richmond’s published number folds in the city’s physical installation labor explicitly, while Virginia Beach’s schedule does not spell out whether that labor is included in the Capital Recovery Fee or billed separately — a real difference in what the number represents, not just its size.

Does Dominion Energy charge to connect electric service to a new home in Virginia Beach?

Dominion’s only published figure is a $5.70 charge to start service, billed on your first bill. That covers account activation, not new-construction electric work; Dominion prices line extensions and transformers for new construction on a per-project basis and does not publish a flat fee for it.

Related guides for Virginia Beach

Compare Virginia Beach with Richmond, VA. Richmond’s DPU charges $9,370 for a 5/8-inch meter and $13,080 for a 1-inch meter, with the city explicitly billing separate installation and capacity lines; Virginia Beach’s base-case $5,421 and $13,553 come from a single Capital Recovery Fee per service that varies instead by who installed the sewer pipe and whether it needs a pump station. See also tap fees by city, sewer lateral cost and tap fee vs. impact fee.

Virginia Beach fee sources