Celina Water & Sewer Tap and Impact Fees (2026)

Last reviewed: By Utility Cost Guide editor

The City of Celina provides water and wastewater service and charges the fees for connecting a new house to it. For a new single-family home with Celina’s minimum 1-inch meter, on a lot where the service lines are already in place, the published charges come to about $17,528: a $6,815 water impact fee, a $10,233 wastewater impact fee and a $480 meter fee. If the city has to make the water and sewer connections, the total rises to about $21,203. The caveat that matters most is the plat date: the current impact fees were adopted on August 12, 2025, and lots platted under the older tables pay much less. For how this compares nationally, see our guide to the cost to connect to city water.

Celina tap and connection charges at a glance

The impact fees below come from Ordinance 2025-71, passed August 12, 2025 and printed in the appendix of the city’s July 2025 Water & Wastewater Impact Fee Report. The meter, connection, boring and deposit rows come from the Master Fee Chart updated November 11, 2025. The 3/4-inch rows appear under other published fees because the fee chart sells that meter for existing meters only. The older impact-fee rows are marked for review: we read them in a report summary and a draft city worksheet, not in the ordinances.

ServiceCategoryFeeMeterAmountBasisEffectiveSourceVerified
Electric — Account Setup
ElectricAccount SetupConnect Fee (new service location or transfer)—$40flat fee—Official source2026-09-25
Sewer — Impact
SewerImpactSewer Impact Fee, single-family 1" simple meter (1.7 LUE), adopted 12/9/20141"$4,007by meter size2014-12-09Official source2026-09-30
SewerImpactWastewater Impact Fee, 1" displacement or electromagnetic/ultrasonic meter (1.0 SUE)1"$10,233by meter size2025-08-12Official source2026-09-25
SewerImpactWastewater Impact Fee, single-family 1" meter (2021 adopted rate)1"$5,200by meter size—Official source2026-09-30
SewerImpactWastewater Impact Fee, 3/4" meter (0.6 SUE)3/4"$6,395by meter size2025-08-12Official source2026-09-25
Sewer — Tap
SewerTapSewer Connection Boring Fee—$1,000flat fee—Official source2026-09-25
SewerTapSewer Connection Fee, 4" Tap—$1,500flat fee—Official source2026-09-25
Water — Deposit
WaterDepositWater Deposit, Residential—$200per unit—Official source2026-09-25
Water — Impact
WaterImpactWater Impact Fee, 1" displacement or electromagnetic/ultrasonic meter (1.0 SUE)1"$6,815by meter size2025-08-12Official source2026-09-25
WaterImpactWater Impact Fee, single-family 1" meter (2021 adopted rate)1"$4,400by meter size—Official source2026-09-30
WaterImpactWater Impact Fee, single-family 1" simple meter (1.7 LUE), adopted 12/9/20141"$4,981by meter size2014-12-09Official source2026-09-30
WaterImpactWater Impact Fee, 3/4" meter (0.6 SUE)3/4"$4,259by meter size2025-08-12Official source2026-09-25
Water — Meter
WaterMeterMeter Fee, 1" (minimum meter size)1"$480by meter size—Official source2026-09-25
WaterMeterMeter Fee, 3/4" (existing meters only)3/4"$415by meter size—Official source2026-09-25
Water — Tap
WaterTapWater Connection Boring Fee1"$1,200flat fee—Official source2026-09-25
WaterTapWater Connection Fee, 1" Access1"$2,175by meter size—Official source2026-09-25

Worked example for a single-family home in Celina

Assumptions: detached house inside Celina’s water and wastewater service area, one 1-inch meter (1.0 service unit), lot platted recently enough that the 2025 impact fees apply, no development agreement changing the fee. Impact fees from Ordinance 2025-71, Exhibit B; meter and connection fees from the Master Fee Chart (November 11, 2025).

City of Celina charges for one home, 1-inch meter. We count connection and boring fees only where the city makes the connection; the fee chart does not say when they apply.

Line item A: services in place B: city makes both connections C: connections with boring
Water impact fee, 1″ $6,815 $6,815 $6,815
Wastewater impact fee, 1″ $10,233 $10,233 $10,233
Meter fee, 1″ $480 $480 $480
Water connection, 1″ access — $2,175 $2,175
Sewer connection, 4″ tap — $1,500 $1,500
Boring fees (water $1,200 + sewer $1,000) — — $2,200
Total $17,528 $21,203 $23,403

Impact fees are 97 percent of Case A ($17,048 of $17,528). The fee chart says the standard connection fees do not include “extraordinary” costs such as street and easement repair or, for sewer, manholes; the city bills those at actual cost with an itemized list, so Case C is a floor, not a ceiling. The fee chart also lists a $200 residential water deposit per living unit, a utility-account charge that is not counted above.

The plat date changes the answer. The city’s own impact-fee worksheet (a draft, last updated September 10, 2026) asks for the lot’s plat date and uses it to pick the fee table, sorting lots into three groups:

Water plus wastewater impact fees for a single-family 1-inch meter, by plat-date group in the city’s draft worksheet.

Plat date (per draft worksheet) Table Water Wastewater Impact total With $480 meter
On or after Mar 12, 2025 2025 (Ord. 2025-71) $6,815 $10,233 $17,048 $17,528
Jul 13, 2021 – Mar 11, 2025 2021 adopted rate $4,400 $5,200 $9,600 $10,080
Before Jul 13, 2021 Adopted Dec 9, 2014 $4,981 $4,007 $8,988 $9,468

Moving from the 2021 table to the 2025 table raised the 1-inch impact total by $7,448 ($17,048 − $9,600), or about 78 percent. One date in that table does not line up: the draft worksheet starts the 2025 group on March 12, 2025, but Ordinance 2025-71 was passed on August 12, 2025 and took effect on passage and publication. The worksheet uses one plat-date setting for roadway and water/wastewater fees alike, and none of the documents we read explains the March date. Treat the plat-date cutoffs as the draft worksheet’s, not as confirmed rules, and if your lot was platted between March 12 and August 12, 2025, ask the city which table it uses.

If the house needs a bigger meter, the fees scale with it. Under Ordinance 2025-71 a 1-1/2-inch displacement meter counts as 1.3 service units ($8,518 water and $12,791 wastewater), and the meter itself is $1,730 instead of $480.

How Celina compares with Frisco and McKinney

Published city charges for a new single-family home with services already in place. Sources are on each city’s page.

City Meter Impact fees (water + sewer) Meter fee Total Impact table date
Celina 1″ $17,048 $480 $17,528 Aug 2025
McKinney 1″ $5,673 $565 (meter set) $6,238 Dec 2020
McKinney 3/4″ $3,397 $510 (meter set) $3,907 Dec 2020
Frisco 1″ $4,464 $835 (incl. $150 deposit) $5,299 2019

With the same 1-inch meter, Celina’s published charges are $11,290 more than McKinney’s ($17,528 − $6,238) and $12,229 more than Frisco’s ($17,528 − $5,299). The gap is almost all impact fees. Celina’s table was recalculated in 2025, while the latest Frisco and McKinney tables we found date from 2019 and 2020 and are marked for review on their pages. And the July 2025 report puts eligible water and wastewater costs, with financing, at about $1.41 billion over ten years, spread over 41,304 new service units. Tap charges are closer: McKinney’s 1-inch water plus 4-inch sewer tap is $3,080, Celina’s pair $3,675.

Costs outside the Celina fee schedule

National figures are estimates from our benchmark set. The calculator adds your line lengths to Celina’s published fees:

Estimate utility connection costs

Estimates are planning figures, not quotes. Confirm fees and trench rules with your utility.

Location and property
Services and site work

Many codes require horizontal separation between water and sewer. This estimate assumes separate water and sewer trenches unless you select a shared run where your utility allows it.

Quoted fees and comparison assumptions

Paying Celina fees: timing and process

The Master Fee Chart lists impact fees among the building permit fees for new one- and two-family dwellings, noting the amount “may vary with agreement”, so a development agreement can change what a builder pays. The city installs meters up to 2 inches. Taps and meters larger than 2 inches, and sewer taps larger than 4 inches, must be installed by the contractor, and larger meters need a vault built to the city’s engineering standards. The documents we read do not give wait times for connections or meter sets.

Most of the cost of connecting a new Celina home is the impact fee, and which table applies depends on the plat. Before you buy a lot or price a build, ask the city (or the developer) for the lot’s assessed impact fee and whether a development agreement changes it.

Celina fee changes to watch

Celina tap fee FAQ

How much are Celina’s water and wastewater impact fees?

Under Ordinance 2025-71 (August 12, 2025), a single-family 1-inch meter pays $6,815 for water and $10,233 for wastewater, $17,048 combined. A 3/4-inch meter is listed at $4,259 and $6,395, but new homes use the 1-inch minimum.

Why does a new Celina home need a 1-inch meter?

Celina’s Master Fee Chart lists the 1-inch meter ($480) as the minimum size and sells 3/4-inch meters ($415) for existing meters only. So a new house is priced from the 1-inch rows.

How much does Celina charge for water and sewer taps?

The fee chart lists $2,175 for a 1-inch water connection and $1,500 for a 4-inch sewer tap. Boring adds $1,200 on the water side and $1,000 on the sewer side, and street or easement repairs are billed at actual cost.

My lot was platted before August 2025. Do I pay the new impact fees?

It depends on the plat date. The city’s draft worksheet applies the 2025 table to plats on or after March 12, 2025, the 2021 rate ($4,400 water, $5,200 wastewater for 1 inch) to plats from July 13, 2021 through March 11, 2025, and the 2014 table ($4,981 and $4,007) to earlier plats. The worksheet is a draft and its March date comes before the ordinance’s August 12, 2025 passage, so confirm the assessed amount with the city.

Why are Celina’s fees so much higher than Frisco’s or McKinney’s?

Celina’s fee was recalculated in 2025 to fund a large growth program: about $1.41 billion in eligible water and wastewater costs over ten years. The latest Frisco and McKinney tables we found date from 2019 and 2020. For a 1-inch meter, Celina’s published total is $17,528, against $6,238 in McKinney and $5,299 in Frisco.

Related: Texas utility connection costs by city · McKinney fees · Frisco fees · tap fee vs. impact fee · water tap fees · sewer tap fees · utility connection cost calculator

Sources for Celina figures